TULIP VIOLET (Phase-II)

by Tulip Infratech · Sector 69, Gurugram

Not on our price list yet

Possession 6 Feb 2019 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 69, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Registered
18 Dec 2018
Registered by
TULIP INFRATECH PVT. LTD.the company that filed it, for Tulip Infratech
Timeline
  1. 11 Mar 2015Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
  2. 18 Dec 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 6 Feb 2019Possession, as declareddeclared to HARERA, read 15 Oct 2026
  4. 31 Dec 2020Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenMarble/granite counter with SS sink
  • Lifts2 NOS, capacity10 & 13 person, KONE
  • FloorsLaminated wooden flooring/anti skid tiles/ vitrified tiles or equivalent
  • WallsPaint finishes
  • BathroomsWhite sanitary, CP fitting and mirror
  • WindowsUPVC windows
  • Main doorFlush door
  • Electrical fittingsSwitches only (no lights & fixtures)

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 69, GurugramSector 69, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.8 km
  • Delhi–Gurugram–SNB RRTS4.6 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 4
  • Other register states: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is TULIP VIOLET (Phase-II) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/304/2018/36, registered on 18 Dec 2018. The register’s record shows an end date of 31 Dec 2020. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for TULIP VIOLET (Phase-II)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 6 Feb 2019. Its registration runs to 31 Dec 2020; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around TULIP VIOLET (Phase-II)?From the records · Map pin and road lines, read 6 Sep 2026

TULIP VIOLET (Phase-II) is in Sector 69, Gurugram; the site address declared to HARERA is Sector 69 & 70, Gurugram, Haryana. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 4.6 km from Delhi–Gurugram–SNB RRTS and 4.7 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building TULIP VIOLET (Phase-II)?From the records · HARERA, read 4 Nov 2026

TULIP VIOLET (Phase-II) is a Tulip Infratech project, registered by its company TULIP INFRATECH PVT. LTD..

The source ↗Tulip Infratech's projects and court record

The records

What the registers hold for TULIP VIOLET (Phase-II): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/304/2018/36: Registration lapsed. The register’s record shows an end date of 31 Dec 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 78 OF 2010 is on the DTCP register, valid to 14 Oct 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 11 Mar 2015, building plans 11 Mar 2015.Declared to HARERA, read 15 Oct 2026
The court record of Tulip Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2020. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
Registration no.
GGM/304/2018/36
Registration date
18 Dec 2018
Registration valid till
31 Dec 2020
Declared possession
6 Feb 2019

Declared by the promoter to HARERA

Land area
8.44 (Sqr/mtrs)
FAR
the application prints 169.26, which is not a ratio
licence
78 of 2010 (15.10.2010) DTCP
Estimated project cost
the application prints ₹145 lakh crore, which is not a plausible figure
Layout plan, declared approved (field 5a)
11 Mar 2015
Building plans, declared approved
11 Mar 2015
Completion declared for
6 Feb 2019
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. SITE PLAN LAYOUT — declared: already been obtained (11 Mar 2015)
On file with HARERA · 12 files

On file with HARERA (12)

Plans

Site plan

1 file
Approved Site Plan22 Feb 2020

Layout plan

1 file
Latest Layout Plan22 Feb 2020

Zoning plan

1 file
Zoning Plan22 Feb 2020

Demarcation plan

1 file
Demarcation Plan22 Feb 2020

Building plans

1 file
Approved Building Plans, Full Set22 Feb 2020

Services

Service plans

1 file
Service Plans on the Layout22 Feb 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule22 Feb 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration22 Feb 2020

Money

Accounts and finance

3 files
Cash Flow Statement22 Feb 2020Non-Default Certificate from a CA22 Feb 2020CA Certificate on the Application’s Figures22 Feb 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit22 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

78 OF 2010 · Tulip Infratech Pvt. Ltd · GURGAON-MANESAR

Licence valid to 14 Oct 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Feb 2020 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

78 OF 2010: 38 parcels, 25.4375 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 25.44 acres.

  • rectangle 76, kila 21/2 min19 marla
  • rectangle 76, kila 20 min3 kanal 6 marla
  • rectangle 76, kila 21/1 min3 kanal 14 marla
  • 90//5/12 kanal 10 marla
Show the other 34 parcels
  • 90//158 kanal
  • 90//28 kanal
  • 90//38 kanal
  • 90//47 kanal 16 marla
  • 90//5/24 kanal
  • 90//68 kanal
  • 90//7/21 kanal 12 marla
  • 90//7/317 marla
  • 90//8/1/113 marla
  • 90//8/1/25 kanal 16 marla
  • 90//8/2/13 marla
  • 90//8/2/21 kanal 5 marla
  • 90//98 kanal
  • rectangle 91, kila 1 min5 kanal 4 marla
  • rectangle 91, kila 10 min5 kanal 4 marla
  • 77//10/27 kanal 10 marla
  • 77//11/14 kanal
  • 77//11/2/21 kanal 11 marla
  • 77//128 kanal
  • 77//138 kanal
  • 77//147 kanal 8 marla
  • 77//167 kanal 9 marla
  • 77//178 kanal
  • 77//188 kanal
  • 77//208 kanal
  • 77//236 kanal 18 marla
  • 77//246 kanal 18 marla
  • 77//256 kanal 18 marla
  • 78//14/17 kanal 8 marla
  • 78//261 kanal 13 marla
  • 78//46 kanal 7 marla
  • 78//7/17 kanal 12 marla
  • rectangle 78, kila 6 min4 kanal 19 marla
  • rectangle 90, kila 7/14 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 76, kila 21/2 min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,950 per sq ft

Sector 69, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan22 Feb 2020

Layout plan

1 file
Latest Layout Plan22 Feb 2020

Building plans

1 file
Approved Building Plans, Full Set22 Feb 2020

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (12 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1310 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Tulip Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.