Skip to content

SUNCITY VATSAL VALLEY

by Namdev Construction · Sector 2, Gurugram

Not on our price list yet

Possession 6 May 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 2, Gurugram1.4 km from Dwarka Expressway, in a straight line
Registered by
NAMDEV CONSTRUCTION PVT. LTD.the company that filed it, for Namdev Construction
Timeline
  1. 7 May 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 6 May 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside9.5 acres in all, by use
  • Plots for sale4.409 acres · 46%
  • Roads1.551 acres · 16%
  • Other uses1.526 acres · 16%
  • Land for community services, handed to the government0.951 acres · 10%
  • Parks and playgrounds0.713 acres · 8%
  • Shops and offices0.351 acres · 4%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 2, GurugramSector 2, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.4 km
  • Delhi–Gurugram–SNB RRTS3.0 km
  • Sohna Elevated Corridor (NH-248A)7.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is SUNCITY VATSAL VALLEY registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/484/216/2021/52. Ended 6 May 2026. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for SUNCITY VATSAL VALLEY?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 6 May 2026. Its registration runs to 6 May 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SUNCITY VATSAL VALLEY?From the records · Map pin and road lines, read 6 Sep 2026

SUNCITY VATSAL VALLEY is in Sector 2, Gurugram; the site address declared to HARERA is Gual Pahari, Sector 2, Gurugram. In a straight line it is about 1.4 km from Dwarka Expressway, 3.0 km from Delhi–Gurugram–SNB RRTS and 7.1 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SUNCITY VATSAL VALLEY?From the records · HARERA, read 4 Nov 2026

SUNCITY VATSAL VALLEY is a Namdev Construction project, registered by its company NAMDEV CONSTRUCTION PVT. LTD..

The source ↗Namdev Construction's projects and court record

The records

What the registers hold for SUNCITY VATSAL VALLEY: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/484/216/2021/52: Registration expired. Ended 6 May 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 21 OF 2021 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 4 Jan 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 7 May 2021.Declared to HARERA, read 29 Oct 2026
The court record of Namdev Construction’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 6 May 2026. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 21 OF 2021 validity ended

    Named in this project’s application. Valid to 4 Jan 2024. The register links a completion certificate (LC-IX), dated 1 Sep 2023, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
Registration no.
GGM/484/216/2021/52
Registration valid till
6 May 2026
Declared possession
6 May 2026

Declared by the promoter to HARERA

Land area
9.5 (Acre) (38,445.14 sq m)
FAR
0 proposed of 0 permissible
licence
License No. 21 of 2021 dated 07.05.2021
Estimated project cost
₹220.29 crore
Cost of land
₹84.07 crore
Layout plan, declared approved (field 5a)
7 May 2021
Construction to start
8 May 2021
Completion declared for
6 May 2026
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. NOC FOR CONSTRUCTION OF RAIN WATER HARVESTING PIT — declared: already been obtained (24 Dec 2019)
  • II. ASSURANCE TO SUPPLY STP TREATED WATER FOR CONSTRUCTION — declared: already been obtained (22 Mar 2021)
  • III. LICENSE — declared: already been obtained (7 May 2021)
  • IV. FOREST NOC — declared: already been obtained (1 Oct 2018)
  • V. ARAVALI NOC — declared: already been obtained (28 Oct 2020)
  • VI. NOC WILD LIFE — declared: already been obtained (15 Feb 2021)
  • VII. ASSURANCE OF SUPPLY OF POTABLE WATER NOC — declared: already been obtained (22 Mar 2021)
  • VIII. ASSURANCE OF SEWAGE CONNECTION NOC — declared: already been obtained (15 Mar 2021)
  • IX. ELECTRICAL ASSURANCE — declared: already been obtained (28 Jun 2021)
  • X. ZONING PLAN — declared: already been obtained (9 Jul 2021)
  • XI. SERVICE PLAN ESTIMATES — declared: already been obtained (28 Jul 2021)
On file with HARERA · 21 files

On file with HARERA (21)

Plans

Site plan

1 file
Approved Site Plan9 Jun 2021

Layout plan

1 file
Latest Layout Plan9 Jun 2021

Zoning plan

1 file
Zoning Plan15 Jul 2021

Demarcation plan

1 file
Demarcation Plan16 Jun 2021

Services

Water supply

1 file
Assurance for Supply of Treated Water16 Jun 2021

Electricity

1 file
Electrical Assurnace15 Jul 2021

Service plans

2 files
Service Estimates Plan9 Aug 2021Service Plans on the Layout16 Jun 2021

Approvals and clearances

Completion certificate (CC)

1 file
Completion Certificate14 Nov 2023

DTCP licence

1 file
Licence Copy with Land Schedule9 Jun 2021

Other NOCs and clearances

6 files
Forest NOC16 Jun 2021Wilf Life NOC16 Jun 2021Aravali NOC16 Jun 2021

Land records

Land records

2 files
Non Encumbrance Certificate16 Jun 2021Information to Revenue Dept16 Jun 2021

Money

Accounts and finance

2 files
CA Certificate on the Application’s Figures16 Jun 2021Non-Default Certificate from a CA15 Jun 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Jun 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

21 OF 2021 · Namdev Construction Pvt. Ltd. · GWAL PAHARI

Licence valid to 4 Jan 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 15 Jul 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

21 OF 2021: 16 parcels, 9.5 acres in all, in Gwal pahari (hadbast 77), tehsil Wazirabad.

The licence register prints the same licensed area, 9.5 acres.

  • 7//25/15 kanal 17 marla
  • 7//25/22 kanal 3 marla
  • 7//25/31 kanal 1 marla
  • 14//14/29 marla
Show the other 12 parcels
  • 14//157 kanal 8 marla
  • 14//167 kanal 8 marla
  • 14//178 kanal
  • 14//248 kanal
  • 14//5/25 kanal
  • 14//67 kanal 8 marla
  • 27//14/1/11 marla
  • 27//14/1/32 kanal 7 marla
  • 27//15/13 kanal 13 marla
  • 27//16/1/21 kanal 5 marla
  • 27//48 kanal
  • 27//78 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gwal pahari (hadbast 77), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 7//25/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan9 Jun 2021

Layout plan

1 file
Latest Layout Plan9 Jun 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1636 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Namdev Construction

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.