Skip to content

M3M 114 MARKET

by Golden Gate Propbuild · Sector 114, Gurugram

Not on our price list yet

Possession 31 Aug 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 114, Gurugram1.8 km from Dwarka Expressway, in a straight line
Registered by
GOLDEN GATE PROPBUILD PRIVATE LIMITEDthe company that filed it, for Golden Gate Propbuild

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3.825 acres in all, by use
  • Roads2.367 acres · 62%
  • Plots for sale1.339 acres · 35%
  • Other usesas the form names them: Underground water tank, Electrical sub station0.119 acres · 3%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 114, GurugramSector 114, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)9.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is M3M 114 MARKET registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/585/317/2022/60. Ended 31 Aug 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for M3M 114 MARKET?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Aug 2024. Its registration runs to 31 Aug 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M 114 MARKET?From the records · Map pin and road lines, read 6 Sep 2026

M3M 114 MARKET is in Sector 114, Gurugram; the site address declared to HARERA is Sector -114, Gurugram Manesar Urban Complex, Haryana. In a straight line it is about 1.8 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 9.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building M3M 114 MARKET?From the records · HARERA, read 4 Nov 2026

M3M 114 MARKET is a Golden Gate Propbuild project, registered by its company GOLDEN GATE PROPBUILD PRIVATE LIMITED.

The source ↗Golden Gate Propbuild's projects and court record

The records

What the registers hold for M3M 114 MARKET: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/585/317/2022/60: Registration expired. Ended 31 Aug 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 63 OF 2022 is on the DTCP register, valid to 23 May 2027.DTCP, read 3 Nov 2026
The court record of Golden Gate Propbuild’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Aug 2024. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 41 HARERA files, with the dates we read them
Registration no.
GGM/585/317/2022/60
Registration valid till
31 Aug 2024
Declared possession
31 Aug 2024

Declared by the promoter to HARERA

Land area
3.825 (Acre) (15,479.23 sq m)
FAR
1.5 proposed
licence
63 of 2022 dated 24.05.2022
Estimated project cost
₹51.25 crore
Cost of land
₹17.45 crore
Construction to start
31 May 2022
Completion declared for
31 Aug 2024
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LOI — declared: already been obtained (15 Feb 2022)
  • II. FOREST NOC — declared: already been obtained (8 Mar 2022)
  • III. ARAVALI NOC — declared: already been obtained (8 Apr 2022)
  • IV. LICENCE — declared: already been obtained (24 May 2022)
On file with HARERA · 41 files

On file with HARERA (41)

Plans

Site plan

2 files
Site Plan Plot Orientation1 Jul 2022Approved Site Plan3 Jun 2022

Layout plan

2 files
Superimposed Demarcation on Approved Layout Plan1 Jul 2022Latest Layout Plan3 Jun 2022

Demarcation plan

1 file
Demarcation Plan3 Jun 2022

Building plans

2 files
Approval of Standard Design of SCO1 Jul 2022Approval of Standard Design of SCO23 Jun 2022

Floor plans

13 files
Block-3 Floor Plan and Area Details (16 & 25)1 Jul 2022Bock-1 Floor Plan and Area Details (01 & 11)1 Jul 2022Block-1 Floor Plan and Area Details (2-10)1 Jul 2022

Services

Sewerage and drainage

2 files
Service Plan Sewer (Applied)3 Jun 2022Service Plan Storm Water (Applied)3 Jun 2022

Water supply

1 file
Service Plan Water (Applied)3 Jun 2022

Electricity

1 file
Street Light Plan1 Jul 2022

Roads

1 file
Service Plan Road (Applied)3 Jun 2022

Landscape and green areas

1 file
M3M 114 Market Schematic Landscape Plan1 Jul 2022

Service plans

2 files
Solid Waste Management (Utility Block)1 Jul 2022Service Estimate (Applied)3 Jun 2022

Approvals and clearances

Completion certificate (CC)

1 file
CC uploaded20 Nov 2024

DTCP licence

2 files
Licence Copy with Land Schedule25 May 2022LOI4 Apr 2022

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration23 Jun 2022NEC4 Apr 2022

Money

Accounts and finance

5 files
Certificate for Financial Inventory23 Jun 2022Demand Drafts3 Jun 2022Cash Flow Statement3 Jun 2022

Timeline and progress

Construction schedule

1 file
PERT Chart for SCO23 Jun 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Jun 2022

Other filings

Other filings

1 file
Utility Detail1 Jul 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

63 OF 2022 · Bajgheda Enterprises · GURGAON-MANESAR

Licence valid to 23 May 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Jun 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

63 OF 2022: 17 parcels, 3.825 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 3.825 acres.

  • 3//25/217 marla
  • 3//25/34 kanal 1 marla
  • 4//21/12 kanal 4 marla
  • 4//21/2/19 marla
Show the other 13 parcels
  • 6//1/11 kanal 13 marla
  • 6//1/2/19 marla
  • 6//1/411 marla
  • 6//1/43 kanal
  • 6//10/1/12 kanal 16 marla
  • 6//10/1/26 marla
  • 6//2/114 marla
  • 6//9/2/1/12 marla
  • 6//9/2/1/210 marla
  • 7//5/15 kanal 2 marla
  • 7//5/2/24 kanal 3 marla
  • 7//6/13 kanal 2 marla
  • 7//7/1/1/113 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 3//25/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan Plot Orientation1 Jul 2022Approved Site Plan3 Jun 2022

Layout plan

2 files
Superimposed Demarcation on Approved Layout Plan1 Jul 2022Latest Layout Plan3 Jun 2022

Building plans

2 files
Approval of Standard Design of SCO1 Jul 2022Approval of Standard Design of SCO23 Jun 2022

Floor plans

13 files
Block-3 Floor Plan and Area Details (16 & 25)1 Jul 2022Bock-1 Floor Plan and Area Details (01 & 11)1 Jul 2022Block-1 Floor Plan and Area Details (2-10)1 Jul 2022Block-2 Floor Plan and Area Details (12)1 Jul 2022Block-2 Floor Plan and Area Details (12B & 14)1 Jul 2022Block-2 Floor Plan and Area Details (15)1 Jul 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (41 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1903 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Golden Gate Propbuild

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.