by Spaze Towers · Sector 78, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 78, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
about 380 sq ft
In m²about 35.3 m², the average flat, as declared
Registered
11 Jan 2018
Registered by
SPAZE TOWERS PVT. LTD.the company that filed it, for Spaze Towers
Timeline
  1. 28 Feb 2013Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 11 Jan 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 10 Sep 2019Building plans approveddeclared to HARERA, read 29 Oct 2026
  4. 31 Dec 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3.247 acres in all, by use
  • Apartment buildings1.292 acres · 40%
  • Other usesas the form names them: Rain0.735 acres · 23%
  • Roads0.646 acres · 20%
  • Pavements0.515 acres · 16%
  • Parking0.059 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningScrew chillers, split AC unit
  • LiftsMitusubishi/johnson/schindler
  • FloorsStone finish/granite tiles/vitrified tiles
  • WallsPaint finish, stone finish,
  • BathroomsAnti-skid vitrified tiles , ceramic tiles, with acrylic emulsion paint
  • WindowsFrame LESS glazingpowder coated aluminium glazing & shutters
  • Electrical fittingsSyska, bajaj, EQUI.
  • Wi-Fi and broadbandService provider

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 78, GurugramSector 78, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.2 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 5
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Ishan Singh registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 13 OF 2018, registered on 11 Jan 2018. The register’s record shows an end date of 31 Dec 2025. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Ishan Singh?From the records · Map pin and road lines, read 6 Sep 2026

Ishan Singh is in Sector 78, Gurugram; the site address declared to HARERA is Sector-78, Village Naurangpur, Gurugram. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 4.2 km from Dwarka Expressway and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Ishan Singh?From the records · HARERA, read 4 Nov 2026

Ishan Singh is a Spaze Towers project, registered by its company SPAZE TOWERS PVT. LTD..

The source ↗Spaze Towers's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Ishan Singh: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 13 OF 2018: Registration lapsed. The register’s record shows an end date of 31 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 56 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 5 Jun 2020.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Feb 2013, building plans 10 Sep 2019.Declared to HARERA, read 29 Oct 2026
The court record of Spaze Towers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 56 OF 2012 lapsed

    Named in this project’s application. Valid to 5 Jun 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 33 HARERA files, with the dates we read them
Registration no.
13 OF 2018
Registration date
11 Jan 2018
Registration valid till
31 Dec 2025

Declared by the promoter to HARERA

Land area
3.24722 (Acre) (13,141.03 sq m)
FAR
1.78 proposed of 1.78 permissible
licence
56 of 2012 date 06.06.2012
Estimated project cost
₹136.74 crore
Cost of land
₹14.89 crore
Layout plan, declared approved (field 5a)
28 Feb 2013
Building plans, declared approved
10 Sept 2019
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL/ OFFICE/SERVICE APARTMENTS · 479 units · 16,913.65 sq m carpet · total for 479 flats, about 35.3 m² each
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. AAI NOC — declared: already been obtained (2 Apr 2019)
  • II. ENVIRONMENT CLEARANCE — declared: already been obtained (10 Sept 2019)
  • III. ZONING — declared: already been obtained (7 Jun 2012)
  • IV. REVISED BUILDING PLAN — declared: already been obtained (10 Sept 2019)
On file with HARERA · 33 files

On file with HARERA (33)

Plans

Site plan

1 file
Approved Site Plan28 Dec 2019

Layout plan

1 file
Latest Layout Plan28 Dec 2019

Zoning plan

1 file
Zoning Plan28 Dec 2019

Demarcation plan

1 file
Demarcation Plan28 Dec 2019

Building plans

3 files
Revised BR-III Arrow29 Feb 2020Building Plan Approval29 Feb 2020Approved Building Plans, Full Set28 Dec 2019

Services

Sewerage and drainage

1 file
Service Estimate Sewer30 Dec 2019

Water supply

1 file
Service Estimate Water30 Dec 2019

Service plans

1 file
Service Plans on the Layout30 Dec 2019

Approvals and clearances

DTCP licence

6 files
LOI Sec-7829 Feb 2020LC - IV Arrow29 Feb 2020License - 7829 Feb 2020

Fire safety

1 file
Service Estimate Fire30 Dec 2019

Other NOCs and clearances

2 files
Forest NOC29 Feb 2020AAI NOC, Till 01.04.2027 Sec-7829 Feb 2020

Land records

Land records

1 file
Collaboration Agreement No29 Feb 2020

Sales papers

Allotment and sale agreements

2 files
Allotment Letter30 Dec 2019BBA30 Dec 2019

Money

Accounts and finance

8 files
Cash Flow Statement Arrow29 Feb 2020Project Report Arrow30 Dec 2019Balance Sheet 201830 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit28 Dec 2019

Other filings

Other filings

2 files
Project Continuation- Rc/rep/harera/ggm/ 13 of 2018/7(3)/2022/14 Dated 13.12.202216 Jan 2023EC Arrow29 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

56 OF 2012 · Spaze Towers · GURGAON-MANESAR

Licence valid to 5 Jun 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

56 OF 2012: 11 parcels, 3.2472 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.

The licence register prints the same licensed area, 3.25 acres.

  • 6//11/217 marla
  • 6//11/36 marla
  • 6//11/43 kanal 9 marla
  • 6//11/519 marla
Show the other 7 parcels
  • 6//12/22 kanal 2 marla
  • 6//209 kanal
  • 6//21/1 min1 kanal 9 marla 5 sarsai
  • 6//21/24 kanal 6 marla
  • 7//1/1 min9 marla
  • 7//1/2 min19 marla
  • 8//5/2/22 kanal 3 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 6//11/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,00,400 per sq yd

this sector, collector rates effective 1 Apr 2026, Manesar tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan28 Dec 2019

Layout plan

1 file
Latest Layout Plan28 Dec 2019

Building plans

3 files
Revised BR-III Arrow29 Feb 2020Building Plan Approval29 Feb 2020Approved Building Plans, Full Set28 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (33 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1151 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Spaze Towers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.