Skip to content

Monsoon Breeze Phase-I ABLM Towers

by Umang Realtech · Sector 78, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 78, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered
28 Aug 2017
Registered by
UMANG REALTECH PRIVATE LIMITEDthe company that filed it, for Umang Realtech
Timeline
  1. 9 Dec 2011Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 28 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 5 Mar 2019Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside12.514 acres in all, by use
  • Plots for sale12.514 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningNot providing
  • KitchenGranite counter, ceramic tiles upto 2 FT above counter and REST OBD
  • Kitchen appliancesSEMI modular kitchen below counter only
  • LiftsPassenger & service lifts in each tower
  • WardrobesNot providing
  • FloorsVitrified tiles
  • WallsOil bound distemper
  • BathroomsCP fitting & china WARE

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 78, GurugramSector 78, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.2 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Monsoon Breeze Phase-I ABLM Towers registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 121 OF 2017, registered on 28 Aug 2017. The register’s record shows an end date of 5 Mar 2019. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Monsoon Breeze Phase-I ABLM Towers?From the records · Map pin and road lines, read 6 Sep 2026

Monsoon Breeze Phase-I ABLM Towers is in Sector 78, Gurugram; the site address declared to HARERA is Sector 78, District Gurugram, Haryana. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 4.2 km from Dwarka Expressway and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Monsoon Breeze Phase-I ABLM Towers?From the records · HARERA, read 4 Nov 2026

Monsoon Breeze Phase-I ABLM Towers is a Umang Realtech project, registered by its company UMANG REALTECH PRIVATE LIMITED.

The source ↗Umang Realtech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Monsoon Breeze Phase-I ABLM Towers: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 121 OF 2017: Registration lapsed. The register’s record shows an end date of 5 Mar 2019.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 38 OF 2008 is on the DTCP register: Licence lapsed; the register prints its validity to 1 Mar 2020.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 9 Dec 2011.Declared to HARERA, read 29 Oct 2026
The court record of Umang Realtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 38 OF 2008 lapsed

    Named in this project’s application. Valid to 1 Mar 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 5 Mar 2019. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 17 HARERA files, with the dates we read them
Registration no.
121 OF 2017
Registration date
28 Aug 2017
Registration valid till
5 Mar 2019

Declared by the promoter to HARERA

Land area
12.514 (Acre) (50,642.36 sq m)
FAR
0 proposed of 0 permissible
licence
38 of 2008 Dated 02.03.2008
Estimated project cost
₹90.00 crore
Cost of land
₹29.00 crore
Building plans, declared approved
9 Dec 2011
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type FLAT · 122 units
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. FIRE FIGHTING SCHEME — declared: already been obtained (27 Jul 2009)
  • II. BUILDING PLAN — declared: already been obtained (9 Dec 2011)
  • III. SERVICE PLAN ESTIMATE — declared: already been obtained (17 May 2012)
  • IV. ZONING PLAN — declared: already been obtained (16 Jun 2008)
  • V. ENVIRONMENTAL CLEARANCE FOR CONSTRUCTION — declared: already been obtained (21 Jan 2010)
  • VI. ENVIRONMENTAL CLEARANCE FOR PROPOSED EXPANSION — declared: already been obtained (21 Feb 2014)
On file with HARERA · 17 files

On file with HARERA (17)

Plans

Site plan

1 file
Approved Site Plan29 Mar 2024

Layout plan

1 file
Latest Layout Plan29 Mar 2024

Zoning plan

1 file
Zoning Plan11 Mar 2024

Demarcation plan

1 file
Demarcation Plan29 Mar 2024

Building plans

1 file
Approved Building Plans, Full Set11 Mar 2024

Services

Service plans

1 file
Service Plans on the Layout29 Mar 2024

Approvals and clearances

Occupation certificate (OC)

1 file
OC11 Mar 2024

DTCP licence

1 file
Licence Copy with Land Schedule11 Mar 2024

Environment clearance

1 file
Environmental Clearance11 Mar 2024

Fire safety

1 file
Fire Fighting Scheme11 Mar 2024

Other NOCs and clearances

1 file
NOC Height Clearance11 Mar 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration29 Mar 2024

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures29 Mar 2024Cash Flow Statement29 Mar 2024Non-Default Certificate from a CA29 Mar 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Mar 2024

HARERA’s orders

HARERA’s orders

1 file
Extension No. 04 of 2019 DATED: 02.08.201930 May 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

38 OF 2008 · Uppal Housing · GURGAON-MANESAR

Licence valid to 1 Mar 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Mar 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

38 OF 2008

DTCP’s page showed no land schedule for licence 38 OF 2008 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, residential flat
₹6,400 per sq ft

this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan29 Mar 2024

Layout plan

1 file
Latest Layout Plan29 Mar 2024

Building plans

1 file
Approved Building Plans, Full Set11 Mar 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (17 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2841 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Umang Realtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.