THE TRILLION
by Experion Developers · Sector 48, Gurugram
Not on our price list yet
Possession 31 Dec 2032 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 48, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- EXPERION DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Experion Developers
- 14 Jan 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,295 sq ft24
- 1,500–2,000 sq ft1,535–1,906 sq ft516
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads1.597 acres · 29%
- Green belts1.283 acres · 23%
- Apartment buildings0.924 acres · 17%
- Pavements0.705 acres · 13%
- Club house0.541 acres · 10%
- Sewage and waste treatment0.171 acres · 3%
- Other uses0.11 acres · 2%
- Parks and playgrounds0.085 acres · 2%
- Electricity sub-station0.08 acres · 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningHI-wall IDU
- KitchenAnti skid vitrified tiles
- Lifts5 lifts per tower
- FloorsImported marble, laminated wooden flooring, anti skid vitrified tiles, ceramic tile, brick BAT KOBA
- WallsVitrified tile upto false ceiling, vitrified tiles 2' above kitchen counter, REST of walls in acrylic emulsion paint
- BathroomsVitrified tile upto false ceiling as per design
- WindowsAluminium UPVC giazing- performance glass
- Main doorMAIN door to FLAT - hardwood frame with glass panels / veneered flush door
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.3 km
- Delhi–Gurugram–SNB RRTS3.9 km
- Dwarka ExpresswayOpen, 17 Aug 20254.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 11
- Registered, no OC or CC yet: 3
- Other register states: 3
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
THE SAAVIRANo photo on file yet | M-city Infrastructure | Same sector | — | — | 31 Dec 2031 |
Bella Vista-Central Park ResortsNo photo on file yet | Sweta Estates | Same sector | — | — | 31 Aug 2024 |
![]() | Elan Group | 1.1 kmto its sector’s point | New launch | ₹26,500/sq ft | 30 Jun 2033 |
| Godrej Properties | 1.1 kmto its sector’s point | Under construction | ₹20,000/sq ft | 31 Dec 2030 | |
No photo of the project on file yet | Tulip Infratech | 1.6 kmto its sector’s point | — | — | 6 Feb 2019 |
No photo of the project on file yet | Ocean Seven Buildtech | 1.6 kmto its sector’s point | — | — | 13 Feb 2023 |
TRUMP RESIDENCES GURGAONNo photo on file yet | Riverday Infrastructure | 1.6 kmto its sector’s point | — | — | 30 Apr 2033 |
No photo of the project on file yet | Tulip Infratech | 1.6 kmto its sector’s point | — | — | 6 Feb 2019 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is THE TRILLION registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as GGM/911/643/2025/14. Valid to 31 Dec 2032.
The source ↗What is the possession timeline for THE TRILLION?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 31 Dec 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around THE TRILLION?From the records · Map pin and road lines, read 6 Sep 2026
THE TRILLION is in Sector 48, Gurugram; the site address declared to HARERA is Plot No. Gh3, Sector 48, Gurugram. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 3.9 km from Delhi–Gurugram–SNB RRTS and 4.8 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building THE TRILLION?From the records · HARERA, read 3 Nov 2026
THE TRILLION is a Experion Developers project, registered by its company EXPERION DEVELOPERS PRIVATE LIMITED.
The source ↗Experion Developers's projects and court recordThe records
What the registers hold for THE TRILLION: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/911/643/2025/14: Registered. Valid to 31 Dec 2032.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: layout plan 14 Jan 2025, building plans 14 Jan 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 46 HARERA files, with the dates we read them
- Registration no.
- GGM/911/643/2025/14
- Registration valid till
- 31 Dec 2032
- Declared possession
- 31 Dec 2032
Declared by the promoter to HARERA
- Land area
- 5.496 (Acre) (22,241.52 sq m)
- FAR
- 5.1 proposed of 5.12 permissible
- licence
- Plot No. GH3 Alloted by HSVP vide Memo No- ZO002/EO018/UE029/GALOT/0000001455, Dated- 04/01/2024 and conveyance deed Reg. No. 9563 dated 24.10.2024
- Estimated project cost
- ₹1586.10 crore
- Cost of land
- ₹571.99 crore
- Layout plan, declared approved (field 5a)
- 14 Jan 2025
- Building plans, declared approved
- 14 Jan 2025
- Construction to start
- 1 Jan 2026
- Completion declared for
- 31 Dec 2032
Declared inventory · 7 types
Declared inventory
- Apartment/Shops/Other Buildings · 270 units · 177.06 sq m carpet · 3 towers · one flat
- Apartment/Shops/Other Buildings · 246 units · 142.59 sq m carpet · 3 towers · one flat
- Apartment/Shops/Other Buildings · 24 units · 120.32 sq m carpet · 3 towers · one flat
- Apartment/Shops/Other Buildings · 1 unit · 20.27 sq m carpet · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 20.71 sq m carpet · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 19.64 sq m carpet · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 17.93 sq m carpet · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 10
Statutory approvals, as declared
- I. ASSURANCE FOR WATER SUPPLY — declared: already been obtained (29 Mar 2024)
- II. ASSURANCE FOR ELECTRICITY (MEMO NO. 45/DGR-26B) — declared: already been obtained (6 Aug 2024)
- III. ASSURANCE FOR SEWERAGE CONNECTION (MEMO NO. GMDA/SEW/2024/60) — declared: already been obtained (27 Mar 2024)
- IV. ASSURANCE FOR STORM WATER (MEMO NO. GMDA/DRAINAGE/2024/146) — declared: already been obtained (27 Mar 2024)
- V. NOC FOR TREATED WATER (MEMO NO. GMDA/SEW/2024/486) — declared: already been obtained (9 Oct 2024)
- VI. AAI NOC FOR HEIGHT — declared: already been obtained (1 Sept 2023)
- VII. LAND ALLOTMENT BY HSVP E-AUCTION VIDE MEMO NO. ZO002/EO018/UE029/GALOT/0000001455 — declared: already been obtained (4 Jan 2024)
- VIII. BR-III VIDE MEMO NO: CTP/DTP(NN)/SB/14302 — declared: already been obtained (14 Jan 2025)
- IX. CONVEYANACE DEED NO. 9563 DATED 24.10.2024 — declared: already been obtained (24 Oct 2024)
- X. REVISED DEMARCATION CUM ZONING DRAWING NO. D.T.P. (G) 2693/2024 — declared: already been obtained (4 Jun 2024)
On file with HARERA · 46 files
On file with HARERA (46)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileBuilding plans
4 filesFloor plans
2 filesServices
Sewerage and drainage
2 filesWater supply
2 filesElectricity
1 fileService plans
1 fileApprovals and clearances
DTCP licence
2 filesOther NOCs and clearances
4 filesLand records
Land records
5 filesSales papers
Allotment and sale agreements
5 filesMoney
Accounts and finance
6 filesThe promoter’s papers
Declarations and affidavits
4 filesOther filings
Other filings
4 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared Plot No. GH3 Alloted by HSVP vide Memo No- ZO002/EO018/UE029/GALOT/0000001455, Dated- 04/01/2024 and conveyance deed Reg. No. 9563 dated 24.10.2024. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 15 Jan 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
4 filesFloor plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (46 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3155 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Experion Developers
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.


