Emerald Nuevo
by Emaar MGF Land · Sector 62, Gurugram
Not on our price list yet
Possession 31 Dec 2022 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 62, Gurugram3.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Registered by
- EMAAR MGF LAND LTD.the company that filed it, for Emaar MGF Land
- 17 Dec 2019Building plans approveddeclared to HARERA, read 29 Oct 2026
- 27 Jan 2020Registered with HARERAHARERA, read 4 Nov 2026
- 31 Dec 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings1.344 acres · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningVRF system with HI-wall units
- KitchenCement plaster finish / OBD/ white-WASH/acrylic emulsion paint / ceramic tile / vitrified tile
- Kitchen appliancesModular kitchen with chimney, hob
- LiftsSS finish inside lift CAR
- FloorsBARE RCC SLAB / KOTA stone/ granite/ ceramic tile / vitrified tiles / imported marble/laminates/reflective paint
- WallsCement plaster finish / OBD/ white-WASH/acrylic emulsion paint / ceramic tile / vitrified tile
- BathroomsHigh quality sanitary WARE and CP fittings
- WindowsUPVC/ aluminium painted /MS painted door-window with glass
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)3.8 km
- Delhi–Gurugram–SNB RRTS6.3 km
- Dwarka ExpresswayOpen, 17 Aug 20258.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 19
- Registered, no OC or CC yet: 1
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Emaar MGF Land | Same sector | — | — | 31 Aug 2022 | |
Krrish WorldNo photo on file yet | Krrish Buildtech | Same sector | — | — | — |
No photo of the project on file yet | Pioneer Urban Land & Infrastructure | Same sector | — | — | — |
| Emaar MGF Land | Same sector | — | — | 31 Mar 2024 | |
ROYAL GREEN HEIGHTSNo photo on file yet | Synergyshine Infra Llp In Collaboration With Gulmohar Finance | Same sector | — | — | 28 Jul 2026 |
| Emaar India | Same sector | — | — | 30 Sep 2029 | |
| Conscient Infrastructure | Same sector | Under construction | ₹20,000/sq ft | 1 Oct 2030 | |
| Emaar India | Same sector | Under construction | ₹18,000/sq ft | 30 Aug 2030 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Emerald Nuevo registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/387/119/2020/03, registered on 27 Jan 2020. The register’s record shows an end date of 31 Dec 2022. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for Emerald Nuevo?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2022. Its registration runs to 31 Dec 2022; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Emerald Nuevo?From the records · Map pin and road lines, read 6 Sep 2026
Emerald Nuevo is in Sector 62, Gurugram; the site address declared to HARERA is Sector 65 & 62 Badshahpur Nangli Maidawas. In a straight line it is about 3.8 km from Sohna Elevated Corridor (NH-248A), 6.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Emerald Nuevo?From the records · HARERA, read 4 Nov 2026
Emerald Nuevo is a Emaar MGF Land project, registered by its company EMAAR MGF LAND LTD..
The source ↗Emaar MGF Land's projects and court recordThe records
What the registers hold for Emerald Nuevo: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/387/119/2020/03: Registration lapsed. The register’s record shows an end date of 31 Dec 2022.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 10 OF 2009 is on the DTCP register, valid to 20 May 2030.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 17 Dec 2019.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration lapsed
The register’s record shows an end date of 31 Dec 2022. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 20 HARERA files, with the dates we read them
- Registration no.
- GGM/387/119/2020/03
- Registration date
- 27 Jan 2020
- Registration valid till
- 31 Dec 2022
- Declared possession
- 31 Dec 2022
Declared by the promoter to HARERA
- Land area
- 1.344 (Acre) (5,438.98 sq m)
- FAR
- the application prints 240, which is not a ratio
- licence
- Lic No. 10 of 2009 dt. 21.05.2009 (102.7412 Acres) and Lic. No. 113 fo 2011 dt. 22.12.2011 (92.50 Acres)
- Estimated project cost
- ₹93.11 crore
- Cost of land
- ₹1.78 crore
- Building plans, declared approved
- 17 Dec 2019
- Construction to start
- 31 Jan 2020
- Completion declared for
- 31 Dec 2022
Declared inventory · 72 types
Declared inventory — 72 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 1 unit · 161.846 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 1 unit · 160.621 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 1 unit · 160.176 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 1 unit · 136.129 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 1 unit · 161.53 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 1 unit · 160.41 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 1 unit · 159.96 sq m carpet · one flat
- Apartment/Shops/Other Buildings · 1 unit · 135.92 sq m carpet · one flat
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. ELECTRICITY LOAD — declared: already been obtained (26 Oct 2017)
- II. ARAVALI NOC — declared: already been obtained (10 Jul 2014)
- III. LICENSE APPROVAL — declared: already been obtained (20 May 2019)
- IV. ENVIRONMENT CLEARANCE — declared: already been obtained (5 Jan 2015)
- V. SERVICE PLAN ESTIMATES — declared: already been obtained (12 Dec 2017)
- VI. FOREST NOC — declared: already been obtained (2 Apr 2014)
On file with HARERA · 20 files
On file with HARERA (20)
Plans
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileServices
Sewerage and drainage
2 filesWater supply
2 filesElectricity
2 filesRoads
1 fileApprovals and clearances
DTCP licence
4 filesEnvironment clearance
1 fileLand records
Land records
1 fileMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
10 OF 2009 · Emaar MGF Land Ltd · GURGAON-MANESAR
Licence valid to 20 May 2030
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
10 OF 2009
DTCP’s page showed no land schedule for licence 10 OF 2009 when Bhumiq read it on 18 Oct 2026. verify at source
- Collector rate, residential flat
- ₹9,900 per sq ft
Sector 62, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (20 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1064 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Emaar MGF Land
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.