Skip to content

JMD Empire

by JMD · Sector 62, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 62, Gurugram3.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
about 4,122 sq ft
In m²about 383 m², the average flat, as declared
Registered
18 Aug 2017
Registered by
JMD LIMITEDthe company that filed it, for JMD
Timeline
  1. 13 Nov 2013Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 18 Aug 2017Registered with HARERAHARERA, read 3 Nov 2026
  3. 31 Dec 2019Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningNON AC building with provision of DX system cooling for shops. ALSO spilt AC in imperial suites
  • KitchenGranite &tiles; WORK
  • Kitchen appliancesPhilips,LG make
  • LiftsJohnson lifts SIX NOS with MAX. capacity 680 KGS
  • WardrobesYes
  • FloorsGranite & tiles WORK
  • WallsGranite WORK, plastic paints
  • BathroomsHIND WARE, jaguar,TOTO

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 62, GurugramSector 62, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)3.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20258.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is JMD Empire registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 67 OF 2017, registered on 18 Aug 2017. Ended 31 Dec 2019. The register shows it as: Registration expired.

The source ↗
How is the connectivity around JMD Empire?From the records · Map pin and road lines, read 6 Sep 2026

JMD Empire is in Sector 62, Gurugram; the site address declared to HARERA is Village Badshahpur,Sector-67. In a straight line it is about 3.8 km from Sohna Elevated Corridor (NH-248A), 6.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building JMD Empire?From the records · HARERA, read 3 Nov 2026

JMD Empire is a JMD project, registered by its company JMD LIMITED.

The source ↗JMD's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for JMD Empire: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 67 OF 2017: Registration expired. Ended 31 Dec 2019.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 291 OF 2007 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 30 Dec 2019.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 13 Nov 2013, building plans 13 Nov 2013.Declared to HARERA, read 29 Oct 2026
The court record of JMD’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2019. HARERA Gurugram, read 3 Nov 2026. Source

  • Amber flag: Licence 291 OF 2007 validity ended

    Named in this project’s application. Valid to 30 Dec 2019. The register links a completion certificate (LC-IX), dated 16 Jan 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
Registration no.
67 OF 2017
Registration date
18 Aug 2017
Registration valid till
31 Dec 2019

Declared by the promoter to HARERA

Land area
4.237 (Acre) (17,146.53 sq m)
FAR
5 proposed of 7 permissible
licence
291 of 2007
Estimated project cost
₹189.87 crore
Cost of land
₹44.00 crore
Layout plan, declared approved (field 5a)
13 Nov 2013
Building plans, declared approved
13 Nov 2013
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type · 528 units · 2,02,202 sq m carpet · total for 528 flats, about 383 m² each
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENCE — declared: already been obtained (31 Dec 2007)
  • II. ENVIORNMENT CLEARANCE — declared: already been obtained (16 Apr 2009)
  • III. BR III — declared: already been obtained (13 Nov 2013)
  • IV. ELECTRICAL SCHEME APPROVAL — declared: already been obtained (20 Jul 2016)
  • V. SERVICE PLAN AND ESTIMATE — declared: already been obtained (23 May 2016)
  • VI. FIRE NOC — declared: already been obtained (18 May 2018)
On file with HARERA · 12 files

On file with HARERA (12)

Plans

Site plan

1 file
Approved Site Plan19 Sept 2018

Layout plan

1 file
Latest Layout Plan19 Sept 2018

Zoning plan

1 file
Zoning Plan19 Sept 2018

Demarcation plan

1 file
Demarcation Plan19 Sept 2018

Building plans

1 file
Approved Building Plans, Full Set19 Sept 2018

Services

Service plans

1 file
Service Plans on the Layout19 Sept 2018

Approvals and clearances

Occupation certificate (OC)

1 file
OC for Block-B uploaded3 Aug 2023

DTCP licence

1 file
Licence Copy with Land Schedule19 Sept 2018

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration19 Sept 2018

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures19 Sept 2018Non-Default Certificate from a CA19 Sept 2018Cash Flow Statement19 Sept 2018

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

291 OF 2007 · Ansal Properties & Infrastructure · GURGAON-MANESAR

Licence valid to 30 Dec 2019

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Sept 2018 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

291 OF 2007

DTCP’s page showed no land schedule for licence 291 OF 2007 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, commercial property
₹2,60,000 per sq yd

Sector 62, collector rates effective 1 Apr 2026, Badshahpur tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan19 Sept 2018

Layout plan

1 file
Latest Layout Plan19 Sept 2018

Building plans

1 file
Approved Building Plans, Full Set19 Sept 2018

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/129 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on JMD

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.