Skip to content

ROF AMBLISS

by Pegasus Land and Housing · Sector 78, Gurugram

Not on our price list yet

Possession 12 May 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 78, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
493–645 sq ft
In m²about 46–60 m², as declared
Registered by
PEGASUS LAND AND HOUSING PRIVATE LIMITEDthe company that filed it, for Pegasus Land and Housing
Timeline
  1. 12 Apr 2027Registration valid toHARERA, read 3 Nov 2026
  2. 12 May 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

798homes, 493 to 645 sq ft of carpet area
  • Under 1,000 sq ft493–645 sq ft798

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.375 acres in all, by use
  • Parking2.654 acres · 49%
  • Apartment buildings1.483 acres · 28%
  • Parks and playgrounds0.821 acres · 15%
  • Other usesas the form names them: Solid waste management, Area under commercial units0.204 acres · 4%
  • Electricity sub-station0.104 acres · 2%
  • Club house0.055 acres · 1%
  • Roads0.053 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningNot provided
  • KitchenCeramic tiles, paint, green marble, sink
  • Kitchen appliancesNot provided
  • Lifts12-13 passenger with ARD
  • WardrobesNot provided
  • FloorsCeramic/vitrified tiles
  • WallsGypsum plaster
  • BathroomsPART ceramic tiles, PART false ceiling

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 78, GurugramSector 78, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.2 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 3
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ROF AMBLISS registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/599/331/2022/74. Valid to 12 Apr 2027.

The source ↗
What is the possession timeline for ROF AMBLISS?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 12 May 2027. Its registration runs to 12 Apr 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ROF AMBLISS?From the records · Map pin and road lines, read 6 Sep 2026

ROF AMBLISS is in Sector 78, Gurugram; the site address declared to HARERA is Village-Shikohpur, Sector-78. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 4.2 km from Dwarka Expressway and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ROF AMBLISS?From the records · HARERA, read 3 Nov 2026

ROF AMBLISS is a Pegasus Land and Housing project, registered by its company PEGASUS LAND AND HOUSING PRIVATE LIMITED.

The source ↗Pegasus Land and Housing's projects and court record

The records

What the registers hold for ROF AMBLISS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/599/331/2022/74: Registered. Valid to 12 Apr 2027.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 58 OF 2022 is on the DTCP register, valid to 12 May 2027.DTCP, read 3 Nov 2026
The court record of Pegasus Land and Housing’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 12 Apr 2027. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 39 HARERA files, with the dates we read them
Registration no.
GGM/599/331/2022/74
Registration valid till
12 Apr 2027
Declared possession
12 May 2027

Declared by the promoter to HARERA

Land area
5.375 (Acre) (21,751.85 sq m)
FAR
2.37 proposed of 2.37 permissible
licence
58 OF 2022 DATED 13.05.2022
Estimated project cost
₹170.00 crore
Cost of land
₹42.73 crore
Construction to start
1 Aug 2022
Completion declared for
12 May 2027
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 292 units · 59.74 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 290 units · 59.96 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 108 units · 45.82 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 108 units · 46.78 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (13 May 2022)
  • II. BUILDING PLAN APPROVAL — declared: already been obtained (19 Jul 2022)
  • III. ZONING PLAN — declared: already been obtained (16 May 2022)
On file with HARERA · 39 files

On file with HARERA (39)

Plans

Site plan

2 files
Site Plan Green and Parking3 Aug 2022Approved Site Plan3 Aug 2022

Layout plan

2 files
Coordinate Layout3 Aug 2022Latest Layout Plan13 Jul 2022

Zoning plan

1 file
Zoning Plan3 Aug 2022

Demarcation plan

2 files
Demarcation Plan3 Aug 2022Superimpose Demarcation3 Aug 2022

Building plans

13 files
Floor Plan, Area Diagram and Terrace Plan T4&53 Aug 2022Section at A-A and B-B T63 Aug 2022BR-III3 Aug 2022

Floor plans

6 files
Ground Floor and First Floor3 Aug 2022Ground Floor and First Floor3 Aug 2022Ground Floor Plan and 1st Floor Plan Area Diagram T33 Aug 2022

Services

Sewerage and drainage

2 files
Service Plan- Sewage3 Aug 2022Service Plan- Storm Water Lay Out3 Aug 2022

Water supply

1 file
Service Plan- Water Supply3 Aug 2022

Roads

1 file
Service Plan- El and Road3 Aug 2022

Service plans

1 file
Service Estimates Letter Applied3 Aug 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule9 Jul 2022

Fire safety

1 file
Service Plan- Fire Fighting3 Aug 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration9 Jul 2022

Money

Accounts and finance

2 files
CA Certificate on the Application’s Figures3 Aug 2022Non-Default Certificate from a CA3 Aug 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit13 Jul 2022

Other filings

Other filings

2 files
Anganwadi and Community Hall3 Aug 2022Commercial3 Aug 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

58 OF 2022 · Pegasus Land & Housing Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 12 May 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Jul 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

58 OF 2022: 4 parcels, 5.375 acres in all, in Shikohpur (hadbast 160), tehsil Manesar.

The licence register prints the same licensed area, 5.375 acres.

  • rectangle 2520, kila 2520/1336/2/14 bigha 5 biswa
  • rectangle 2520, kila 2520/1336/1/11 bigha
  • rectangle 2521, kila 2521/13362 bigha 8 biswa
  • rectangle 1337, kila 133719 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Shikohpur (hadbast 160), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 2520, kila 2520/1336/2/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan Green and Parking3 Aug 2022Approved Site Plan3 Aug 2022

Layout plan

2 files
Coordinate Layout3 Aug 2022Latest Layout Plan13 Jul 2022

Building plans

13 files
Floor Plan, Area Diagram and Terrace Plan T4&53 Aug 2022Section at A-A and B-B T63 Aug 2022BR-III3 Aug 2022Elevation E-1 and 2 T-63 Aug 2022Floor Plan, Area Diagram and Terrace Plan T63 Aug 2022Elevation E-1 and 2 T-1,2,3,4,53 Aug 2022

Floor plans

6 files
Ground Floor and First Floor3 Aug 2022Ground Floor and First Floor3 Aug 2022Ground Floor Plan and 1st Floor Plan Area Diagram T33 Aug 2022Ground Floor Plan and 1st Floor Plan Area Diagram T4&53 Aug 2022Ground Floor Plan and 1st Floor Plan Area Diagram T63 Aug 2022Units Details and Units Area Diagram3 Aug 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (39 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2006 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pegasus Land and Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.