PARAS ARCADE 114

by Cordial Infrastructure · Sector 114, Gurugram

Not on our price list yet

Possession 31 Jan 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 114, Gurugram1.8 km from Dwarka Expressway, in a straight line
Registered by
CORDIAL INFRASTRUCTURE PVT. LTDthe company that filed it, for Cordial Infrastructure
Timeline
  1. 22 Feb 2023Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 29 Mar 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Jan 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside13,152 m² in all, by use
  • Roads5,889 m² · 45%
  • Plots for sale4,596 m² · 35%
  • Parks and playgrounds1,235 m² · 9%
  • Parking838 m² · 6%
  • Other uses406 m² · 3%
  • Electricity sub-station188 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 114, GurugramSector 114, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)9.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is PARAS ARCADE 114 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/708/440/2023/52. Valid to 31 Jan 2028.

The source ↗
What is the possession timeline for PARAS ARCADE 114?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jan 2028. Its registration runs to 31 Jan 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around PARAS ARCADE 114?From the records · Map pin and road lines, read 6 Sep 2026

PARAS ARCADE 114 is in Sector 114, Gurugram; the site address declared to HARERA is Sector - 114, Village Bajghera, Gurugram, Haryana. In a straight line it is about 1.8 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 9.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building PARAS ARCADE 114?From the records · HARERA, read 4 Nov 2026

PARAS ARCADE 114 is a Cordial Infrastructure project, registered by its company CORDIAL INFRASTRUCTURE PVT. LTD.

The source ↗Cordial Infrastructure's projects and court record

The records

What the registers hold for PARAS ARCADE 114: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/708/440/2023/52: Registered. Valid to 31 Jan 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 39 OF 2023 is on the DTCP register, valid to 21 Feb 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 22 Feb 2023, building plans 29 Mar 2023.Declared to HARERA, read 29 Oct 2026
The court record of Cordial Infrastructure’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 29 HARERA files, with the dates we read them
Registration no.
GGM/708/440/2023/52
Registration valid till
31 Jan 2028
Declared possession
31 Jan 2028

Declared by the promoter to HARERA

Land area
3.25 (Acre) (13,152.28 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
Licence No. 39 of 2023 dated 22.02.2023 granted by Department of Town and Country Planning
Estimated project cost
₹125.56 crore
Cost of land
₹65.86 crore
Layout plan, declared approved (field 5a)
22 Feb 2023
Building plans, declared approved
29 Mar 2023
Construction to start
1 Mar 2023
Completion declared for
31 Jan 2028
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. SITE PLAN — declared: already been obtained (22 Feb 2023)
  • II. LICENSE — declared: already been obtained (22 Feb 2023)
  • III. STANDARD DESIGN — declared: already been obtained (29 Mar 2023)
On file with HARERA · 29 files

On file with HARERA (29)

Plans

Site plan

1 file
Approved Site Plan1 Mar 2023

Layout plan

1 file
Latest Layout Plan1 Mar 2023

Zoning plan

1 file
Zoning Plan1 Mar 2023

Demarcation plan

1 file
Demarcation Plan1 Mar 2023

Building plans

7 files
Standard Design A2-A812 Jul 2023Standard Design B1 & B712 Jul 2023Standard Design A1 & A912 Jul 2023

Services

Sewerage and drainage

4 files
GMDA Assurance- STP12 Jul 2023Sewerage Scheme12 Jul 2023GMDA Assurance- Storm Water12 Jul 2023Storm Water Drainage Scheme12 Jul 2023

Water supply

3 files
GMDA Assurance-Drinking Water12 Jul 2023Flu-Water Supply Scheme12 Jul 2023Dom-Water Supply Scheme12 Jul 2023

Electricity

2 files
External Electrical Layout12 Jul 2023DHBVN Assurance- Electricity12 Jul 2023

Roads

1 file
Road Scheme12 Jul 2023

Service plans

1 file
Service Plans on the Layout1 Mar 2023

Approvals and clearances

Completion certificate (CC)

1 file
Completion Certificate20 Mar 2026

DTCP licence

1 file
Licence Copy with Land Schedule1 Mar 2023

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration12 Jul 2023

Money

Accounts and finance

3 files
Cash Flow Statement12 Jul 2023CA Certificate on the Application’s Figures12 Jul 2023Non-Default Certificate from a CA1 Mar 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit1 Mar 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

39 OF 2023 · Cordial Infrastructure Pvt. Ltd · GURGAON-MANESAR

Licence valid to 21 Feb 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 1 Mar 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

39 OF 2023: 6 parcels, 3.25 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 3.25 acres.

  • 14//15/2/22 kanal 15 marla
  • 14//16/16 kanal 1 marla
  • 15//11/2/22 kanal 18 marla
  • 15//12/2/22 kanal 2 marla
Show the other 2 parcels
  • 15//198 kanal 4 marla
  • 15//20/14 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 14//15/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan1 Mar 2023

Layout plan

1 file
Latest Layout Plan1 Mar 2023

Building plans

7 files
Standard Design A2-A812 Jul 2023Standard Design B1 & B712 Jul 2023Standard Design A1 & A912 Jul 2023Standard Design B2-B612 Jul 2023Standard Design Cde 0112 Jul 2023Standard Design Cde 0212 Jul 2023Standard Design Approval12 Jul 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (29 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2376 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Cordial Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.