THE SAAVIRA
by M-city Infrastructure · Sector 48, Gurugram
Not on our price list yet
Possession 31 Dec 2031 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 48, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Carpet area
- about 463 sq ft
In m²
about 43 m², the average flat, as declared - Registered by
- ONE CITY INFRASTRUCTURE PVT. LTD.the company that filed it, for M-city Infrastructure
- 20 Sep 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings1,399 m² · 40%
- Roads1,365 m² · 39%
- Parks and playgrounds722 m² · 21%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningSplit AC'S
- KitchenCeramic tiles above kitchen platform upto approximately 2 FEET and low VOC acrylic emulsion paint in the balance area,ceiling - low VOC acrylic emulsion paint and PART POP
- LiftsHigh speed elevators
- FloorsLiving room / dining family lounge - italian/ imported marble bed room-laminated wooden floor kitchen-tiles bathrooms - tiles balconies / terraces- tiles servant room & toilet-tiles apartment lift lobbies (private).-italian/ imported marble
- WallsWalls - low VOC acrylic emulsion paint , ceramic tiles above kitchen platform upto approximately 2 FEET and low VOC acrylic emulsion paint in the balance area ,vitrified tiles up to false ceiling with granite on the counter ,M S handrail low VOC acrylic emulsion paint
- BathroomsKohler, groha& ROCA or equivalent
- WindowsUPVC framed single glazing
- Main doorFlash door
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.3 km
- Delhi–Gurugram–SNB RRTS3.9 km
- Dwarka ExpresswayOpen, 17 Aug 20254.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Experion Developers | Same sector | — | — | 31 Dec 2032 |
Bella Vista-Central Park ResortsNo photo on file yet | Sweta Estates | Same sector | — | — | 31 Aug 2024 |
![]() | Elan Group | 1.1 kmto its sector’s point | New launch | ₹26,500/sq ft | 30 Jun 2033 |
| Godrej Properties | 1.1 kmto its sector’s point | Under construction | ₹20,000/sq ft | 31 Dec 2030 | |
No photo of the project on file yet | Tulip Infratech | 1.6 kmto its sector’s point | — | — | 6 Feb 2019 |
No photo of the project on file yet | Ocean Seven Buildtech | 1.6 kmto its sector’s point | — | — | 13 Feb 2023 |
TRUMP RESIDENCES GURGAONNo photo on file yet | Riverday Infrastructure | 1.6 kmto its sector’s point | — | — | 30 Apr 2033 |
No photo of the project on file yet | Tulip Infratech | 1.6 kmto its sector’s point | — | — | 6 Feb 2019 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is THE SAAVIRA registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/904/636/2025/07. Valid to 31 Dec 2031.
The source ↗What is the possession timeline for THE SAAVIRA?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2031. Its registration runs to 31 Dec 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around THE SAAVIRA?From the records · Map pin and road lines, read 6 Sep 2026
THE SAAVIRA is in Sector 48, Gurugram; the site address declared to HARERA is Sector- 48, Gurugram, Haryana. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 3.9 km from Delhi–Gurugram–SNB RRTS and 4.8 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building THE SAAVIRA?From the records · HARERA, read 4 Nov 2026
THE SAAVIRA is a M-city Infrastructure project, registered by its company ONE CITY INFRASTRUCTURE PVT. LTD..
The source ↗M-city Infrastructure's projects and court recordThe records
What the registers hold for THE SAAVIRA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/904/636/2025/07: Registered. Valid to 31 Dec 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: building plans 20 Sep 2024.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 17 HARERA files, with the dates we read them
- Registration no.
- GGM/904/636/2025/07
- Registration valid till
- 31 Dec 2031
- Declared possession
- 31 Dec 2031
Declared by the promoter to HARERA
- Land area
- 0.8615 (Acre) (3,486.37 sq m)
- FAR
- 3.62 proposed of 3.62 permissible
- licence
- Plot No. GH-1 vide Memo No. ZO002/EO0118/UE029/GALOT/0000001498 dated 24.01.2024 Allotted by the HSVP.
- Estimated project cost
- ₹155.80 crore
- Cost of land
- ₹61.69 crore
- Building plans, declared approved
- 20 Sept 2024
- Construction to start
- 1 Jan 2025
- Completion declared for
- 31 Dec 2031
Declared inventory · 3 types
Declared inventory
- Apartment/Shops/Other Buildings · 24 units · 1,741.94 sq m carpet · 1 tower · total for 24 flats, about 72.6 m² each
- Apartment/Shops/Other Buildings · 48 units · 1,355.66 sq m carpet · 1 tower · total for 48 flats, about 28.2 m² each
- Apartment/Shops/Other Buildings · 1 unit · 17.325 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. ALLOTMENT LETTER - PLOT NO. GH-1 VIDE MEMO NO. ZO002/EO0118/UE029/GALOT/0000001498, ALLOTTED BY THE HSVP. — declared: already been obtained (24 Jan 2024)
- II. BUILDING PLAN BEARING MEMO NO. CTP/DTP(AM)/SB/255086 — declared: already been obtained (20 Sept 2024)
- III. ZONING PLAN DRAWING NO. D.T.P. (G) 2626 / 2023 — declared: already been obtained (8 May 2023)
- IV. AIRPORT NOC BEARING NO. AAI/RHQ/NR/ATAM/NOC/2024/186/690-93 — declared: already been obtained (19 Mar 2024)
- V. FIRE SCHEME APPROVAL — declared: already been obtained (15 Jun 2024)
- VI. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (25 Jun 2024)
On file with HARERA · 17 files
On file with HARERA (17)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
2 filesServices
Sewerage and drainage
2 filesWater supply
1 fileService plans
1 fileApprovals and clearances
DTCP licence
2 filesOther NOCs and clearances
1 fileLand records
Land records
1 fileSales papers
Allotment and sale agreements
1 fileMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared Plot No. GH-1 vide Memo No. ZO002/EO0118/UE029/GALOT/0000001498 dated 24.01.2024 Allotted by the HSVP.. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Oct 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (17 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3115 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on M-city Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.



