Mindspace

by Imperia Structures · Sector 62, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 62, Gurugram3.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Registered
25 Sep 2017
Registered by
IMPERIA STRUCTURES LIMITEDthe company that filed it, for Imperia Structures
Timeline
  1. 25 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 22 Aug 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2020Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2 m² in all, by use
  • Apartment buildings1 m² · 41%
  • Parks and playgrounds0 m² · 22%
  • Roads0 m² · 15%
  • Green belts0 m² · 10%
  • Pavements0 m² · 6%
  • Electricity sub-station0 m² · 3%
  • Parking0 m² · 2%
  • Club house0 m² · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningCentralized, as per standards
  • LiftsSchindler, ISI marked
  • FloorsVitrified tiles & stone
  • WallsSamosam
  • BathroomsISI marked
  • WindowsISI marked
  • Electrical fittingsISI marked
  • Water storageOverhead tanks & under ground tanks

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 62, GurugramSector 62, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)3.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20258.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Mindspace registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 240 OF 2017, registered on 25 Sep 2017. Ended 31 Dec 2020. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Mindspace?From the records · Map pin and road lines, read 6 Sep 2026

Mindspace is in Sector 62, Gurugram; the site address declared to HARERA is Sector-62, Gurugram. In a straight line it is about 3.8 km from Sohna Elevated Corridor (NH-248A), 6.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Mindspace?From the records · HARERA, read 4 Nov 2026

Mindspace is a Imperia Structures project, registered by its company IMPERIA STRUCTURES LIMITED.

The source ↗Imperia Structures's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Mindspace: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 240 OF 2017: Registration expired. Ended 31 Dec 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 86 OF 2010 is on the DTCP register, valid to 29 May 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 22 Aug 2019, building plans 22 Aug 2019.Declared to HARERA, read 29 Oct 2026
The court record of Imperia Structures’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2020. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 36 HARERA files, with the dates we read them
Registration no.
240 OF 2017
Registration date
25 Sept 2017
Registration valid till
31 Dec 2020

Declared by the promoter to HARERA

Land area
2.104 (Sqr/mtrs)
FAR
2.5 proposed of 2.5 permissible
licence
86 of 2010 dated 23.10.2010
Estimated project cost
₹90.07 crore
Cost of land
₹15.00 crore
Layout plan, declared approved (field 5a)
22 Aug 2019
Building plans, declared approved
22 Aug 2019
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. BUILDING PLAN — declared: already been obtained (22 Aug 2019)
  • II. AIRPORT AUTHORITY OF INDIA — declared: already been obtained (29 Apr 2017)
  • III. POLLUTION CONTROL BOARD — declared: already been obtained (20 Feb 2016)
  • IV. ZONING PLAN — declared: already been obtained (16 Mar 2012)
  • V. ENVIRONMENT CLEARANCE — declared: already been obtained (26 Jun 2013)
  • VI. FOREST CLEARANCE — declared: already been obtained (9 Oct 2012)
  • VII. BUILDING PLAN — declared: already been obtained (4 Dec 2015)
  • VIII. NOC FOR TREATED WASTE — declared: already been obtained (11 Jul 2016)
  • IX. WATER ASSURANCE — declared: already been obtained (23 Aug 2016)
  • X. POWER ASSURANCE — declared: already been obtained (27 Jun 2016)
  • XI. SERVICE PLAN ESTIMATE — declared: already been obtained (4 Aug 2016)
On file with HARERA · 36 files

On file with HARERA (36)

Plans

Site plan

2 files
Folder E- Site Plan2 Dec 2019Approved Site Plan26 Nov 2019

Layout plan

2 files
Folder E- Layout Plan2 Dec 2019Latest Layout Plan30 Nov 2019

Zoning plan

2 files
Folder E- Zoning Plan2 Dec 2019Zoning Plan26 Nov 2019

Demarcation plan

2 files
Folder E- Demarcation Plan2 Dec 2019Demarcation Plan29 Nov 2019

Building plans

7 files
Folder E- Detail Covered Area Achieved FAR2 Dec 2019Folder E- Elevation Section2 Dec 2019Folder E- Ground Floor Plan Alongwith Building Plan Approval2 Dec 2019

Floor plans

6 files
Folder E- Floor Plan- 9TH+10TH+12TH+13TH2 Dec 2019Folder E- Floor Plan- Lower and Upper Basement2 Dec 2019Folder E- Floor Plan- 1st to 4th2 Dec 2019

Services

Sewerage and drainage

2 files
Folder E- Storm Water Drainage Plan2 Dec 2019Folder E- Sewerage & Garbage Disposal Plan2 Dec 2019

Water supply

1 file
Folder E- Water Supply Plan2 Dec 2019

Electricity

1 file
Folder E- Street Light Plan2 Dec 2019

Service plans

1 file
Service Plans on the Layout28 Nov 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certicate uploaded28 Nov 2024

DTCP licence

1 file
Licence Copy with Land Schedule26 Nov 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration26 Nov 2019

Sales papers

Allotment and sale agreements

2 files
Folder F-Draft BBA2 Dec 2019Folder F-Draft Allotment Letter2 Dec 2019

Money

Accounts and finance

3 files
Folder D Balance Sheet of Last Three Year2 Dec 2019Cash Flow Statement30 Nov 2019Non-Default Certificate from a CA30 Nov 2019

Timeline and progress

Progress and photographs

1 file
Quarterly Engineers Certificate30 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit30 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

86 OF 2010 · DLF New Gurgaon Homes Developers · GURGAON-MANESAR

Licence valid to 29 May 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

86 OF 2010: 11 parcels, 8.3562 acres in all, in Madabass (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 8.36 acres.

  • 6//12/26 kanal 19 marla
  • 6//138 kanal
  • 6//146 kanal 10 marla
  • 6//174 kanal 12 marla
Show the other 7 parcels
  • 6//188 kanal
  • 6//19/17 kanal 10 marla
  • 6//228 kanal
  • 6//238 kanal
  • 6//74 kanal 3 marla
  • 6//81 kanal 16 marla
  • 24//3 min3 kanal 7 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Madabass (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 6//12/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,60,000 per sq yd

Sector 62, collector rates effective 1 Apr 2026, Badshahpur tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Folder E- Site Plan2 Dec 2019Approved Site Plan26 Nov 2019

Layout plan

2 files
Folder E- Layout Plan2 Dec 2019Latest Layout Plan30 Nov 2019

Building plans

7 files
Folder E- Detail Covered Area Achieved FAR2 Dec 2019Folder E- Elevation Section2 Dec 2019Folder E- Ground Floor Plan Alongwith Building Plan Approval2 Dec 2019Folder E- Details of Permissible FAR2 Dec 2019Folder E- Floor Plan- Terrace2 Dec 2019Approved Building Plans, Full Set30 Nov 2019Approved Building Plans, Full Set30 Nov 2019

Floor plans

6 files
Folder E- Floor Plan- 9TH+10TH+12TH+13TH2 Dec 2019Folder E- Floor Plan- Lower and Upper Basement2 Dec 2019Folder E- Floor Plan- 1st to 4th2 Dec 2019Folder E- Floor Plan- 5th & 6th2 Dec 2019Folder E- Floor Plan- 7TH+8TH+11TH2 Dec 2019Folder E- Floor Plan- Basement + Ground2 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (36 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/954 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Imperia Structures

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.