Tulip Lemon
by Tulip Infratech · Sector 69, Gurugram
Not on our price list yet
Possession 6 Feb 2019 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 69, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Registered by
- PREMIUM INFRATECH PVT LTDthe company that filed it, for Tulip Infratech
- 23 Dec 2014Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
- 2 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
- 6 Feb 2019Possession, as declareddeclared to HARERA, read 15 Oct 2026
- 23 Nov 2019Registration valid toHARERA, read 4 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 3,000 sq ft and above3,080–3,836 sq ft754
Carpet area per home, as declared to HARERA (read 15 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- KitchenMarble/granite counter with sink
- LiftsCapacity 10 & 13 person, KONE or eqivalent
- FloorsCeramic tiles or equivalent
- WallsWhite WASH
- BathroomsWhite sanitary, CP fitting and mirror
- WindowsHardwood/ shutter window
- Main doorFlush door
- Electrical fittingsSwitches only (no lights & fixtures)
The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.8 km
- Delhi–Gurugram–SNB RRTS4.6 km
- Dwarka ExpresswayOpen, 17 Aug 20254.7 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 2
- Registered, no OC or CC yet: 4
- Other register states: 3
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Ocean Seven Buildtech | Same sector | — | — | 13 Feb 2023 |
TRUMP RESIDENCES GURGAONNo photo on file yet | Riverday Infrastructure | Same sector | — | — | 30 Apr 2033 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 6 Feb 2019 |
![]() | Smartworld Developers | Same sector | Under construction | ₹20,000/sq ft | 31 May 2032 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 31 Aug 2019 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 31 Dec 2027 |
| Pareena Infrastructures | 1.1 kmto its sector’s point | — | — | 11 Mar 2024 | |
Orion GalaxyNo photo on file yet | Soni Infratech | 1.1 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Tulip Lemon registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 31 OF 2017, registered on 2 Aug 2017. Ended 23 Nov 2019. The register shows it as: Registration expired.
The source ↗What is the possession timeline for Tulip Lemon?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 6 Feb 2019. Its registration runs to 23 Nov 2019; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Tulip Lemon?From the records · Map pin and road lines, read 6 Sep 2026
Tulip Lemon is in Sector 69, Gurugram; the site address declared to HARERA is Sector 69 & 70, Gurugram. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 4.6 km from Delhi–Gurugram–SNB RRTS and 4.7 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Tulip Lemon?From the records · HARERA, read 4 Nov 2026
Tulip Lemon is a Tulip Infratech project, registered by its company PREMIUM INFRATECH PVT LTD.
The source ↗Tulip Infratech's projects and court recordThe records
What the registers hold for Tulip Lemon: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 31 OF 2017: Registration expired. Ended 23 Nov 2019.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 132 OF 2014 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 24 Aug 2019.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 23 Dec 2014, building plans 23 Dec 2014.Declared to HARERA, read 15 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 23 Nov 2019. HARERA Gurugram, read 4 Nov 2026. Source
Amber flag: Licence 132 OF 2014 validity ended
Named in this project’s application. Valid to 24 Aug 2019. The register links a completion certificate (LC-IX), dated 2 Jul 2021, against this licence. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 14 HARERA files, with the dates we read them
- Registration no.
- 31 OF 2017
- Registration date
- 2 Aug 2017
- Registration valid till
- 23 Nov 2019
- Declared possession
- 6 Feb 2019
Declared by the promoter to HARERA
- Land area
- 5.06875 (Acre) (20,512.5 sq m)
- FAR
- the application prints 225, which is not a ratio
- licence
- Licence No 132 of 2014 dated 27.08.2014
- Estimated project cost
- the application prints ₹136.71 lakh crore, which is not a plausible figure
- Cost of land
- the application prints ₹51.39 lakh crore, which is not a plausible figure
- Layout plan, declared approved (field 5a)
- 23 Dec 2014
- Building plans, declared approved
- 23 Dec 2014
- Construction to start
- 20 Sept 2017
- Completion declared for
- 6 Feb 2019
Declared inventory · 2 types
Declared inventory
- Apartment/Shops/Other Buildings · 714 units · 356.373 sq m carpet · 6 towers · one flat
- Apartment/Shops/Other Buildings · 40 units · 286.138 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 1
Statutory approvals, as declared
- I. SITE PLAN — declared: already been obtained (23 Dec 2014)
On file with HARERA · 14 files
On file with HARERA (14)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileCompletion certificate (CC)
1 fileDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
132 OF 2014 · Premium Infratech Pvt. Ltd. C/o Tulip Infratech · GURGAON-MANESAR
Licence valid to 24 Aug 2019
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Feb 2020 · read 15 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
132 OF 2014: 10 parcels, 5.0687 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.
The licence register prints the same licensed area, 5.07 acres.
- 78//5/14 kanal 8 marla
- 78//5/2/118 marla
- 78//6 min3 kanal 1 marla
- 77//2/1/26 kanal 1 marla
Show the other 6 parcels
- 77//2/2/215 marla
- 77//37 kanal 2 marla
- 77//87 kanal 16 marla
- 77//98 kanal
- rectangle 77, kila 1/12 kanal 3 marla 3 sarsai
- rectangle 77, kila 2/1/1/16 marla 6 sarsai
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 78//5/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,950 per sq ft
Sector 69, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (14 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1289 · read 15 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Tulip Infratech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.