Timeline
  1. 11 Jan 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Jun 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.587 acres in all, by use
  • Other usesas the form names them: STP (sewage treatment plant), Underground water tank2.062 acres · 45%
  • Parking0.68 acres · 15%
  • Apartment buildings0.532 acres · 12%
  • Parks and playgrounds0.511 acres · 11%
  • Roads0.482 acres · 10%
  • Green belts0.321 acres · 7%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRF system with HI-wall/ductable/cassette type AC unit as/design
  • KitchenBranded CP fittings and fixtures
  • Kitchen appliancesModular kitchen with hob, chimney, oven microwave, dishwasher, refrigerator and washing machine in utility balcony, all of reputed make.
  • LiftsBranded lift
  • WardrobesModular wardrobes of standard make in bedrooms (except in utility)
  • FloorsMarble / tiles / stone
  • WallsAcryllic emulsion paint
  • BathroomsBranded CP fittings and chinaware

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 2, GurugramSector 2, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.4 km
  • Delhi–Gurugram–SNB RRTS3.0 km
  • Sohna Elevated Corridor (NH-248A)7.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is THE BILLIONAIRE RESIDENCES registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/793/525/2024/20. Valid to 30 Jun 2028.

The source ↗
What is the possession timeline for THE BILLIONAIRE RESIDENCES?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2028. Its registration runs to 30 Jun 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE BILLIONAIRE RESIDENCES?From the records · Map pin and road lines, read 6 Sep 2026

THE BILLIONAIRE RESIDENCES is in Sector 2, Gurugram; the site address declared to HARERA is Sector-2,Gwal Pahari, District Gurugram,Haryana. In a straight line it is about 1.4 km from Dwarka Expressway, 3.0 km from Delhi–Gurugram–SNB RRTS and 7.1 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE BILLIONAIRE RESIDENCES?From the records · HARERA, read 4 Nov 2026

THE BILLIONAIRE RESIDENCES is a Kvell Infrastructure project, registered by its company KVELL INFRASTRUCTURE LLP.

The source ↗Kvell Infrastructure's projects and court record

The records

What the registers hold for THE BILLIONAIRE RESIDENCES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/793/525/2024/20: Registered. Valid to 30 Jun 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 75 OF 2022 is on the DTCP register, valid to 14 Jun 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 11 Jan 2024, building plans 11 Jan 2024.Declared to HARERA, read 29 Oct 2026
The court record of Kvell Infrastructure’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 59 HARERA files, with the dates we read them
Registration no.
GGM/793/525/2024/20
Registration valid till
30 Jun 2028
Declared possession
30 Jun 2028

Declared by the promoter to HARERA

Land area
4.5875 (Acre) (18,564.95 sq m)
FAR
1.87 proposed
licence
75 of 2022 dated 15.06.2022 valid up to 14.06.2027 Change of Developer grated vide memo No.23098-107 dated 14.07.2023 in favour of Kvell Infrastructure LLP
Estimated project cost
₹321.02 crore
Cost of land
₹49.10 crore
Layout plan, declared approved (field 5a)
11 Jan 2024
Building plans, declared approved
11 Jan 2024
Construction to start
1 Jan 2024
Completion declared for
30 Jun 2028
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 73 units · 19,237.559 sq m carpet · 2 towers
  • Apartment/Shops/Other Buildings · 13 units · 212.212 sq m carpet
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. LICENCE — declared: already been obtained (15 Jun 2022)
  • II. CHANGE OF DEVELOPER — declared: already been obtained (14 Jul 2023)
  • III. ENVIRONMENT CLEARANCE — declared: already been obtained (13 Nov 2023)
  • IV. HEIGHT NOC — declared: already been obtained (5 Jul 2023)
  • V. FOREST NOC — declared: already been obtained (9 Aug 2023)
  • VI. ARAVALI NOC — declared: already been obtained (13 Sept 2023)
  • VII. ENVIRONMENT CLEARANCE — declared: already been obtained (15 Nov 2023)
  • VIII. CTE — declared: already been obtained (22 Nov 2023)
  • IX. BUILDING PLANS APPROVAL — declared: already been obtained (11 Jan 2024)
On file with HARERA · 59 files

On file with HARERA (59)

Plans

Site plan

3 files
Approved Site Plan8 Feb 2024Green Area Parking Area Site Plan8 Feb 2024Ph Site Plan8 Feb 2024

Layout plan

1 file
Latest Layout Plan8 Feb 2024

Zoning plan

1 file
Zoning Plan23 Nov 2023

Demarcation plan

1 file
Demarcation Plan23 Nov 2023

Building plans

9 files
Approved Building Plans, Full Set8 Feb 2024Section Bb8 Feb 2024Elevation-18 Feb 2024

Floor plans

18 files
41st Floor Plan with Area8 Feb 2024Typical Floor Plan8 Feb 2024Basement 02 Area8 Feb 2024

Services

Sewerage and drainage

2 files
Storm Water Assurance23 Nov 2023Sewerage Assurance23 Nov 2023

Water supply

1 file
Water Assurance23 Nov 2023

Electricity

1 file
Electrical Assurance23 Nov 2023

Service plans

2 files
Service Estimates Application12 Feb 2024Service Plans on the Layout2 Dec 2023

Approvals and clearances

DTCP licence

3 files
LC IV23 Nov 2023Licence Copy with Land Schedule23 Nov 2023Change of Developer23 Nov 2023

Environment clearance

1 file
Environment Clearance26 Nov 2023

Fire safety

2 files
Fire Scheme Application12 Feb 2024Fire S8 Feb 2024

Other NOCs and clearances

6 files
Mining Permission12 Feb 2024CTE26 Nov 2023Aravali NOC23 Nov 2023

Land records

Land records

1 file
NEC23 Nov 2023

Money

Accounts and finance

3 files
Demand Draft12 Feb 2024Non-Default Certificate from a CA11 Feb 2024Cash Flow Statement2 Dec 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Feb 2024

Company papers

1 file
Board Resolution11 Feb 2024

Other filings

Other filings

2 files
BLK2 Shopping EWS Plan8 Feb 2024Mumty Machine Room Plan8 Feb 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

75 OF 2022 · Shalimar Corp Limited · GWAL PAHARI

Licence valid to 14 Jun 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Feb 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

75 OF 2022: 10 parcels, 4.5875 acres in all, in Gwal pahari (hadbast 77), tehsil Wazirabad.

The licence register prints the same licensed area, 4.5875 acres.

  • 35//15/15 kanal 8 marla
  • 35//16/1/21 kanal 11 marla
  • 35//63 kanal 17 marla
  • 35//75 kanal 18 marla
Show the other 6 parcels
  • 35//72 kanal
  • 36//1/13 kanal 3 marla
  • 36//10/24 kanal 16 marla
  • 36//11/23 kanal 13 marla
  • 36//20/16 kanal 8 marla
  • 36//20/1area printed as 0

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gwal pahari (hadbast 77), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 35//15/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Approved Site Plan8 Feb 2024Green Area Parking Area Site Plan8 Feb 2024Ph Site Plan8 Feb 2024

Layout plan

1 file
Latest Layout Plan8 Feb 2024

Building plans

9 files
Approved Building Plans, Full Set8 Feb 2024Section Bb8 Feb 2024Elevation-18 Feb 2024Elevation-28 Feb 2024Elevation-48 Feb 2024Terrace Floor Pla with Area8 Feb 2024

Floor plans

18 files
41st Floor Plan with Area8 Feb 2024Typical Floor Plan8 Feb 2024Basement 02 Area8 Feb 20244th to 6th Floor Plan with Area8 Feb 2024Basement 04 Area8 Feb 2024Basement 03 Plan8 Feb 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (59 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2696 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Kvell Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.