Revanta
by Raheja Developers · Sector 78, Gurugram
Not on our price list yet
Possession 27 Aug 2022 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 78, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- M/S RAHEJA DEVELOPERS LIMITEDthe company that filed it, for Raheja Developers
- 24 Apr 2017Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 4 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
- 4 Aug 2022Registration valid toHARERA, read 4 Nov 2026
- 27 Aug 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft679–985 sq ft262
- 1,000–1,500 sq ft1,001–1,470 sq ft104
- 1,500–2,000 sq ft1,585–1,969 sq ft174
- 2,000–2,500 sq ft2,224 sq ft6
- 2,500–3,000 sq ft2,568 sq ft2
- 3,000 sq ft and above3,483 sq ft12
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 148 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Air-conditioningSplit unit ACS in every bedroom and living/dining room as per PLAN
- KitchenFloors: combination of one or MORE of designer tiles/granite/marble • fittings & fixtures: modular kitchen with granite counter, SS sink and CP fittings • walls: 2’high glazed tiles above counter and oil bound distemper on remaining area • ceilings: oil bound distemper
- LiftsBranded high speed lifts • floors: imported marble/granite flooring • walls: combination of one or MORE of granite/marble/ terrazzo/ oil bound distemper • ceilings: premium plastic emulsion paint
- Floors• floors: designer tiles/ marble
- Walls• walls: plastic emulsion paint
- Bathrooms• floors: combination of one or MORE of designer tiles/marble • fittings & fixtures: single lever CP fittings, wall hung WC, shower panels in all toilets (except servant toilet and powder room) • walls: combination of one or MORE of designer tiles • ceilings: GYP. board /calcium silicate/POP false ceiling with integrated CFL light fittings and provision for hiding geyser over IT
- Windows• door frame with paneled shutters. FIRE proof engineered doors where required • aluminum frame with DGU glass.
- Electrical fittingsModular switches, copper eletrical wiring throughout in concealed conduit with provision for light points, power points,TV, LAN and telephone sockets
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS1.3 km
- Dwarka ExpresswayOpen, 17 Aug 20254.2 km
- Sohna Elevated Corridor (NH-248A)7.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Other register states: 15
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
PALM COUNTYNo photo on file yet | Conmin Infradevelopers | Same sector | — | — | 5 Mar 2027 |
SUNCITY'S MONARCH RESIDENCESNo photo on file yet | Dvok Buildcon | Same sector | — | — | 31 Mar 2031 |
| Ganga Realty | Same sector | — | — | 6 Mar 2026 | |
GRACE RESILVIAANo photo on file yet | Hercules Ventures | Same sector | — | — | 30 Sep 2029 |
PALM MEADOWSNo photo on file yet | Dadri Land & Finance | Same sector | — | — | 2 Jul 2028 |
No photo of the project on file yet | Pegasus Land and Housing | Same sector | — | — | 12 May 2027 |
MAPSKO ASPR HILLSNo photo on file yet | Mapsko Builders | Same sector | — | — | 14 Jan 2027 |
The ValleyNo photo on file yet | Revital Reality | Same sector | — | — | 28 Feb 2023 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Revanta registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 32 OF 2017, registered on 4 Aug 2017. The register’s record shows an end date of 4 Aug 2022. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for Revanta?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 27 Aug 2022. Its registration runs to 4 Aug 2022; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Revanta?From the records · Map pin and road lines, read 6 Sep 2026
Revanta is in Sector 78, Gurugram; the site address declared to HARERA is Sector 78, Gurugram, Haryana. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 4.2 km from Dwarka Expressway and 7.8 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Revanta?From the records · HARERA, read 4 Nov 2026
Revanta is a Raheja Developers project, registered by its company M/S RAHEJA DEVELOPERS LIMITED.
The source ↗Raheja Developers's projects and court recordThe records
What the registers hold for Revanta: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 32 OF 2017: Registration lapsed. The register’s record shows an end date of 4 Aug 2022.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 32 OF 2017 is on the DTCP register: Licence lapsed; the register prints its validity to 14 Jun 2022.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 24 Apr 2017, building plans 24 Apr 2017.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Licence 32 OF 2017 lapsed
Named in this project’s application. Valid to 14 Jun 2022; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Red flag: Licence 49 OF 2011 lapsed
Named in this project’s application. Valid to 31 May 2021; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Amber flag: Registration lapsed
The register’s record shows an end date of 4 Aug 2022. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 10 HARERA files, with the dates we read them
- Registration no.
- 32 OF 2017
- Registration date
- 4 Aug 2017
- Registration valid till
- 4 Aug 2022
- Declared possession
- 27 Aug 2022
Declared by the promoter to HARERA
- Land area
- 18.7213 (Acre) (75,762.41 sq m)
- FAR
- the application prints 32.6, which is not a ratio
- licence
- 32 of 2017
- Estimated project cost
- ₹992.86 crore
- Cost of land
- ₹225.58 crore
- Layout plan, declared approved (field 5a)
- 24 Apr 2017
- Building plans, declared approved
- 24 Apr 2017
- Completion declared for
- 27 Aug 2022
Declared inventory · 43 types
Declared inventory — 43 types declared, first 8 shown
- APARTMENT/SHOPS/OTHER BUILDINGS Type HIGH RISE 1 BHK · 40 units · 63.12 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK TYPE 1 · 162 units · 90.9 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE I(LAWN) · 6 units · 90.9 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE II · 16 units · 89.96 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE II-T · 2 units · 89.96 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE III · 16 units · 93 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE III-T · 2 units · 93 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE IV · 16 units · 91.5 sq m carpet · one flat
Statutory approvals, as declared · 9
Statutory approvals, as declared
- I. LICENSE NUMBER 49 OF 2011 — declared: already been obtained (1 Jun 2011)
- II. NOC FOR NON ARAVALLI HILLS — declared: already been obtained (9 Oct 2012)
- III. CTE EXTENSION NO. HSPCB/CONSENT/:2821217GUSOCTE3523322 — declared: already been obtained (6 Feb 2017)
- IV. NOC FOR NON-FOREST HILLS LAND — declared: already been obtained (30 Jan 2013)
- V. FOREST NOC — declared: already been obtained (24 Dec 2012)
- VI. ENVIRONMENT CLEARANCE — declared: already been obtained (31 Jul 2017)
- VII. HUDA WATER PERMISSION — declared: already been obtained (9 Oct 2015)
- VIII. POWER ASSURANCE — declared: already been obtained (28 Oct 2016)
- IX. AAI REVALIDATION LETTER NO. AAI/RHQ/NR/ATM/NOC/REVALIDATION/2008/134/194-97 — declared: already been obtained (24 Feb 2016)
On file with HARERA · 10 files
On file with HARERA (10)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 2 DTCP licences named on the application
32 OF 2017 · One Point Realty Pvt. Ltd. · Rohtak
Licence valid to 14 Jun 2022
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
49 OF 2011 · Raheja Developers · GURGAON-MANESAR
Licence valid to 31 May 2021
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 7 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 2 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
32 OF 2017: 39 parcels, 10.4891 acres in all, in Rohtak (hadbast 225), tehsil Rohtak.
The licence register prints the same licensed area, 10.49 acres.
- rectangle 6604, kila 13248/6604 min4 biswa 10 biswansi
- rectangle 6628, kila 66281 bigha 3 biswa
- rectangle 6630, kila 6630/211 biswa
- rectangle 6607, kila 66071 bigha 6 biswa
Show the other 35 parcels
- rectangle 6608, kila 15843/66089 biswa
- rectangle 6614, kila 661414 biswa
- rectangle 6615, kila 66159 biswa
- rectangle 6605, kila 660516 biswa
- rectangle 6606, kila 660613 biswa
- rectangle 6612, kila 13281/661211 biswa
- rectangle 6612, kila 15847/13280/66129 biswa
- rectangle 6613, kila 66137 biswa
- rectangle 6631, kila 6631 min10 biswa 10 biswansi
- rectangle 6658, kila 6658min2 biswa
- rectangle 6634, kila 6634min6 biswa
- rectangle 6635, kila 6635min6 biswa 10 biswansi
- rectangle 6670, kila 6670min2 biswa 3 biswansi
- rectangle 6637, kila 6637min1 bigha 3 biswa
- rectangle 6638, kila 66388 biswa
- rectangle 6639, kila 12987/663914 biswa
- rectangle 6640, kila 12989/664018 biswa
- rectangle 6643, kila 12992/66436 biswa
- rectangle 6641, kila 12991/664113 biswa
- rectangle 6642, kila 13261/66424 biswa
- rectangle 6642, kila 13262/66422 biswa
- rectangle 6642, kila 13263/66422 biswa
- rectangle 6642, kila 13264/66424 biswa
- rectangle 6642, kila 13265/66422 biswa
- rectangle 6643, kila 12994/66433 biswa
- rectangle 6644, kila 12997/66443 biswa
- rectangle 6644, kila 13268/12995/66442 biswa
- rectangle 6644, kila 13266/12996/66442 biswa
- rectangle 6644, kila 13267/12995/66442 biswa
- rectangle 6644, kila 13269/12995/66443 biswa
- rectangle 6645, kila 13271/12998/66453 biswa
- rectangle 6629, kila 662916 biswa
- rectangle 6630, kila 6630/112 biswa
- rectangle 6604, kila 13247/660412 biswa
- rectangle 6645, kila 13270/12998/66452 biswa
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
49 OF 2011: 17 parcels, 18.7234 acres in all, in Shikohpur (hadbast 160), tehsil Manesar.
The licence register prints the same licensed area, 18.72 acres.
- rectangle 1596, kila 1596/13 bigha 2 biswa
- rectangle 1596, kila 1596/217 biswa 4 biswansi
- rectangle 1596, kila 1596/31 bigha 6 biswansi
- rectangle 1596, kila 1596/42 bigha 8 biswa
Show the other 13 parcels
- rectangle 1596, kila 1596/5/11 bigha 11 biswa 10 biswansi
- rectangle 1596, kila 1596/5/23 bigha 5 biswa
- rectangle 1595, kila 15952 bigha 5 biswa
- rectangle 1598, kila 15982 bigha 15 biswa
- rectangle 1599, kila 15993 bigha 5 biswa
- rectangle 1600, kila 16002 bigha 13 biswa
- rectangle 1601, kila 16011 bigha 15 biswa
- rectangle 1604, kila 1604/11 bigha 11 biswa
- rectangle 1602, kila 1602/115 biswa
- rectangle 1602, kila 1602/217 biswa
- rectangle 1603, kila 160315 biswa
- rectangle 1606, kila 1606/113 biswa 11 biswansi
- rectangle 1522, kila 1522/1418 min10 biswa 12 biswansi
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district as on the licence, then the tehsil and the village you want: Rohtak (hadbast 225, tehsil Rohtak) or Shikohpur (hadbast 160, tehsil Manesar). The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 6604, kila 13248/6604 min.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,400 per sq ft
this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (10 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/958 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Raheja Developers
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.
