Skip to content

VERIS

by Stanford Developers & Infrastructure · Sector 2, Gurugram

Not on our price list yet

Possession 31 Dec 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 2, Gurugram1.4 km from Dwarka Expressway, in a straight line
Carpet area
3,594 sq ft
In m²about 334–334 m², as declared
Registered by
ADANI INFRASTRUCTURE & DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Stanford Developers & Infrastructure
Timeline
  1. 13 Mar 2025Layout and building plans approveddeclared to HARERA, read 8 Oct 2026
  2. 31 Dec 2029Possession, as declareddeclared to HARERA, read 8 Oct 2026
  3. 31 Mar 2030Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

32homes, 3,594 to 3,594 sq ft of carpet area
  • 3,000 sq ft and above3,594 sq ft32

Carpet area per home, as declared to HARERA (read 8 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.007 acres in all, by use
  • Other usesas the form names them: Electricity supply system2.007 acres · 50%
  • Parks and playgrounds0.644 acres · 16%
  • Pavements0.42 acres · 10%
  • Roads0.416 acres · 10%
  • Club house0.205 acres · 5%
  • Apartment buildings0.14 acres · 3%
  • Green belts0.132 acres · 3%
  • Parking0.02 acres · under 1%
  • Electricity sub-station0.013 acres · under 1%
  • Sewage and waste treatment0.01 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 8 Oct 2026. The share is of the land the table itemises.

In each home
  • Lifts3 lifts provided (inclusive of one stretcher lift)
  • WindowsAL/ UPVC
  • Main doorWooden flush door
  • Gas pipelineProvision

The developer’s specifications in the HARERA application, declared to HARERA, read 8 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 2, GurugramSector 2, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.4 km
  • Delhi–Gurugram–SNB RRTS3.0 km
  • Sohna Elevated Corridor (NH-248A)7.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 2
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is VERIS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/943/675/2025/46. Valid to 31 Mar 2030.

The source ↗
What is the possession timeline for VERIS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2029. Its registration runs to 31 Mar 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around VERIS?From the records · Map pin and road lines, read 6 Sep 2026

VERIS is in Sector 2, Gurugram; the site address declared to HARERA is Village Gwal Pahari, Sector 02, Gurugram. In a straight line it is about 1.4 km from Dwarka Expressway, 3.0 km from Delhi–Gurugram–SNB RRTS and 7.1 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building VERIS?From the records · HARERA, read 4 Nov 2026

VERIS is a Stanford Developers & Infrastructure project, registered by its company ADANI INFRASTRUCTURE & DEVELOPERS PRIVATE LIMITED.

The source ↗Stanford Developers & Infrastructure's projects and court record

The records

What the registers hold for VERIS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/943/675/2025/46: Registered. Valid to 31 Mar 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 98 OF 2011 is on the DTCP register, valid to 10 Nov 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 13 Mar 2025, building plans 13 Mar 2025.Declared to HARERA, read 8 Oct 2026
The court record of Stanford Developers & Infrastructure’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 47 HARERA files, with the dates we read them
Registration no.
GGM/943/675/2025/46
Registration valid till
31 Mar 2030
Declared possession
31 Dec 2029

Declared by the promoter to HARERA

Land area
4.0069 (Acre) (16,215.35 sq m)
FAR
1.87 proposed of 1.87 permissible
licence
98 of 2011
Estimated project cost
₹258.37 crore
Cost of land
₹22.22 crore
Layout plan, declared approved (field 5a)
13 Mar 2025
Building plans, declared approved
13 Mar 2025
Construction to start
1 Jul 2025
Completion declared for
31 Dec 2029
Declared inventory · 3 types

Declared inventory

  • Apartment/Shops/Other Buildings · 32 units · 333.91 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 112.39 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 97.81 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (11 Nov 2011)
  • II. REVISE ZONING PLAN — declared: already been obtained (3 Mar 2025)
  • III. PHASING PLAN APPROVAL — declared: already been obtained (5 Jun 2024)
  • IV. BUILDING PLAN APPROVAL — declared: already been obtained (13 Mar 2025)
  • V. ENVIRONMENTAL CLEARANCE — declared: already been obtained (27 Sept 2024)
On file with HARERA · 47 files

On file with HARERA (47)

Plans

Site plan

2 files
Superimposed Plan24 Apr 2025Approved Site Plan24 Apr 2025

Layout plan

1 file
Latest Layout Plan24 Apr 2025

Zoning plan

2 files
Revised Zoning Letter24 Apr 2025Zoning Plan5 Feb 2025

Demarcation plan

1 file
Demarcation Plan5 Feb 2025

Building plans

4 files
Approved Building Plans, Full Set24 Apr 2025Terrace, Mumty,community Hall M Room Plan24 Apr 2025Section Aa24 Apr 2025Elevation- A&B24 Apr 2025

Floor plans

12 files
Basement -2 Plan Area Details24 Apr 2025Ground Floor Plan24 Apr 2025Basement -1 Plan Area Details24 Apr 2025

Services

Electricity

1 file
Electrical Assurance24 Apr 2025

Landscape and green areas

1 file
Green Area Parking Calculation24 Apr 2025

Service plans

2 files
Service Plans on the Layout24 Apr 2025Service Plan Application24 Apr 2025

Approvals and clearances

DTCP licence

4 files
LOI24 Apr 2025LC-IV24 Apr 2025Change of Developer24 Apr 2025Licence Copy with Land Schedule5 Feb 2025

Environment clearance

1 file
EC24 Apr 2025

Other NOCs and clearances

3 files
AAI NOC24 Apr 2025Approval Forest24 Apr 2025Mining Permision Doc24 Apr 2025

Land records

Land records

5 files
Registered GPA Global Credit24 Apr 2025Registered Collaboration Agreement Global Credit24 Apr 2025Registered Collaboration Agreement Ist24 Apr 2025

Sales papers

Allotment and sale agreements

1 file
Certificate of Inventory24 Apr 2025

Money

Accounts and finance

3 files
Cash Flow Statement24 Apr 2025Non-Default Certificate from a CA24 Apr 2025CA Certificate on the Application’s Figures24 Apr 2025

The promoter’s papers

Declarations and affidavits

2 files
Bank Undertaking24 Apr 2025The Promoter’s Declaration on Affidavit24 Apr 2025

Other filings

Other filings

2 files
Affi. for NOCS Not Req24 Apr 2025Suppelmentary Agreement24 Apr 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

98 OF 2011 · Krrish Realty Nirman · Gwal Pahari

Licence valid to 10 Nov 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 10 Feb 2025 · read 8 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

98 OF 2011: 20 parcels, 12.3688 acres in all, in Gwal pahari (hadbast 77), tehsil Wazirabad.

The licence register prints the same licensed area, 12.36 acres.

  • 15//149 kanal 16 marla
  • 15//158 kanal
  • 15//169 kanal 9 marla
  • 15//17/17 kanal 17 marla
Show the other 16 parcels
  • 15//24/24 kanal
  • 15//25/12 kanal 13 marla
  • 15//67 kanal 9 marla
  • 16//16 kanal
  • 26//10/22 kanal 9 marla
  • 26//116 kanal 2 marla
  • 26//2/22 kanal 11 marla
  • 27//15/25 kanal 6 marla
  • 27//16/1/12 kanal 3 marla
  • 26//10/14 kanal 6 marla
  • 26//92 kanal 10 marla
  • 15//133 kanal 9 marla
  • 15//17/23 marla
  • 15//188 kanal
  • 15//236 kanal 13 marla
  • 15//24/13 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gwal pahari (hadbast 77), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 15//14.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Superimposed Plan24 Apr 2025Approved Site Plan24 Apr 2025

Layout plan

1 file
Latest Layout Plan24 Apr 2025

Building plans

4 files
Approved Building Plans, Full Set24 Apr 2025Terrace, Mumty,community Hall M Room Plan24 Apr 2025Section Aa24 Apr 2025Elevation- A&B24 Apr 2025

Floor plans

12 files
Basement -2 Plan Area Details24 Apr 2025Ground Floor Plan24 Apr 2025Basement -1 Plan Area Details24 Apr 2025Ground Area Calculation24 Apr 2025First Floor Plan24 Apr 2025Second Floor Plan24 Apr 2025

Among the uploads Bhumiq read from HARERA's page on 8 Oct 2026 (47 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3337 · read 8 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Stanford Developers & Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.