Urban 67-A
by Pyramid Infratech · Sector 67, Gurugram
Not on our price list yet
About this project
Key facts
- Location
- Sector 67, Gurugram0.7 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Registered by
- PYRAMID INFRATECH PRIVATE LIMITEDthe company that filed it, for Pyramid Infratech
- 2 Nov 2017Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
- 17 Nov 2017Registered with HARERAHARERA, read 3 Nov 2026
- 31 Oct 2022Registration valid toHARERA, read 3 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads13,387 m² · 34%
- Green belts10,551 m² · 27%
- Parking8,823 m² · 22%
- Apartment buildings4,919 m² · 12%
- Other usesas the form names them: Anganwari and community centre, Rain water harvesting system, Area under commercial units1,851 m² · 5%
- Electricity sub-station229 m² · under 1%
- Sewage and waste treatment26 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.
- KitchenStone counter with tile
- FloorsI PS flooring
- WallsOBD paint
- BathroomsPVC
- WindowsGlass panels
- Main doorSKIN door
- Water storageOver HEAD tank
The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.7 km
- Delhi–Gurugram–SNB RRTS7.0 km
- Dwarka ExpresswayOpen, 17 Aug 20257.0 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 9
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
The Corridors (Phase 3)No photo on file yet | Ireo Grace Realtech | Same sector | — | — | — |
The Corridors (Phase 1)No photo on file yet | Ireo Grace Realtech | Same sector | — | — | — |
M3M OPUS AT M3M MERLINNo photo on file yet | Consolidate Realtors | Same sector | — | — | 30 Apr 2030 |
SHREE VARDHMAN MANTRA (Q TOWER)No photo on file yet | Dss Infrastructure | Same sector | — | — | 31 Oct 2028 |
No photo of the project on file yet | 4S Developers | Same sector | — | — | 30 Sep 2021 |
The Corridors (Phase 2)No photo on file yet | Ireo Grace Realtech | Same sector | — | — | — |
VersaliaNo photo on file yet | Ansal Phalak Infrastructure | Same sector | — | — | 31 Dec 2021 |
No photo of the project on file yet | Ansal Properties & Infrastructure | Same sector | — | — | 31 Dec 2021 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Urban 67-A registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as 350 OF 2017, registered on 17 Nov 2017. Ended 31 Oct 2022. The register shows it as: Registration expired.
The source ↗How is the connectivity around Urban 67-A?From the records · Map pin and road lines, read 6 Sep 2026
Urban 67-A is in Sector 67, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Badshahpur. In a straight line it is about 0.7 km from Sohna Elevated Corridor (NH-248A), 7.0 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Urban 67-A?From the records · HARERA, read 3 Nov 2026
Urban 67-A is a Pyramid Infratech project, registered by its company PYRAMID INFRATECH PRIVATE LIMITED.
The source ↗Pyramid Infratech's projects and court recordWhat protections do I have as a buyer?General guidance
Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.
The records
What the registers hold for Urban 67-A: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 350 OF 2017: Registration expired. Ended 31 Oct 2022.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Land licence 10 OF 2016 is on the DTCP register: Licence lapsed; the register prints its validity to 12 Feb 2023.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 2 Nov 2017, building plans 2 Nov 2017.Declared to HARERA, read 15 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 31 Oct 2022. HARERA Gurugram, read 3 Nov 2026. Source
Red flag: Licence 10 OF 2016 lapsed
Named in this project’s application. Valid to 12 Feb 2023; the register’s note: “(COD from Shri Colonizers & Developers Pvt. Ltd)”. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
- Registration no.
- 350 OF 2017
- Registration date
- 17 Nov 2017
- Registration valid till
- 31 Oct 2022
Declared by the promoter to HARERA
- Land area
- 9.83125 (Acre) (39,785.66 sq m)
- FAR
- the application prints 225, which is not a ratio
- licence
- 10 of 2016
- Estimated project cost
- ₹296.04 crore
- Cost of land
- ₹94.03 crore
- Layout plan, declared approved (field 5a)
- 2 Nov 2017
- Building plans, declared approved
- 2 Nov 2017
Statutory approvals, as declared · 8
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (26 Aug 2016)
- II. APPROVAL FOR CHANGE OF LICENSE — declared: already been obtained (13 Nov 2017)
- III. BUILDING PLAN — declared: already been obtained (2 Nov 2017)
- IV. ENVIRONMENT CLEARANCE — declared: already been obtained (13 Feb 2018)
- V. NOC FROM AIRPORT AUTHORITY FOR HEIGHT OF PROJECT — declared: already been obtained (20 Jan 2017)
- VI. NOC FROM FOREST DEPARTMENT — declared: already been obtained (6 Dec 2016)
- VII. HRERA REGISTRATION — declared: already been obtained (17 Nov 2017)
- VIII. ZONING PLAN — declared: already been obtained (26 Aug 2016)
On file with HARERA · 13 files
On file with HARERA (13)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileCompletion certificate (CC)
1 fileDTCP licence
2 filesMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
10 OF 2016 · Pyramid Infratech Pvt Ltd · GURGAON-MANESAR
Licence valid to 12 Feb 2023
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 31 Mar 2020 · read 15 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
10 OF 2016: 17 parcels, 9.8313 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.
The licence register prints the same licensed area, 9.83 acres.
- 140//19/1/22 kanal 13 marla
- 140//19/21 kanal
- 140//19/3 min3 kanal 4 marla
- 140//20/22 kanal
Show the other 13 parcels
- 140//21/14 kanal 3 marla
- 140//21/22 kanal 18 marla
- 140//22/14 kanal 9 marla
- 140//22/23 kanal 11 marla
- 140//23/14 kanal 4 marla
- 140//23/23 kanal 16 marla
- 149//15 kanal 4 marla
- 149//103 kanal 2 marla
- 149//28 kanal
- 149//38 kanal
- 149//88 kanal
- 149//98 kanal
- 149//13/16 kanal 9 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 140//19/1/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,400 per sq ft
Sector 67, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (13 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1353 · read 15 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Pyramid Infratech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

