Skip to content

M3M CAPITAL PHASE-3

by Union Buildmart · Sector 113, Gurugram

Not on our price list yet

Possession 31 Mar 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 113, Gurugram0.6 km from Dwarka Expressway, in a straight line
Home types
2.5, 3.5 and 4.5 BHK
Carpet area
about 1,393 sq ft
In m²about 129.4 m², the average flat, as declared
Registered by
UNION BUILDMART PRIVATE LIMITEDthe company that filed it, for Union Buildmart
Timeline
  1. 19 Feb 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 29 Feb 2028Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside0.919 acres in all, by use
  • Apartment buildings0.919 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningChilled water AC system for office & provision forwater cooled DX system upto TAP OFF inside SHOP
  • LiftsStandard make elevators
  • FloorsRetail (typical floor)- RCC BASE SLAB office (lobby)finished GRND floor lobby & RCC BASE SLAB for typiclfloor lobbies. office (unit floor finish) RCC BASE SLAB
  • WallsRAW wall/ partitions
  • BathroomsRetail- finished common toilets with modern fitting &fixtures; office : provision of services WILL beprovided and to be finished by allottee(S).
  • WindowsAluminium glazing with glass of 5-12 MM thick glass
  • Main doorAluminium / glass doors
  • Electrical fittingsCommon areas & toilets to be provided with LED lightfixtures.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 113, GurugramSector 113, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)9.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is M3M CAPITAL PHASE-3 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/825/557/2024/52. Valid to 29 Feb 2028.

The source ↗
What is the possession timeline for M3M CAPITAL PHASE-3?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2027. Its registration runs to 29 Feb 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M CAPITAL PHASE-3?From the records · Map pin and road lines, read 6 Sep 2026

M3M CAPITAL PHASE-3 is in Sector 113, Gurugram; the site address declared to HARERA is Sector-113, Village Chauma, Gurugram, Haryana. In a straight line it is about 0.6 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 9.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building M3M CAPITAL PHASE-3?From the records · HARERA, read 4 Nov 2026

M3M CAPITAL PHASE-3 is a Union Buildmart project, registered by its company UNION BUILDMART PRIVATE LIMITED.

The source ↗Union Buildmart's projects and court record

The records

What the registers hold for M3M CAPITAL PHASE-3: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/825/557/2024/52: Registered. Valid to 29 Feb 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 106 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 15 Dec 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 19 Feb 2024, building plans 19 Feb 2024.Declared to HARERA, read 29 Oct 2026
The court record of Union Buildmart’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 106 OF 2021 ends soon

    Named in this project’s application. Valid to 15 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 60 HARERA files, with the dates we read them
Registration no.
GGM/825/557/2024/52
Registration valid till
29 Feb 2028
Declared possession
31 Mar 2027

Declared by the promoter to HARERA

Land area
0.91875 (Acre) (3,718.05 sq m)
FAR
0.71 proposed of 4.46 permissible
licence
106 OF 2021 DATED 16.12.2021 214 OF 2023 DATED 20.10.2023
Estimated project cost
₹519.28 crore
Cost of land
₹140.83 crore
Layout plan, declared approved (field 5a)
19 Feb 2024
Building plans, declared approved
19 Feb 2024
Construction to start
1 Mar 2024
Completion declared for
31 Mar 2027
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 268 units · 34,690.46 sq m carpet · 2 towers · total for 268 flats, about 129.4 m² each
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (16 Dec 2021)
  • II. LICENSE APPROVAL — declared: already been obtained (20 Dec 2023)
  • III. ASSURANCE- SEWERAGE — declared: already been obtained (4 Mar 2024)
  • IV. ASSURANCE- STORM WATER — declared: already been obtained (28 Feb 2024)
  • V. ASSURANCE- DRINKING WATER — declared: already been obtained (29 Feb 2024)
  • VI. CONSTRUCTION WATER NOC — declared: already been obtained (4 Mar 2024)
  • VII. BR-III — declared: already been obtained (19 Feb 2024)
  • VIII. AAI NOC — declared: already been obtained (13 Dec 2023)
  • IX. ASSURANCE- ELECTRICAL LOAD — declared: already been obtained (17 Nov 2021)
  • X. FOREST NOC — declared: already been obtained (30 Sept 2016)
On file with HARERA · 60 files

On file with HARERA (60)

Plans

Site plan

1 file
Approved Site Plan22 Mar 2024

Layout plan

9 files
T-6B- 2nd to 5th Level Layout & Area Details24 May 2024T-6B- 1st Level Layout & Area Details24 May 2024T-6C- Typical Level Layout & Area Details24 May 2024

Zoning plan

1 file
Zoning Plan22 Mar 2024

Demarcation plan

1 file
Demarcation Plan22 Mar 2024

Building plans

14 files
BR-III11 Jun 2024T-6B- Sections Bb24 May 2024T-6C- Elevations 3 & 424 May 2024

Floor plans

8 files
T-6B- 20th & 30th Floor Plan & Area Details24 May 2024Lower Basement Area Diagram24 May 2024Tower-6B&C Zp24 May 2024

Services

Sewerage and drainage

5 files
STP Treated Water for Construction11 Jun 2024Storm Water Drainage Assurance11 Jun 2024Sewerage Assurance11 Jun 2024

Water supply

2 files
Drinking Water Assurance11 Jun 2024Water Supply Layout24 May 2024

Electricity

1 file
Electricity Layout24 May 2024

Roads

1 file
Road Layout24 May 2024

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate26 Aug 2026

DTCP licence

3 files
LOI11 Jun 2024Licence Copy with Land Schedule11 Jun 2024LC-IV & IV-A11 Jun 2024

Environment clearance

1 file
Environment Clearance11 Jun 2024

Other NOCs and clearances

1 file
AAI NOC11 Jun 2024

Land records

Land records

4 files
Shajra11 Jun 2024Mutations11 Jun 2024Jamabandi11 Jun 2024Revenue Record Entry of Licence and Collaboration22 Mar 2024

Money

Accounts and finance

6 files
CA Certificate Inventory11 Jun 2024CA Certificate- Net Worth11 Jun 2024Non-Default Certificate from a CA11 Jun 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Jun 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

106 OF 2021 · Union Buildmart Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 15 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

214 OF 2023 · Union Buildmart Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 19 Oct 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Mar 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

106 OF 2021

DTCP’s page showed no land schedule for licence 106 OF 2021 when Bhumiq read it on 18 Oct 2026. verify at source

214 OF 2023: 1 parcel, 0.0313 acres in all, in Choma (hadbast 62), tehsil Gurgaon.

The licence register prints the same licensed area, 0.0313 acres.

  • 10//15 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Choma (hadbast 62), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 10//1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan22 Mar 2024

Layout plan

9 files
T-6B- 2nd to 5th Level Layout & Area Details24 May 2024T-6B- 1st Level Layout & Area Details24 May 2024T-6C- Typical Level Layout & Area Details24 May 2024T-6C- 1st Level Layout & Area Details24 May 2024T-6C- 2nd to 5th Level Layout & Area Details24 May 2024T-6C- Terrace, Mumty Layout & Area Details24 May 2024

Building plans

14 files
BR-III11 Jun 2024T-6B- Sections Bb24 May 2024T-6C- Elevations 3 & 424 May 2024T-6B- Elevations 3 & 424 May 2024Commercial- Elevation Plan24 May 2024Structural Plan-124 May 2024

Floor plans

8 files
T-6B- 20th & 30th Floor Plan & Area Details24 May 2024Lower Basement Area Diagram24 May 2024Tower-6B&C Zp24 May 2024Parking Plan-124 May 2024T-6C- 20th & 30th Floor Plan & Area Details24 May 2024Parking Plan-224 May 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (60 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2861 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Union Buildmart

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.