Skip to content

Monsoon Breeze Ph-II

by Umang Realtech · Sector 78, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 78, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered
16 Jan 2018
Registered by
UMANG REALTECH PRIVATE LIMITEDthe company that filed it, for Umang Realtech
Timeline
  1. 16 Jan 2018Registered with HARERAHARERA, read 4 Nov 2026
  2. 31 Dec 2020Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7.342 acres in all, by use
  • Plots for sale7.342 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningNot providing
  • KitchenGranite counter, ceramic tiles upto 2 FT above counter and REST OBD
  • Kitchen appliancesSEMI modular kitchen below counter only
  • LiftsPassenger & service lifts in each tower
  • WardrobesNot providing
  • FloorsVitrified tiles
  • WallsOil bound distemper
  • BathroomsCP fitting & china WARE

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 78, GurugramSector 78, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.2 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Monsoon Breeze Ph-II registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 14 OF 2018, registered on 16 Jan 2018. The register’s record shows an end date of 31 Dec 2020. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Monsoon Breeze Ph-II?From the records · Map pin and road lines, read 6 Sep 2026

Monsoon Breeze Ph-II is in Sector 78, Gurugram; the site address declared to HARERA is Sec-78. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 4.2 km from Dwarka Expressway and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Monsoon Breeze Ph-II?From the records · HARERA, read 4 Nov 2026

Monsoon Breeze Ph-II is a Umang Realtech project, registered by its company UMANG REALTECH PRIVATE LIMITED.

The source ↗Umang Realtech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Monsoon Breeze Ph-II: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 14 OF 2018: Registration lapsed. The register’s record shows an end date of 31 Dec 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 77 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 31 Jul 2020.DTCP, read 3 Nov 2026
The court record of Umang Realtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 77 OF 2012 lapsed

    Named in this project’s application. Valid to 31 Jul 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2020. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
Registration no.
14 OF 2018
Registration date
16 Jan 2018
Registration valid till
31 Dec 2020

Declared by the promoter to HARERA

Land area
7.342 (Acre) (29,712.02 sq m)
FAR
0 proposed of 0 permissible
licence
77 of 2012 dated 01.08.2012
Estimated project cost
₹278.49 crore
Cost of land
₹75.82 crore
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type FLATS · 406 units
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. BUILDING PLAN — declared: already been obtained (4 Mar 2013)
  • II. FIRE SCHEME — declared: already been obtained (17 Apr 2014)
  • III. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (27 Dec 2012)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (21 Feb 2014)
On file with HARERA · 16 files

On file with HARERA (16)

Plans

Site plan

1 file
Approved Site Plan29 Mar 2024

Layout plan

1 file
Latest Layout Plan29 Mar 2024

Zoning plan

1 file
Zoning Plan11 Mar 2024

Demarcation plan

1 file
Demarcation Plan29 Mar 2024

Building plans

1 file
Approved Building Plans, Full Set11 Mar 2024

Services

Service plans

1 file
Service Plans on the Layout29 Mar 2024

Approvals and clearances

Occupation certificate (OC)

1 file
OC11 Mar 2024

DTCP licence

1 file
Licence Copy with Land Schedule11 Mar 2024

Environment clearance

1 file
Environmental Clearance11 Mar 2024

Fire safety

1 file
Fire Scheme11 Mar 2024

Other NOCs and clearances

1 file
NOC Height Clearance11 Mar 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration29 Mar 2024

Money

Accounts and finance

3 files
Cash Flow Statement29 Mar 2024Non-Default Certificate from a CA29 Mar 2024CA Certificate on the Application’s Figures29 Mar 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Mar 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

77 OF 2012 · Uppal Housing (P) Ltd. · GURGAON-MANESAR

Licence valid to 31 Jul 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Mar 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

77 OF 2012: 22 parcels, 7.3417 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.

The licence register prints the same licensed area, 7.34 acres.

  • 14//12/2/24 kanal 2 marla
  • 14//13/16 kanal 4 marla
  • 14//13/21 kanal 16 marla
  • 14//14/12 kanal
Show the other 18 parcels
  • 14//14/23 kanal 6 marla
  • 14//16/24 kanal
  • 14//17/15 kanal 6 marla
  • 14//17/22 kanal
  • 14//188 kanal
  • 14//19/1/11 kanal 18 marla
  • 14//23/217 marla
  • 14//24/18 marla
  • 14//24/21 kanal 4 marla
  • 14//251 kanal 14 marla
  • 14//261 kanal 3 marla
  • 15//12/21 kanal 8 marla
  • 15//183 kanal 14 marla
  • 15//19/14 kanal
  • 15//21/11 kanal 9 marla
  • 15//21/25 marla
  • 15//221 kanal 14 marla
  • 15//232 kanal 6 marla 6 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 14//12/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,400 per sq ft

this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan29 Mar 2024

Layout plan

1 file
Latest Layout Plan29 Mar 2024

Building plans

1 file
Approved Building Plans, Full Set11 Mar 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (16 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2843 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Umang Realtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.