PARAS ARCADE 114
by Cordial Infrastructure · Sector 114, Gurugram
Not on our price list yet
Possession 31 Jan 2028 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 114, Gurugram1.8 km from Dwarka Expressway, in a straight line
- Registered by
- CORDIAL INFRASTRUCTURE PVT. LTDthe company that filed it, for Cordial Infrastructure
- 22 Feb 2023Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 29 Mar 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Jan 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads5,889 m² · 45%
- Plots for sale4,596 m² · 35%
- Parks and playgrounds1,235 m² · 9%
- Parking838 m² · 6%
- Other uses406 m² · 3%
- Electricity sub-station188 m² · 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20251.8 km
- Delhi–Gurugram–SNB RRTS6.3 km
- Sohna Elevated Corridor (NH-248A)9.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Emaar India | Same sector | — | — | 31 Dec 2024 | |
| Emaar India | Same sector | — | — | 31 Dec 2029 | |
REACH BUZZ 114No photo on file yet | OJOS Developers | Same sector | — | — | 30 Sep 2028 |
M3M XPRESSWAY 114No photo on file yet | Generous Realtors | Same sector | — | — | 30 Apr 2025 |
114 AvenueNo photo on file yet | VSR Infratech | Same sector | — | — | — |
Nimai PlaceNo photo on file yet | YB Builders | Same sector | — | — | — |
| Emaar India | Same sector | — | — | 23 Aug 2027 | |
AARIZE THE TESSORONo photo on file yet | Aarize Realtech | Same sector | — | — | 28 Feb 2029 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is PARAS ARCADE 114 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/708/440/2023/52. Valid to 31 Jan 2028.
The source ↗What is the possession timeline for PARAS ARCADE 114?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Jan 2028. Its registration runs to 31 Jan 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around PARAS ARCADE 114?From the records · Map pin and road lines, read 6 Sep 2026
PARAS ARCADE 114 is in Sector 114, Gurugram; the site address declared to HARERA is Sector - 114, Village Bajghera, Gurugram, Haryana. In a straight line it is about 1.8 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 9.9 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building PARAS ARCADE 114?From the records · HARERA, read 4 Nov 2026
PARAS ARCADE 114 is a Cordial Infrastructure project, registered by its company CORDIAL INFRASTRUCTURE PVT. LTD.
The source ↗Cordial Infrastructure's projects and court recordThe records
What the registers hold for PARAS ARCADE 114: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/708/440/2023/52: Registered. Valid to 31 Jan 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 39 OF 2023 is on the DTCP register, valid to 21 Feb 2028.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 22 Feb 2023, building plans 29 Mar 2023.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 29 HARERA files, with the dates we read them
- Registration no.
- GGM/708/440/2023/52
- Registration valid till
- 31 Jan 2028
- Declared possession
- 31 Jan 2028
Declared by the promoter to HARERA
- Land area
- 3.25 (Acre) (13,152.28 sq m)
- FAR
- 1.5 proposed of 1.5 permissible
- licence
- Licence No. 39 of 2023 dated 22.02.2023 granted by Department of Town and Country Planning
- Estimated project cost
- ₹125.56 crore
- Cost of land
- ₹65.86 crore
- Layout plan, declared approved (field 5a)
- 22 Feb 2023
- Building plans, declared approved
- 29 Mar 2023
- Construction to start
- 1 Mar 2023
- Completion declared for
- 31 Jan 2028
Statutory approvals, as declared · 3
Statutory approvals, as declared
- I. SITE PLAN — declared: already been obtained (22 Feb 2023)
- II. LICENSE — declared: already been obtained (22 Feb 2023)
- III. STANDARD DESIGN — declared: already been obtained (29 Mar 2023)
On file with HARERA · 29 files
On file with HARERA (29)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
7 filesServices
Sewerage and drainage
4 filesWater supply
3 filesElectricity
2 filesRoads
1 fileService plans
1 fileApprovals and clearances
Completion certificate (CC)
1 fileDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
39 OF 2023 · Cordial Infrastructure Pvt. Ltd · GURGAON-MANESAR
Licence valid to 21 Feb 2028
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 1 Mar 2023 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
39 OF 2023: 6 parcels, 3.25 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.
The licence register prints the same licensed area, 3.25 acres.
- 14//15/2/22 kanal 15 marla
- 14//16/16 kanal 1 marla
- 15//11/2/22 kanal 18 marla
- 15//12/2/22 kanal 2 marla
Show the other 2 parcels
- 15//198 kanal 4 marla
- 15//20/14 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 14//15/2/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
7 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (29 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/2376 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Cordial Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.