M3M ATRIUM57
by Paryapt Infrastructure · Sector 57, Gurugram
Not on our price list yet
Possession 15 May 2025 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 57, Gurugram4.0 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- PARYAPT INFRASTRUCTURE PRIVATE LIMITEDthe company that filed it, for Paryapt Infrastructure
- 3 Nov 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 15 May 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings1.425 acres · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningProvided in retail and common area NON a/C
- KitchenOf equivalent reputed brand
- Lifts2 no'S passenger & 2 no'S service lifts
- FloorsCement concrete flooring
- WallsGypsum plaster
- WindowsAluminum frame
- Main doorAluminium and glass for retail
- Electrical fittingsLED type fitting
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)4.0 km
- Delhi–Gurugram–SNB RRTS4.9 km
- Dwarka ExpresswayOpen, 17 Aug 20258.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | S & M Developers | 1.5 kmto its sector’s point | — | — | 31 Dec 2026 |
No photo of the project on file yet | S & M Developers | 1.5 kmto its sector’s point | — | — | 31 Dec 2025 |
| Emaar MGF Land | 1.8 kmto its sector’s point | — | — | 31 Dec 2022 | |
| Emaar MGF Land | 1.8 kmto its sector’s point | — | — | 31 Aug 2022 | |
Krrish WorldNo photo on file yet | Krrish Buildtech | 1.8 kmto its sector’s point | — | — | — |
No photo of the project on file yet | Pioneer Urban Land & Infrastructure | 1.8 kmto its sector’s point | — | — | — |
| Emaar MGF Land | 1.8 kmto its sector’s point | — | — | 31 Mar 2024 | |
ROYAL GREEN HEIGHTSNo photo on file yet | Synergyshine Infra Llp In Collaboration With Gulmohar Finance | 1.8 kmto its sector’s point | — | — | 28 Jul 2026 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is M3M ATRIUM57 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/513/245/2021/81. Ended 15 May 2025. The register shows it as: Registration expired.
The source ↗What is the possession timeline for M3M ATRIUM57?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 15 May 2025. Its registration runs to 15 May 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around M3M ATRIUM57?From the records · Map pin and road lines, read 6 Sep 2026
M3M ATRIUM57 is in Sector 57, Gurugram; the site address declared to HARERA is Block-H Sushant Lok Iii Sector 57 Gurugram Haryana. In a straight line it is about 4.0 km from Sohna Elevated Corridor (NH-248A), 4.9 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building M3M ATRIUM57?From the records · HARERA, read 4 Nov 2026
M3M ATRIUM57 is a Paryapt Infrastructure project, registered by its company PARYAPT INFRASTRUCTURE PRIVATE LIMITED.
The source ↗Paryapt Infrastructure's projects and court recordThe records
What the registers hold for M3M ATRIUM57: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/513/245/2021/81: Registration expired. Ended 15 May 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Licence 16 OF 1996, as the developer typed it: no match in the registers searched.Declared to HARERA, read 29 Oct 2026
- Plans approved, as the developer declared: layout plan 3 Nov 2021, building plans 3 Nov 2021.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 15 May 2025. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 42 HARERA files, with the dates we read them
- Registration no.
- GGM/513/245/2021/81
- Registration valid till
- 15 May 2025
- Declared possession
- 15 May 2025
Declared by the promoter to HARERA
- Land area
- 1.425 (Acre) (5,766.77 sq m)
- FAR
- 1.86 proposed of 1.87 permissible
- licence
- License no. 10-16 of 1996
- Estimated project cost
- ₹133.57 crore
- Cost of land
- ₹56.73 crore
- Layout plan, declared approved (field 5a)
- 3 Nov 2021
- Building plans, declared approved
- 3 Nov 2021
- Construction to start
- 15 Nov 2021
- Completion declared for
- 15 May 2025
Declared inventory · 1 type
Declared inventory
- Apartment/Shops/Other Buildings · 274 units · 6,768.04 sq m carpet
Statutory approvals, as declared · 1
Statutory approvals, as declared
- I. BUILDING PLANS — declared: already been obtained (3 Nov 2021)
On file with HARERA · 42 files
On file with HARERA (42)
Plans
Site plan
3 filesLayout plan
2 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
5 filesFloor plans
9 filesServices
Sewerage and drainage
2 filesWater supply
2 filesRoads
2 filesLandscape and green areas
1 fileService plans
2 filesApprovals and clearances
Occupation certificate (OC)
2 filesDTCP licence
1 fileFire safety
5 filesMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared 16 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Nov 2021 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
3 filesLayout plan
2 filesBuilding plans
5 filesFloor plans
9 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (42 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1771 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Paryapt Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.