EMAAR DIGI HOMES
by Emaar MGF Land · Sector 62, Gurugram
Not on our price list yet
Possession 31 Mar 2024 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 62, Gurugram3.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Registered by
- EMAAR MGF LAND LIMITEDthe company that filed it, for Emaar MGF Land
- 24 May 2019Registered with HARERAHARERA, read 4 Nov 2026
- 31 Mar 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft803 sq ft246
- 1,000–1,500 sq ft1,297–1,308 sq ft123
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 157 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parks and playgrounds7,682 m² · 34%
- Pavements5,111 m² · 22%
- Roads3,407 m² · 15%
- Apartment buildings2,451 m² · 11%
- Club house1,116 m² · 5%
- Green belts1,065 m² · 5%
- School809 m² · 4%
- Other usesas the form names them: Shops657 m² · 3%
- Parking525 m² · 2%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningSplit a.C. (2BHK) / V.R.F. (3BHK)
- KitchenAcrylic emulsion + vitrified / ceramic tiles
- Kitchen appliancesModular kitchen (+ chimney + hob)
- LiftsS.S. finish inside lift CAR
- FloorsImported marble / vitrified tile / laminated wooden flooring
- WallsAcrylic emulsion + vitrified / ceramic tiles
- BathroomsHigh quality sanitary fittings
- WindowsUPVC door-window
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)3.8 km
- Delhi–Gurugram–SNB RRTS6.3 km
- Dwarka ExpresswayOpen, 17 Aug 20258.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 19
- Registered, no OC or CC yet: 1
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Emaar MGF Land | Same sector | — | — | 31 Dec 2022 | |
| Emaar MGF Land | Same sector | — | — | 31 Aug 2022 | |
Krrish WorldNo photo on file yet | Krrish Buildtech | Same sector | — | — | — |
No photo of the project on file yet | Pioneer Urban Land & Infrastructure | Same sector | — | — | — |
ROYAL GREEN HEIGHTSNo photo on file yet | Synergyshine Infra Llp In Collaboration With Gulmohar Finance | Same sector | — | — | 28 Jul 2026 |
| Emaar India | Same sector | — | — | 30 Sep 2029 | |
| Conscient Infrastructure | Same sector | Under construction | ₹20,000/sq ft | 1 Oct 2030 | |
| Emaar India | Same sector | Under construction | ₹18,000/sq ft | 30 Aug 2030 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is EMAAR DIGI HOMES registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/337/69/2019/31, registered on 24 May 2019. Ended 31 Mar 2024. The register shows it as: Registration expired.
The source ↗What is the possession timeline for EMAAR DIGI HOMES?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Mar 2024. Its registration runs to 31 Mar 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around EMAAR DIGI HOMES?From the records · Map pin and road lines, read 6 Sep 2026
EMAAR DIGI HOMES is in Sector 62, Gurugram; the site address declared to HARERA is Sector 62, Gurugram. In a straight line it is about 3.8 km from Sohna Elevated Corridor (NH-248A), 6.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building EMAAR DIGI HOMES?From the records · HARERA, read 4 Nov 2026
EMAAR DIGI HOMES is a Emaar MGF Land project, registered by its company EMAAR MGF LAND LIMITED.
The source ↗Emaar MGF Land's projects and court recordThe records
What the registers hold for EMAAR DIGI HOMES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/337/69/2019/31: Registration expired. Ended 31 Mar 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 265 OF 2007 is on the DTCP register: Licence lapsed; the register prints its validity to 1 Dec 2024.DTCP, read 3 Nov 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 15 HARERA files, with the dates we read them
- Registration no.
- GGM/337/69/2019/31
- Registration date
- 24 May 2019
- Registration valid till
- 31 Mar 2024
- Declared possession
- 31 Mar 2024
Declared by the promoter to HARERA
- Land area
- 22824.29 (Sqr/mtrs)
- FAR
- the application prints 87.39, which is not a ratio
- licence
- 265 of 2007
- Estimated project cost
- ₹416.75 crore
- Cost of land
- ₹8.43 crore
- Construction to start
- 1 Jul 2019
- Completion declared for
- 31 Mar 2024
Declared inventory · 7 types
Declared inventory
- Apartment/Shops/Other Buildings · 61 units · 121.516 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 123 units · 74.563 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 123 units · 74.563 sq m carpet · 3 towers · one flat
- Apartment/Shops/Other Buildings · 62 units · 120.488 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 135 units · 16.408 sq m carpet · 4 towers · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 19 units · 9.02 sq m carpet · 5 towers · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 3 units · 5.604 sq m carpet · 5 towers · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 3
Statutory approvals, as declared
- I. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (20 Jan 2015)
- II. ENVIRONMENT CLEARANCE — declared: already been obtained (31 Jul 2017)
- III. BUILDING PLAN — declared: already been obtained (25 Feb 2019)
On file with HARERA · 15 files
On file with HARERA (15)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
2 filesServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
265 OF 2007 · Emaar MGF Land Ltd. · GURGAON-MANESAR
Licence valid to 1 Dec 2024
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 13 Feb 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
265 OF 2007
DTCP’s page showed no land schedule for licence 265 OF 2007 when Bhumiq read it on 18 Oct 2026. verify at source
- Collector rate, residential flat
- ₹9,900 per sq ft
Sector 62, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (15 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/413 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Emaar MGF Land
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.
![Presidia [Tower C, D, E and Shops]: no photo yet, the developer's logo](/developer-logos/pioneer-urban-land-infrastructure.png)