Hues Towers-A, B, E, F, G, H, M, N, K, T, V, W, O, P, C, & D and Azalia Towers-T-1, T-2, T-3, T-4, T-5, T-6 & T-7

by Supertech · Sector 68, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 68, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
Home types
1, 2 and 3 BHK
Carpet area
334–973 sq ft
In m²about 31–90 m², as declared
Registered
4 Sep 2017
Registered by
SARV REALTORS PVT LTD AND DSC ESTATE DEVELOPERS PVT LTDthe company that filed it, for Supertech
Timeline
  1. 2 Feb 2017Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 4 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2021Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

2,856homes, 334 to 973 sq ft of carpet area
  • Under 1,000 sq ft334–973 sq ft2,856

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside32.83 acres in all, by use
  • Roads13.407 acres · 41%
  • Apartment buildings11.793 acres · 36%
  • Parks and playgrounds5.02 acres · 15%
  • Other uses2.61 acres · 8%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenInternal- internal walls in cement plaster with POP and OBD
  • FloorsVitrified tiles or equivalent quality.
  • WallsTiles in walls TILL 7'-0" HT. for the toilet, balance painted in acrylic emulsion paint.
  • BathroomsW.C and washbasins in matching shades/colours, single lever C.P fittings , all toilets WILL include exhaust fan
  • WindowsUPVC windows & wooden frame for doors
  • Electrical fittingsAs per standard / sales broucher
  • Gas pipelineAs per standard / sales broucher
  • Water storageAs per standard / sales broucher

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 68, GurugramSector 68, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20255.7 km
  • Delhi–Gurugram–SNB RRTS5.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Hues Towers-A, B, E, F, G, H, M, N, K, T, V, W, O, P, C, & D and Azalia Towers-T-1, T-2, T-3, T-4, T-5, T-6 & T-7 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 182 OF 2017, registered on 4 Sep 2017. The register’s record shows an end date of 31 Dec 2021. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Hues Towers-A, B, E, F, G, H, M, N, K, T, V, W, O, P, C, & D and Azalia Towers-T-1, T-2, T-3, T-4, T-5, T-6 & T-7?From the records · Map pin and road lines, read 6 Sep 2026

Hues Towers-A, B, E, F, G, H, M, N, K, T, V, W, O, P, C, & D and Azalia Towers-T-1, T-2, T-3, T-4, T-5, T-6 & T-7 is in Sector 68, Gurugram; the site address declared to HARERA is Sector-68, Badshahpur,. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Dwarka Expressway and 5.7 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Hues Towers-A, B, E, F, G, H, M, N, K, T, V, W, O, P, C, & D and Azalia Towers-T-1, T-2, T-3, T-4, T-5, T-6 & T-7?From the records · HARERA, read 4 Nov 2026

Hues Towers-A, B, E, F, G, H, M, N, K, T, V, W, O, P, C, & D and Azalia Towers-T-1, T-2, T-3, T-4, T-5, T-6 & T-7 is a Supertech project, registered by its company SARV REALTORS PVT LTD AND DSC ESTATE DEVELOPERS PVT LTD.

The source ↗Supertech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Hues Towers-A, B, E, F, G, H, M, N, K, T, V, W, O, P, C, & D and Azalia Towers-T-1, T-2, T-3, T-4, T-5, T-6 & T-7: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 182 OF 2017: Registration lapsed. The register’s record shows an end date of 31 Dec 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 2 Feb 2017, building plans 2 Feb 2017.Declared to HARERA, read 29 Oct 2026
The court record of Supertech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2021. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
Registration no.
182 OF 2017
Registration date
4 Sept 2017
Registration valid till
31 Dec 2021

Declared by the promoter to HARERA

Land area
32.83 (Acre) (1,32,858.3 sq m)
FAR
the application prints 32.83, which is not a ratio
licence
106,89,134,and 136
Estimated project cost
₹1674.37 crore
Cost of land
₹286.74 crore
Layout plan, declared approved (field 5a)
2 Feb 2017
Building plans, declared approved
2 Feb 2017
Declared inventory · 6 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK · 992 units · 58.04 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK+ STUDY · 448 units · 74.57 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK · 224 units · 90.42 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 1BHK · 624 units · 31.02 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK · 88 units · 67.8 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK · 480 units · 52.74 sq m carpet · one flat
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE APPROVAL — declared: already been obtained (9 Mar 2015)
  • II. HEIGHT NOC — declared: already been obtained (13 Dec 2013)
  • III. FIRE SCHEME APPROVAL — declared: already been obtained (19 Apr 2017)
On file with HARERA · 9 files

On file with HARERA (9)

Plans

Site plan

1 file
Approved Site Plan6 Dec 2019

Layout plan

1 file
Latest Layout Plan6 Dec 2019

Zoning plan

1 file
Zoning Plan6 Dec 2019

Demarcation plan

1 file
Demarcation Plan6 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set6 Dec 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule6 Dec 2019

Money

Accounts and finance

2 files
Cash Flow Statement6 Dec 2019Non-Default Certificate from a CA6 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Dec 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared 106,89,134,and 136. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate, residential flat
₹6,400 per sq ft

this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan6 Dec 2019

Layout plan

1 file
Latest Layout Plan6 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set6 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (9 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1060 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Supertech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.