Skip to content

SUNCITY'S MONARCH RESIDENCES

by Dvok Buildcon · Sector 78, Gurugram

Not on our price list yet

Possession 31 Mar 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 78, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
1,149–1,744 sq ft
In m²about 107–162 m², as declared
Registered by
DVOK BUILDCON LLPthe company that filed it, for Dvok Buildcon
Timeline
  1. 17 Dec 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

900homes, 1,149 to 1,744 sq ft of carpet area
  • 1,000–1,500 sq ft1,149–1,333 sq ft720
  • 1,500–2,000 sq ft1,522–1,744 sq ft180

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside38,469 m² in all, by use
  • Parks and playgrounds14,283 m² · 37%
  • Other uses8,539 m² · 22%
  • Roads6,230 m² · 16%
  • Apartment buildings4,772 m² · 12%
  • Pavements2,929 m² · 8%
  • Parking978 m² · 3%
  • Electricity sub-station739 m² · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningProvided
  • KitchenVitrified tiles, wall tiles 600MM height above kitchen counter SLAB in appropriate colour & paint , premium chrome plated fitting
  • LiftsProvided
  • FloorsImported marble / laminated wooden flooring
  • WallsAcrylic emulsion paint,
  • BathroomsPremium tiles , acrylic emulsion paint on walls & celing, aluminium windows framed laminate finished flush doors , premium chrome plated fitting
  • WindowsAluminium sections - jindal/nalco or equivalent glass - MODI/saint gobain/asahi india or equivalent
  • Main doorEngineered wood framed laminate finished flush doors , aluminium windows framed laminate finished flush doors

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 78, GurugramSector 78, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.2 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SUNCITY'S MONARCH RESIDENCES registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1037/769/2026/09. Valid to 31 Mar 2031.

The source ↗
What is the possession timeline for SUNCITY'S MONARCH RESIDENCES?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2031. Its registration runs to 31 Mar 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SUNCITY'S MONARCH RESIDENCES?From the records · Map pin and road lines, read 6 Sep 2026

SUNCITY'S MONARCH RESIDENCES is in Sector 78, Gurugram; the site address declared to HARERA is Sector 78, Village Shikopur. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 4.2 km from Dwarka Expressway and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SUNCITY'S MONARCH RESIDENCES?From the records · HARERA, read 4 Nov 2026

SUNCITY'S MONARCH RESIDENCES is a Dvok Buildcon project, registered by its company DVOK BUILDCON LLP.

The source ↗Dvok Buildcon's projects and court record

The records

What the registers hold for SUNCITY'S MONARCH RESIDENCES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1037/769/2026/09: Registered. Valid to 31 Mar 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 121 OF 2025 is on the DTCP register, valid to 16 Jul 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 17 Dec 2025, building plans 17 Dec 2025.Declared to HARERA, read 29 Oct 2026
The court record of Dvok Buildcon’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 76 HARERA files, with the dates we read them
Registration no.
GGM/1037/769/2026/09
Registration valid till
31 Mar 2031
Declared possession
31 Mar 2031

Declared by the promoter to HARERA

Land area
9.506 (Acre) (38,469.42 sq m)
FAR
1.98 proposed of 1.98 permissible
licence
License No. 121 of 2025 dated 17.07.2025 under NILP-2022
Estimated project cost
₹2452.51 crore
Cost of land
₹173.14 crore
Layout plan, declared approved (field 5a)
17 Dec 2025
Building plans, declared approved
17 Dec 2025
Construction to start
1 Jan 2026
Completion declared for
31 Mar 2031
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 176 units · 162.03 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 141.44 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 704 units · 123.83 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 16 units · 106.74 sq m carpet · 4 towers · one flat
Statutory approvals, as declared · 14

Statutory approvals, as declared

  • I. FOREST NOC — declared: already been obtained (23 May 2025)
  • II. TREE CUTTING PERMISSION — declared: already been obtained (25 Nov 2025)
  • III. ARAVALI NOC — declared: already been obtained (20 Jun 2025)
  • IV. TREATED WATER NOC FOR CONSTRUCTION ACTIVITY — declared: already been obtained (20 Jun 2025)
  • V. ASSURANCE FOR WATER SUPPLY OF DRINKING WATER — declared: already been obtained (3 Jun 2025)
  • VI. ASSURANCE FOR STORM WATER CONNECTION — declared: already been obtained (10 Oct 2025)
  • VII. ASSURANCE FOR SEWERAGE WATER CONNECTION — declared: already been obtained (3 Jun 2025)
  • VIII. LICENSE — declared: already been obtained (17 Jul 2025)
  • IX. REVISED ZONING PLAN CUM DEMARCATION PLAN — declared: already been obtained (20 Nov 2025)
  • X. PHASING PLAN — declared: already been obtained (20 Nov 2025)
  • XI. BUILDING PLAN PHASE 1 — declared: already been obtained (17 Dec 2025)
  • XII. ENVIRNOMENT CLEARENCE — declared: already been obtained (17 Nov 2025)
  • XIII. AIRPORT AUTHORITY APPROVAL / NOC — declared: already been obtained (25 Jul 2025)
  • XIV. ELECTRICAL LOAD ASSURANCE / SANCTION — declared: already been obtained (4 Jun 2025)
On file with HARERA · 76 files

On file with HARERA (76)

Plans

Site plan

2 files
Site Plan Stilt Lvl21 Jan 2026Approved Site Plan18 Dec 2025

Layout plan

1 file
Latest Layout Plan18 Dec 2025

Zoning plan

2 files
Revised Zoning & Phasing Approval Letter21 Jan 2026Zoning Plan18 Dec 2025

Demarcation plan

1 file
Demarcation Plan18 Dec 2025

Building plans

12 files
Building Plan Approval Letter BR -III21 Jan 2026Site Section S121 Jan 2026Terrace Plan 4 Towers21 Jan 2026

Floor plans

7 files
Basement 221 Jan 2026Open Area Calculation21 Jan 2026Basement Plan 121 Jan 2026

Services

Sewerage and drainage

1 file
Assurance for Water, Sewer and Storm21 Jan 2026

Water supply

1 file
Water Supply Sld21 Jan 2026

Electricity

1 file
Electrical Load Sanction Assurance21 Jan 2026

Service plans

1 file
Application for Approval of Service Plan Estimate21 Jan 2026

Approvals and clearances

DTCP licence

3 files
LOI21 Jan 2026LC-IV21 Jan 2026Licence Copy with Land Schedule17 Dec 2025

Environment clearance

1 file
Environment Clearance21 Jan 2026

Fire safety

2 files
Fire Sld21 Jan 2026Application Fire Fighting Scheme21 Jan 2026

Other NOCs and clearances

5 files
Forest NOC21 Jan 2026Mining Permission21 Jan 2026Tree Cutting Permission21 Jan 2026

Land records

Land records

7 files
Non-Encumbrance Certificate21 Jan 2026Sale Deeds21 Jan 2026Jamabandi21 Jan 2026

Sales papers

Allotment and sale agreements

3 files
Draft Conveyance Deed21 Jan 2026Draft Allotment Letter21 Jan 2026Draft Builder Buyer Agreement21 Jan 2026

Money

Accounts and finance

13 files
CA Certificate on the Application’s Figures21 Jan 2026CA Certificate for Cost Incurred and to Be Incurred21 Jan 2026Demand Drafts21 Jan 2026

Timeline and progress

Progress and photographs

1 file
Quarterly Statment Fund Flow21 Jan 2026

The promoter’s papers

Declarations and affidavits

9 files
Affidavit No Project Loan21 Jan 2026Affidavit Annexure C No Litigation21 Jan 2026The Promoter’s Declaration on Affidavit21 Jan 2026

Other filings

Other filings

3 files
Details of Other Expenses21 Jan 2026Kitchen Toilet Crown21 Jan 2026Tdr Utilization Certificate21 Jan 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

121 OF 2025 · DVOK Buildcon LLP · GURGAON-MANESAR

Licence valid to 16 Jul 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Dec 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

121 OF 2025: 15 parcels, 20.625 acres in all, in Shikohpur (hadbast 160), tehsil Manesar.

The licence register prints the same licensed area, 20.625 acres.

  • rectangle 0, kila 9543 bigha 8 biswa
  • rectangle 0, kila 9551 bigha 3 biswa
  • rectangle 0, kila 9571 bigha 18 biswa
  • rectangle 0, kila 9594 bigha
Show the other 11 parcels
  • rectangle 0, kila 9646 bigha 13 biswa
  • rectangle 0, kila 9652 bigha 4 biswa
  • rectangle 0, kila 13141 bigha 14 biswa
  • rectangle 0, kila 2499/972/21 bigha 2 biswa
  • rectangle 0, kila 13136 bigha 13 biswa
  • rectangle 0, kila 568/114 biswa
  • rectangle 0, kila 960/11 bigha 14 biswa
  • rectangle 0, kila 2489/56912 biswa
  • rectangle 0, kila 5706 biswa
  • rectangle 0, kila 2488/5693 biswa
  • rectangle 0, kila 131516 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Shikohpur (hadbast 160), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 0, kila 954.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan Stilt Lvl21 Jan 2026Approved Site Plan18 Dec 2025

Layout plan

1 file
Latest Layout Plan18 Dec 2025

Building plans

12 files
Building Plan Approval Letter BR -III21 Jan 2026Site Section S121 Jan 2026Terrace Plan 4 Towers21 Jan 2026Section Ab 4 Tower21 Jan 2026Terrace Plan Crown21 Jan 2026Pdr Sanction21 Jan 2026

Floor plans

7 files
Basement 221 Jan 2026Open Area Calculation21 Jan 2026Basement Plan 121 Jan 2026Floor Plan Crown21 Jan 2026Basement 321 Jan 2026Floor Plan 4TOWERS21 Jan 2026Kitchen Tolilet 4 Tower21 Jan 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (76 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3775 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Dvok Buildcon

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.