M3M CAPITAL PHASE -2

by Union Buildmart · Sector 113, Gurugram

Not on our price list yet

Possession 31 Dec 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 113, Gurugram0.6 km from Dwarka Expressway, in a straight line
Home types
2.5, 3.5 and 4.5 BHK
Carpet area
about 724 sq ft
In m²about 67.3 m², the average flat, as declared
Registered by
UNION BUILDMART PRIVATE LIMITEDthe company that filed it, for Union Buildmart
Timeline
  1. 8 Jul 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 12 Sep 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7.71 acres in all, by use
  • Roads3.44 acres · 45%
  • Other usesas the form names them: Area under commercial units2.98 acres · 39%
  • Parks and playgrounds0.47 acres · 6%
  • Apartment buildings0.42 acres · 5%
  • Electricity sub-station0.4 acres · 5%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningChilled water AC system for office & provision forwater cooled DX system upto TAP OFF inside SHOP
  • LiftsStandard make elevators
  • FloorsRetail (typical floor)- RCC BASE SLAB office (lobby)finished GRND floor lobby & RCC BASE SLAB for typiclfloor lobbies. office (unit floor finish) RCC BASE SLAB
  • WallsRAW wall/ partitions
  • BathroomsRetail- finished common toilets with modern fitting &fixtures; office : provision of services WILL beprovided and to be finished by allottee(S).
  • WindowsAluminium glazing with glass of 5-12 MM thick glass
  • Main doorAluminium / glass doors
  • Electrical fittingsCommon areas & toilets to be provided with LED lightfixtures.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 113, GurugramSector 113, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)9.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is M3M CAPITAL PHASE -2 registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/612/344/2022/87. Valid to 31 Dec 2026.

The source ↗
What is the possession timeline for M3M CAPITAL PHASE -2?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2026. Its registration runs to 31 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M CAPITAL PHASE -2?From the records · Map pin and road lines, read 6 Sep 2026

M3M CAPITAL PHASE -2 is in Sector 113, Gurugram; the site address declared to HARERA is Sector -113, Gurugram Manesar Urban Complex, Gurugram, Haryana.. In a straight line it is about 0.6 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 9.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building M3M CAPITAL PHASE -2?From the records · HARERA, read 3 Nov 2026

M3M CAPITAL PHASE -2 is a Union Buildmart project, registered by its company UNION BUILDMART PRIVATE LIMITED.

The source ↗Union Buildmart's projects and court record

The records

What the registers hold for M3M CAPITAL PHASE -2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/612/344/2022/87: Registered. Valid to 31 Dec 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 106 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 15 Dec 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 8 Jul 2022, building plans 12 Sep 2022.Declared to HARERA, read 29 Oct 2026
The court record of Union Buildmart’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 31 Dec 2026. HARERA Gurugram, read 3 Nov 2026. Source

  • Amber flag: Licence 106 OF 2021 ends soon

    Named in this project’s application. Valid to 15 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 89 HARERA files, with the dates we read them
Registration no.
GGM/612/344/2022/87
Registration valid till
31 Dec 2026
Declared possession
31 Dec 2026

Declared by the promoter to HARERA

Land area
7.7139 (Acre) (31,217.05 sq m)
FAR
2.41 proposed of 3.81 permissible
licence
106 of 2021 dated16.12.2021
Estimated project cost
₹1448.97 crore
Cost of land
₹440.59 crore
Layout plan, declared approved (field 5a)
8 Jul 2022
Building plans, declared approved
12 Sept 2022
Construction to start
1 Oct 2022
Completion declared for
31 Dec 2026
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 1,760 units · 1,18,441.19 sq m carpet · 7 towers · total for 1,760 flats, about 67.3 m² each
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. ZONING — declared: already been obtained (15 Apr 2022)
  • II. FOREST NOC — declared: already been obtained (7 Aug 2018)
  • III. ARAVALI NOC — declared: already been obtained (4 Jan 2017)
  • IV. HEIGHT NOC — declared: already been obtained (24 Jan 2022)
  • V. BUILDING PLAN — declared: already been obtained (12 Sept 2022)
  • VI. ENVIRONMENT CLEARANCE — declared: already been obtained (16 Jul 2021)
  • VII. LICENCE — declared: already been obtained (16 Dec 2021)
  • VIII. ENVIRONMENT CLEARANCE - EXPANSION APPLICATION — declared: applied for but yet to receive (4 Apr 2022)
On file with HARERA · 89 files

On file with HARERA (89)

Plans

Site plan

2 files
Superimposed Demarcation on Site Plan14 Sept 2022Approved Site Plan7 Sept 2022

Layout plan

6 files
Tower 4(A&B) 5th Level Layout30 Sept 2022Tower 4(A&B) Typical Layout30 Sept 2022Tower (4 A& B) 6th Level Layout30 Sept 2022

Zoning plan

1 file
Zoning Plan13 Sept 2022

Demarcation plan

1 file
Demarcation Plan14 Sept 2022

Building plans

18 files
Tower 5A (Terrace)30 Sept 2022Tower 4(A&B) Terrace30 Sept 2022Tower 5B (Terrace Level)30 Sept 2022

Floor plans

34 files
Tower 5A (20TH & 30TH)30 Sept 2022Tower 5C (3RD to 5th Level)30 Sept 2022Tower 5A (Stilt Level)30 Sept 2022

Services

Sewerage and drainage

2 files
Sewer Plan14 Sept 2022Drainge Plan14 Sept 2022

Water supply

1 file
Water Layout28 Sept 2022

Electricity

1 file
Electricity & Street Light Plan28 Sept 2022

Roads

1 file
Road Plan14 Sept 2022

Landscape and green areas

1 file
Landscape Plan28 Sept 2022

Service plans

1 file
Solid Waste Management Plan28 Sept 2022

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate26 Aug 2026

DTCP licence

2 files
Licence Copy with Land Schedule7 Sept 2022LOI7 Sept 2022

Environment clearance

1 file
Environment Clearance14 Sept 2022

Fire safety

8 files
Upper Basement Plan Fire Layout Plan30 Sept 2022Site Plan with Fire Fighting Layout30 Sept 2022Commercial 1st Floor Plans Fire Layout Plan30 Sept 2022

Land records

Land records

4 files
Super-Imposed Khasra on Layout28 Sept 2022Entry of License in Revenue Records14 Sept 2022Revenue Record Entry of Licence and Collaboration13 Sept 2022Non- Encumbrance Certificate7 Sept 2022

Money

Accounts and finance

3 files
Non-Default Certificate from a CA28 Sept 2022Demand Drafts14 Sept 2022Project Report14 Sept 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit1 Oct 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

106 OF 2021 · Union Buildmart Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 15 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Sept 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

106 OF 2021

DTCP’s page showed no land schedule for licence 106 OF 2021 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Superimposed Demarcation on Site Plan14 Sept 2022Approved Site Plan7 Sept 2022

Layout plan

6 files
Tower 4(A&B) 5th Level Layout30 Sept 2022Tower 4(A&B) Typical Layout30 Sept 2022Tower (4 A& B) 6th Level Layout30 Sept 2022Tower 4(A&B) 1st Level Layout30 Sept 2022Tower 4(A&B) 2-4th Level Layout30 Sept 2022Latest Layout Plan7 Sept 2022

Building plans

18 files
Tower 5A (Terrace)30 Sept 2022Tower 4(A&B) Terrace30 Sept 2022Tower 5B (Terrace Level)30 Sept 2022Tower 5B (Terrace)30 Sept 2022Tower 5C (Terrace)30 Sept 2022Tower 5C Terrace Mumty & Oh Tank28 Sept 2022

Floor plans

34 files
Tower 5A (20TH & 30TH)30 Sept 2022Tower 5C (3RD to 5th Level)30 Sept 2022Tower 5A (Stilt Level)30 Sept 2022Tower 5A (1ST Level)30 Sept 2022Tower 4(A&B) Refuge Level30 Sept 2022Tower 4(A&B) Stilt Level30 Sept 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (89 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2108 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Union Buildmart

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.