Skip to content
Under construction

Smartworld One DXP

by Smartworld Developers · Sector 113, Gurugram

₹17,000 a sq ftof carpet area

Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 31 Dec 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 113, Gurugram0.6 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
about 1,178 sq ft
In m²about 109.4 m², the average flat, as declared
Asking rate
₹17,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
NOURISH DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Smartworld Developers
Timeline
  1. 1 Dec 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7.94 acres in all, by use
  • Roads3.329 acres · 42%
  • Apartment buildings2.013 acres · 25%
  • Parks and playgrounds1.653 acres · 21%
  • Other uses0.929 acres · 12%
  • Electricity sub-station0.016 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningMitsubishi/daiken/as approved
  • KitchenAs per approved
  • LiftsSchindler/thyssenkrupp/KONE/as approved as per vertical traffic
  • FloorsVitrified tiles/laminated wooden floor/ceramic tile
  • WallsLevel plaster / white putty
  • BathroomsAs per approved
  • WindowsAluminium frame
  • Main doorWooden frame with flush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 113, GurugramSector 113, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)9.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Smartworld One DXP registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/645/377/2022/120. Valid to 31 Dec 2027.

The source ↗
What is the possession timeline for Smartworld One DXP?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2027. Its registration runs to 31 Dec 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Smartworld One DXP?From the records · Map pin and road lines, read 6 Sep 2026

Smartworld One DXP is in Sector 113, Gurugram; the site address declared to HARERA is Sec-113. In a straight line it is about 0.6 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 9.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What does a home in Smartworld One DXP cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026

The Bhumiq team's price list has ₹17,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Smartworld One DXP: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/645/377/2022/120: Registered. Valid to 31 Dec 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 106 OF 2022 is on the DTCP register, valid to 4 Aug 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 1 Dec 2022, building plans 1 Dec 2022.Declared to HARERA, read 29 Oct 2026
The court record of Smartworld Developers’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 73 HARERA files, with the dates we read them
Registration no.
GGM/645/377/2022/120
Registration valid till
31 Dec 2027
Declared possession
31 Dec 2027
Asking price (indicative)
₹17,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
7.94 (Acre) (32,132.04 sq m)
FAR
3.41 proposed of 3.62 permissible
licence
106 of 2022 dated 5-Aug-22 valid upto 4-Aug-27
Estimated project cost
₹1350.17 crore
Cost of land
₹288.68 crore
Layout plan, declared approved (field 5a)
1 Dec 2022
Building plans, declared approved
1 Dec 2022
Construction to start
1 Jan 2023
Completion declared for
31 Dec 2027
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 900 units · 98,472.66 sq m carpet · 8 towers · total for 900 flats, about 109.4 m² each
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE — declared: already been obtained (24 Dec 2019)
  • II. FOREST NOC — declared: already been obtained (7 Aug 2018)
  • III. ARAVALLI NOC — declared: already been obtained (27 Aug 2018)
  • IV. ASSURANCE CONSTRUCTION WATER — declared: already been obtained (9 Aug 2022)
  • V. ASSURANCE OF TREATED WATER — declared: already been obtained (9 Aug 2022)
  • VI. CONSTRUCTION WATER NOC — declared: already been obtained (11 Nov 2022)
  • VII. DRINKING WATER ASSURANCE — declared: already been obtained (10 Aug 2022)
  • VIII. SEWERAGE ASSURANCE — declared: already been obtained (9 Aug 2022)
  • IX. STORM WATER ASSURANCE — declared: already been obtained (9 Aug 2022)
On file with HARERA · 73 files

On file with HARERA (73)

Plans

Site plan

2 files
Road Layout on Approved Site Plan10 Dec 2022Approved Site Plan2 Dec 2022

Layout plan

3 files
Tower C,D,E,&F Terrace Roof Layout10 Dec 2022Latest Layout Plan2 Dec 2022Superimposed Demarcation on Approved Layout Plan2 Dec 2022

Zoning plan

1 file
Zoning Plan2 Dec 2022

Demarcation plan

1 file
Demarcation Plan10 Dec 2022

Building plans

11 files
Tower G&H Terrace Floor Plan10 Dec 2022Approved Building Plans, Full Set2 Dec 2022Tower-A,b,g,h Elevation Plan-22 Dec 2022

Floor plans

31 files
Tower C,D,E,&F Gf Plans & Area Diagram10 Dec 2022Tower-A,b,g,h 19th Floor Plan10 Dec 2022Tower-C,d,e,f 27th & 26th Floor Plan10 Dec 2022

Services

Sewerage and drainage

2 files
Storm Water Layout2 Dec 2022Sewer Layout2 Dec 2022

Water supply

1 file
Water Supply Layout2 Dec 2022

Electricity

2 files
Electricity Supply Plan10 Dec 2022Street Light Layout Plan10 Dec 2022

Landscape and green areas

1 file
Landscape Plan1 Dec 2022

Service plans

1 file
Service Plans on the Layout2 Dec 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule1 Dec 2022

Fire safety

11 files
Tower A,B,G&H 2nd Floor; Fire Fighting & Alarm System Layout10 Dec 2022Tower C,D,E&F Terrace Floor; Fire Fighting & Alarm System Layout10 Dec 2022Tower A,B,G&H (3RD-5TH,7TH,9TH,11TH-18th & 20th-25TH) Floor; Fire Fighting & Alarm System Layout10 Dec 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration1 Dec 2022

Money

Accounts and finance

3 files
Cash Flow Statement10 Dec 2022CA Certificate on the Application’s Figures1 Dec 2022Non-Default Certificate from a CA1 Dec 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit10 Dec 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

106 OF 2022 · Nourish Developers Private Limited · GURGAON-MANESAR

Licence valid to 4 Aug 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

106 OF 2022: 32 parcels, 16.1062 acres in all, in Choma (hadbast 62), tehsil Gurgaon.

The licence register prints the same licensed area, 16.1125 acres.

  • 1//14/14 kanal 3 marla
  • 1//14/22 kanal 15 marla
  • 1//14/3/11 kanal 8 marla
  • 1//14/3/21 kanal 1 marla
Show the other 28 parcels
  • 1//158 kanal
  • 1//168 kanal
  • 1//17/14 kanal 8 marla
  • 1//17/21 kanal 12 marla
  • 1//17/32 kanal
  • 1//186 kanal
  • 1//22/12 kanal 1 marla
  • 1//22/210 marla
  • 1//23/1/12 kanal 9 marla
  • 1//23/1/22 kanal 13 marla
  • 1//23/22 kanal 18 marla
  • 1//248 kanal
  • 1//258 kanal
  • 1//57 kanal 14 marla
  • 1//68 kanal
  • 1//74 kanal 14 marla
  • 2//10/1/2/2/114 marla
  • 2//10/1/2/2/21 kanal 8 marla
  • 2//224 kanal 10 marla
  • 6//16 kanal 11 marla
  • 6//10/21 kanal 18 marla
  • 6//2/11 kanal 2 marla
  • 7//3/17 marla
  • 7//3/2/14 kanal 1 marla
  • 7//3/2/23 kanal 11 marla
  • 7//47 kanal 11 marla
  • 7//57 kanal 11 marla
  • 7//6/13 kanal 7 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Choma (hadbast 62), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 1//14/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,700 per sq ft

Sector 113, collector rates effective 1 Apr 2026, Gurugram tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Road Layout on Approved Site Plan10 Dec 2022Approved Site Plan2 Dec 2022

Layout plan

3 files
Tower C,D,E,&F Terrace Roof Layout10 Dec 2022Latest Layout Plan2 Dec 2022Superimposed Demarcation on Approved Layout Plan2 Dec 2022

Building plans

11 files
Tower G&H Terrace Floor Plan10 Dec 2022Approved Building Plans, Full Set2 Dec 2022Tower-A,b,g,h Elevation Plan-22 Dec 2022Tower-C,d,e,f Elevation Plan2 Dec 2022Tower-C,d,e,f Elevation Plan-22 Dec 2022Tower-A,b,g,h Elevation Plan-12 Dec 2022

Floor plans

31 files
Tower C,D,E,&F Gf Plans & Area Diagram10 Dec 2022Tower-A,b,g,h 19th Floor Plan10 Dec 2022Tower-C,d,e,f 27th & 26th Floor Plan10 Dec 2022Tower-C,d Ground Floor Plan10 Dec 2022Tower G&H Typical Floor Plans (17TH,18TH,20TH-25TH)10 Dec 2022Tower-C,d,e,f 28nd Floor Plan10 Dec 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (73 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2222 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Smartworld Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

₹17,000/sq ftBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.