Skip to content

Sapphire Ninety

by Crown Propbuild · Sector 90, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 90, Gurugram3.0 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
about 691 sq ft
In m²about 64.2 m², the average flat, as declared
Registered
1 Jan 2018
Registered by
CROWN PROPBUILD PRIVATE LIMITEDthe company that filed it, for Crown Propbuild
Timeline
  1. 10 Mar 2017Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 1 Jan 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Jun 2020Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,542 m² in all, by use
  • Apartment buildings6,216 m² · 40%
  • Pavements5,227 m² · 34%
  • Parking4,100 m² · 26%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningChillers/split-AC wherever as applicable
  • KitchenAs per project wherever as applicable
  • Lifts12 lifts
  • FloorsTiles & stone in common area
  • WallsPaint in common area
  • BathroomsDuravit/grohe/vitra in common area
  • WindowsAluminium wherever as applicable
  • Main doorWooden wherever as applicable

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 90, GurugramSector 90, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20253.0 km
  • Delhi–Gurugram–SNB RRTS3.8 km
  • Sohna Elevated Corridor (NH-248A)10.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Sapphire Ninety registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 05 OF 2018, registered on 1 Jan 2018. Ended 30 Jun 2020. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Sapphire Ninety?From the records · Map pin and road lines, read 6 Sep 2026

Sapphire Ninety is in Sector 90, Gurugram; the site address declared to HARERA is Sector-90,Village-Nawada Fatehpur,. In a straight line it is about 3.0 km from Dwarka Expressway, 3.8 km from Delhi–Gurugram–SNB RRTS and 10.1 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Sapphire Ninety?From the records · HARERA, read 4 Nov 2026

Sapphire Ninety is a Crown Propbuild project, registered by its company CROWN PROPBUILD PRIVATE LIMITED.

The source ↗Crown Propbuild's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Sapphire Ninety: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 05 OF 2018: Registration expired. Ended 30 Jun 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 53 OF 2013 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 27 Jun 2017.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 10 Mar 2017, building plans 10 Mar 2017.Declared to HARERA, read 29 Oct 2026
The court record of Crown Propbuild’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Jun 2020. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 53 OF 2013 validity ended

    Named in this project’s application. Valid to 27 Jun 2017. The register links a completion certificate (LC-IX), dated 20 Sep 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 15 HARERA files, with the dates we read them
Registration no.
05 OF 2018
Registration date
1 Jan 2018
Registration valid till
30 Jun 2020

Declared by the promoter to HARERA

Land area
3.840625 (Acre) (15,542.46 sq m)
FAR
6.72 proposed of 6.72 permissible
licence
License No.53 of 2013 dated 28.06.2013 Renewed on 08.11.2017 Renewed on 10.09.2019
Estimated project cost
₹210.00 crore
Cost of land
₹18.06 crore
Layout plan, declared approved (field 5a)
10 Mar 2017
Building plans, declared approved
10 Mar 2017
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS/RESTAURANTS/MULTIPLEX/BANQUET/HOTEL · 327 units · 21,004.8 sq m carpet · total for 327 flats, about 64.2 m² each
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. AIRPORTS AUTHORITY OF INDIA — declared: already been obtained (2 May 2014)
  • II. ENVIRONMENTAL CLEARANCE — declared: already been obtained (24 Dec 2013)
  • III. FIRE APPROVAL — declared: already been obtained (18 Sept 2019)
  • IV. HARYANA STATE POLLUTION CONTROL — declared: already been obtained (22 Feb 2014)
  • V. FOREST NOC — declared: already been obtained (14 Jun 2013)
  • VI. ARAVALI NOC — declared: already been obtained (10 Jul 2013)
  • VII. SEWAGE NOC — declared: already been obtained (23 Oct 2013)
  • VIII. ELECTRIC NOC — declared: already been obtained (7 Oct 2019)
On file with HARERA · 15 files

On file with HARERA (15)

Plans

Site plan

1 file
Approved Site Plan26 Nov 2019

Layout plan

1 file
Latest Layout Plan27 Nov 2019

Zoning plan

1 file
Zoning Plan26 Nov 2019

Demarcation plan

1 file
Demarcation Plan28 Nov 2019

Building plans

1 file
Approved Building Plans, Full Set26 Nov 2019

Services

Service plans

1 file
Service Plans on the Layout26 Nov 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate17 Jul 2024

Completion certificate (CC)

1 file
Completion Certificate18 Oct 2024

DTCP licence

1 file
Licence Copy with Land Schedule26 Nov 2019

Sales papers

Allotment and sale agreements

1 file
Agreement for Sale26 Nov 2019

Money

Accounts and finance

4 files
Cash Flow Statement28 Nov 2019CA Certificate on the Application’s Figures27 Nov 2019Non-Default Certificate from a CA27 Nov 2019Balance Sheet26 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit26 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

53 OF 2013 · Crown Propbuild Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 27 Jun 2017

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

53 OF 2013: 9 parcels, 3.841 acres in all, in Nawada fatehpur (hadbast 112), tehsil Manesar.

The licence register prints the same licensed area, 3.84 acres.

  • 4//13/13 kanal 11 marla
  • 4//13/2/1/13 kanal 7 marla
  • 4//13/2/2/1/19 marla
  • 4//14/2/1/1/1 min2 kanal 9 marla 5 sarsai
Show the other 5 parcels
  • 4//18/1/1/23 marla
  • 4//18/1/2/17 marla
  • 4//2/24 kanal 8 marla
  • 4//88 kanal
  • 4//98 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Nawada fatehpur (hadbast 112), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 4//13/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,04,750 per sq yd

Sector 90, collector rates effective 1 Apr 2026, Harsaru tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan26 Nov 2019

Layout plan

1 file
Latest Layout Plan27 Nov 2019

Building plans

1 file
Approved Building Plans, Full Set26 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (15 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/933 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Crown Propbuild

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.