Skip to content

MAPSKO ASPR HILLS

by Mapsko Builders · Sector 78, Gurugram

Not on our price list yet

Possession 14 Jan 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 78, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered by
MAPSKO BUILDERS PVT. LTD.the company that filed it, for Mapsko Builders
Timeline
  1. 26 Dec 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 14 Jan 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 25 Dec 2027Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7.944 acres in all, by use
  • Plots for sale4.514 acres · 57%
  • Roads1.697 acres · 21%
  • Land for community services, handed to the government0.794 acres · 10%
  • Parks and playgrounds0.621 acres · 8%
  • Other usesas the form names them: Commercial plot0.318 acres · 4%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 78, GurugramSector 78, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.2 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is MAPSKO ASPR HILLS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/678/410/2023/22. Valid to 25 Dec 2027.

The source ↗
What is the possession timeline for MAPSKO ASPR HILLS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 14 Jan 2027. Its registration runs to 25 Dec 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MAPSKO ASPR HILLS?From the records · Map pin and road lines, read 6 Sep 2026

MAPSKO ASPR HILLS is in Sector 78, Gurugram; the site address declared to HARERA is Sector 78, Vill - Naurangpur, Gurugram, Haryana. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 4.2 km from Dwarka Expressway and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MAPSKO ASPR HILLS?From the records · HARERA, read 4 Nov 2026

MAPSKO ASPR HILLS is a Mapsko Builders project, registered by its company MAPSKO BUILDERS PVT. LTD..

The source ↗Mapsko Builders's projects and court record

The records

What the registers hold for MAPSKO ASPR HILLS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/678/410/2023/22: Registered. Valid to 25 Dec 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 211 OF 2022 is on the DTCP register, valid to 25 Dec 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 26 Dec 2022.Declared to HARERA, read 29 Oct 2026
The court record of Mapsko Builders’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 20 HARERA files, with the dates we read them
Registration no.
GGM/678/410/2023/22
Registration valid till
25 Dec 2027
Declared possession
14 Jan 2027

Declared by the promoter to HARERA

Land area
7.9437 (Acre) (32,147.01 sq m)
FAR
1 proposed of 1 permissible
licence
211 OF 2022 granted by Department of Town and Country Planning
Estimated project cost
₹111.16 crore
Cost of land
₹68.30 crore
Layout plan, declared approved (field 5a)
26 Dec 2022
Construction to start
15 Jan 2023
Completion declared for
14 Jan 2027
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE: 1 — declared: already been obtained (26 Dec 2022)
  • II. LAYOUT PLAN APPROVAL — declared: already been obtained (26 Dec 2022)
  • III. FOREST NOC — declared: already been obtained (14 Sept 2022)
On file with HARERA · 20 files

On file with HARERA (20)

Plans

Site plan

1 file
Approved Site Plan9 Jan 2023

Layout plan

2 files
Latest Layout Plan6 Apr 2023Superimposed Demarcation Plan on Approved Layout Plan6 Apr 2023

Demarcation plan

1 file
Demarcation Plan6 Apr 2023

Services

Sewerage and drainage

2 files
Sewerage Layout Plan6 Apr 2023Storm Water Drainage6 Apr 2023

Water supply

2 files
Domestic Water Supply Plan6 Apr 2023Flushing Water Supply Plan6 Apr 2023

Electricity

1 file
Street Light Plan6 Apr 2023

Roads

1 file
Road Layout Plan6 Apr 2023

Landscape and green areas

1 file
Landscape Plan6 Apr 2023

Service plans

3 files
Service Estimate Plan Approval6 Apr 2023Service Estimate Plan6 Apr 2023Solid Waste Management Plan6 Apr 2023

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule6 Apr 2023

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration6 Apr 2023

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures6 Apr 2023Non-Default Certificate from a CA6 Apr 2023Cash Flow Statement6 Apr 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Apr 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

211 OF 2022 · Mapsko Builders Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 25 Dec 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Jan 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

211 OF 2022: 15 parcels, 7.9437 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.

The licence register prints the same licensed area, 7.9438 acres.

  • 38//127 kanal 6 marla
  • 38//13/112 marla
  • 38//13/25 kanal 6 marla
  • 38//13/31 kanal 9 marla
Show the other 11 parcels
  • 38//145 kanal 16 marla
  • 38//15/11 kanal 4 marla
  • 38//38 kanal
  • 38//48 kanal
  • 38//8/14 kanal 11 marla
  • 38//8/22 kanal 16 marla
  • 38//9/14 kanal
  • 30//16/318 marla
  • 30//17/32 kanal 1 marla
  • 30//248 kanal
  • 30//25/13 kanal 12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 38//12.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Mapsko ASPR hills”, by MAPSKO BUILDERS PVT. LTD., code Gurgaon-0925-006542, approved 2025.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan9 Jan 2023

Layout plan

2 files
Latest Layout Plan6 Apr 2023Superimposed Demarcation Plan on Approved Layout Plan6 Apr 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (20 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2297 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Mapsko Builders

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.