Skip to content

Presidia [Tower C, D, E and Shops]

by Pioneer Urban Land & Infrastructure · Sector 62, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 62, Gurugram3.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Registered
18 Aug 2017
Registered by
PIONEER URBAN LAND AND INFRASTRUCTURE LTDthe company that filed it, for Pioneer Urban Land & Infrastructure
Timeline
  1. 9 Feb 2011Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 18 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Dec 2019Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.4 acres in all, by use
  • Parks and playgrounds2.08 acres · 47%
  • Roads0.89 acres · 20%
  • Pavements0.75 acres · 17%
  • Apartment buildings0.49 acres · 11%
  • Other uses0.19 acres · 4%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSamsung VRV
  • KitchenStone SLAB
  • LiftsThyssenkrup
  • FloorsMarble
  • WallsTextured paint
  • BathroomsPremium CP fittings + santaryware wall tiles, floor tiles
  • WindowsGlass
  • Main doorVeneered

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 62, GurugramSector 62, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)3.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20258.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Presidia [Tower C, D, E and Shops] registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 69 OF 2017, registered on 18 Aug 2017. Ended 30 Dec 2019. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Presidia [Tower C, D, E and Shops]?From the records · Map pin and road lines, read 6 Sep 2026

Presidia [Tower C, D, E and Shops] is in Sector 62, Gurugram; the site address declared to HARERA is Group Housing Colony, Sector-62, Gurugram Haryana. In a straight line it is about 3.8 km from Sohna Elevated Corridor (NH-248A), 6.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Presidia [Tower C, D, E and Shops]?From the records · HARERA, read 4 Nov 2026

Presidia [Tower C, D, E and Shops] is a Pioneer Urban Land & Infrastructure project, registered by its company PIONEER URBAN LAND AND INFRASTRUCTURE LTD.

The source ↗Pioneer Urban Land & Infrastructure's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Presidia [Tower C, D, E and Shops]: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 69 OF 2017: Registration expired. Ended 30 Dec 2019.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 268 OF 2007 is on the DTCP register: Licence ends soon; the register prints its validity to 2 Dec 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 9 Feb 2011, building plans 9 Feb 2011.Declared to HARERA, read 29 Oct 2026
The court record of Pioneer Urban Land & Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Dec 2019. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 268 OF 2007 ends soon

    Named in this project’s application. Valid to 2 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 40 HARERA files, with the dates we read them
Registration no.
69 OF 2017
Registration date
18 Aug 2017
Registration valid till
30 Dec 2019

Declared by the promoter to HARERA

Land area
4.40 (Acre) (17,806.17 sq m)
FAR
the application prints 175, which is not a ratio
licence
268 of 2007
Estimated project cost
₹183.52 crore
Cost of land
₹13.71 crore
Layout plan, declared approved (field 5a)
9 Feb 2011
Building plans, declared approved
9 Feb 2011
Declared inventory · 7 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+SQ · 30 units · 5,501.67 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 5BR+FL+OFF+SQ · 10 units · 3,345.22 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+ST+SQ · 38 units · 6,180.79 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 5BR+FL+OFF+SQ · 2 units · 557.23 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+SQ · 48 units · 6,921.59 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4BR+FL+OFF+SQ · 2 units · 576.92 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 5BR+FL+OFF+SQ · 2 units · 647.9 sq m carpet
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. STATUTORY APPROVALS — declared: already been obtained
  • II. LICENSE — declared: already been obtained (3 Dec 2007)
  • III. ZONING PLAN — declared: already been obtained (25 Jun 2015)
  • IV. APPROVAL OF BUILDING PLAN — declared: already been obtained (9 Feb 2011)
  • V. WATER CONNECTION — declared: already been obtained (23 Jan 2018)
  • VI. FIRE FIGHTING SCHEME — declared: already been obtained (13 Dec 2013)
  • VII. ENVIRONMENTAL CLEARANCE — declared: already been obtained (4 Jun 2008)
  • VIII. NOC FOR POLLUTION — declared: already been obtained (21 Aug 2019)
  • IX. HEIGHT CLEARANCE BY AAI — declared: already been obtained (15 Oct 2012)
  • X. NOC FROM FOREST — declared: already been obtained (19 Aug 2011)
  • XI. RAIN WATER HARVESTING — declared: already been obtained (1 Jan 2016)
  • XII. SEWER CONNECTION — declared: already been obtained (16 Jan 2018)
On file with HARERA · 40 files

On file with HARERA (40)

Plans

Site plan

2 files
Site Plan14 Feb 2020Approved Site Plan4 Dec 2019

Layout plan

1 file
Latest Layout Plan4 Dec 2019

Zoning plan

1 file
Zoning Plan4 Dec 2019

Demarcation plan

1 file
Demarcation Plan14 Feb 2020

Building plans

6 files
BP 314 Feb 2020BP 214 Feb 2020BR III14 Feb 2020

Services

Service plans

4 files
Service Estimate Presidia 114 Feb 2020Service Plan Presidia14 Feb 2020Service Plan Letter14 Feb 2020Service Plans on the Layout4 Dec 2019

Approvals and clearances

Occupation certificate (OC)

6 files
OC for Tower-A, EWS Basement-1, basement-2, Basement under EWS Tower uploaded3 Aug 2023OC Presidia Tower-E14 Feb 2020OC Presidia Tower A & EWS14 Feb 2020

DTCP licence

3 files
LC-IV14 Feb 2020LOI14 Feb 2020Licence Copy with Land Schedule28 Nov 2019

Environment clearance

2 files
EC Order - Pioneer14 Feb 2020Eia GH Sector14 Feb 2020

Fire safety

1 file
NOC Fire Presidia14 Feb 2020

Other NOCs and clearances

2 files
Forest NOC14 Feb 2020AAI NOC14 Feb 2020

Sales papers

Allotment and sale agreements

2 files
Sample Allotment Letter5 Dec 2019Draft Agreement5 Dec 2019

Money

Accounts and finance

6 files
CA Certificate on the Application’s Figures14 Feb 2020Cash Flow Statement31 Dec 2019Copy of Balance Sheet of Last Three Year5 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit4 Dec 2019

Other filings

Other filings

2 files
Tir Presidia-Pioneer14 Feb 2020BR for RERA Account14 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

268 OF 2007 · Pioneer Urban Land & Infrastructure · GURGAON-MANESAR

Licence valid to 2 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 31 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

268 OF 2007

DTCP’s page showed no land schedule for licence 268 OF 2007 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, residential flat
₹9,900 per sq ft

Sector 62, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan14 Feb 2020Approved Site Plan4 Dec 2019

Layout plan

1 file
Latest Layout Plan4 Dec 2019

Building plans

6 files
BP 314 Feb 2020BP 214 Feb 2020BR III14 Feb 2020BP 114 Feb 2020Presidia Revalidation BR III14 Feb 2020Approved Building Plans, Full Set4 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (40 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1022 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pioneer Urban Land & Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.