3X CROSSING SQUARE

by Address Infrastructures · Sector 109, Gurugram

Not on our price list yet

Possession 31 Oct 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 109, Gurugram0.8 km from Dwarka Expressway, in a straight line
Carpet area
1,892–3,603 sq ft
In m²175.8–334.7 m², as declared
Registered by
ADDRESS INFRASTRUCTURES PVT. LTD.the company that filed it, for Address Infrastructures
Timeline
  1. 28 Aug 2023Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 25 Jan 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Oct 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside0.193 acres in all, by use
  • Other usesas the form names them: Land to be used for construction of SCO0.193 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • FloorsFloor tiles
  • WallsOBD & plastic emulsion
  • WindowsLaminated shutter
  • Electrical fittingsGood quality fittings LIKE fromphilips , polycab or equivalent
  • Wi-Fi and broadbandProvision are available

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 109, GurugramSector 109, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS5.3 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is 3X CROSSING SQUARE registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/980/712/2025/83. Valid to 31 Oct 2029.

The source ↗
What is the possession timeline for 3X CROSSING SQUARE?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Oct 2029. Its registration runs to 31 Oct 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around 3X CROSSING SQUARE?From the records · Map pin and road lines, read 6 Sep 2026

3X CROSSING SQUARE is in Sector 109, Gurugram; the site address declared to HARERA is Sector 109, Village Chauma, Gurugram. In a straight line it is about 0.8 km from Dwarka Expressway, 5.3 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building 3X CROSSING SQUARE?From the records · HARERA, read 3 Nov 2026

3X CROSSING SQUARE is a Address Infrastructures project, registered by its company ADDRESS INFRASTRUCTURES PVT. LTD..

The source ↗Address Infrastructures's projects and court record

The records

What the registers hold for 3X CROSSING SQUARE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/980/712/2025/83: Registered. Valid to 31 Oct 2029.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 95 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 11 Nov 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Aug 2023, building plans 25 Jan 2024.Declared to HARERA, read 29 Oct 2026
The court record of Address Infrastructures’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 95 OF 2021 ends soon

    Named in this project’s application. Valid to 11 Nov 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 71 HARERA files, with the dates we read them
Registration no.
GGM/980/712/2025/83
Registration valid till
31 Oct 2029
Declared possession
31 Oct 2029

Declared by the promoter to HARERA

Land area
0.1934 (Acre) (782.66 sq m)
FAR
4.75 proposed of 4.75 permissible
licence
95 of 2021 dated12.11.2021
Estimated project cost
₹34.74 crore
Cost of land
₹12.36 crore
Layout plan, declared approved (field 5a)
28 Aug 2023
Building plans, declared approved
25 Jan 2024
Construction to start
1 May 2025
Completion declared for
31 Oct 2029
Declared inventory · 6 types

Declared inventory

  • Apartment/Shops/Other Buildings · 1 unit · 334.746 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 322.87 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 187.65 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 175.77 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 260.43 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 244.2 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (17 Jun 2022)
  • II. SERVICE PLANS AND ESTIMATES APPROVAL/SANCTION LETTER ONLY — declared: already been obtained (23 Aug 2022)
  • III. ELECTRICAL LOAD AVAILABILITYCONNECTION — declared: already been obtained (6 Jun 2022)
  • IV. MUTATION COPY — declared: already been obtained (16 Apr 2025)
  • V. REVISED SITE PLAN — declared: already been obtained (28 Aug 2023)
  • VI. BR-III FOR SCO 6 — declared: already been obtained (25 Jan 2024)
  • VII. BR-III FOR SCO 9 — declared: already been obtained (25 Jan 2024)
  • VIII. BR-III FOR SCO 10 — declared: already been obtained (25 Jan 2024)
  • IX. ROAD ACCESS FROM GMDA — declared: already been obtained (20 May 2024)
On file with HARERA · 71 files

On file with HARERA (71)

Plans

Site plan

1 file
Approved Site Plan28 Jun 2025

Layout plan

1 file
Latest Layout Plan28 Jun 2025

Demarcation plan

1 file
Demarcation Plan28 Jun 2025

Building plans

12 files
SCO 6 to 8 Plans and Elevations 39 Sept 2025SCO 6 to 8 Plans and Elevations 29 Sept 2025BR-III- S.C.O. -10 Dtp Sanction9 Sept 2025

Services

Sewerage and drainage

5 files
GMDA Storm Water Connection Assurance9 Sept 2025GMDA STP Water Consent9 Sept 2025GMDA Sewerage Assurance9 Sept 2025

Water supply

2 files
Water Supply Scheme Layout Plan9 Sept 2025GMDA Water Assurance9 Sept 2025

Electricity

2 files
Electrical Load9 Sept 2025Aff No Power Line Shifting9 Sept 2025

Roads

1 file
Road Layout Plan9 Sept 2025

Service plans

2 files
Service Plans Approval9 Sept 2025Service Plans on the Layout28 Jun 2025

Approvals and clearances

DTCP licence

6 files
LC IV D9 Sept 2025LOI9 Sept 2025LC IV9 Sept 2025

Other NOCs and clearances

4 files
Aff No Forest Land9 Sept 2025Aff NCZ NOC9 Sept 2025Aff No Tree Cutting9 Sept 2025Forest NOC9 Sept 2025

Land records

Land records

8 files
Layout Superimposed on Sizra9 Sept 2025Sale Deed9 Sept 2025Collaboration Addednum9 Sept 2025

Sales papers

Allotment and sale agreements

3 files
Conveyence Deed9 Sept 2025Allotment9 Sept 2025BBA9 Sept 2025

Brochure and specifications

2 files
Brochure Part 29 Sept 2025Brochure Part 39 Sept 2025

Money

Accounts and finance

10 files
Bank NOC9 Sept 2025CA Certificate Equity9 Sept 2025CA Certificate for Financial and Inventory Revised9 Sept 2025

The promoter’s papers

Declarations and affidavits

4 files
Bank Undertaking Revised - 3XCROSSING Square9 Sept 2025The Promoter’s Declaration on Affidavit9 Sept 20254(2)(L)(D) Affidavit9 Sept 2025Application Form9 Sept 2025

HARERA’s orders

HARERA’s orders

1 file
Collaboration Addendum 29 Sept 2025

Other filings

Other filings

6 files
Repayment Schedule9 Sept 2025Ar 2022-239 Sept 2025Approved Booklet9 Sept 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

95 OF 2021 · BRISK INFRASTRUCTURE & DEVELOPERS PVT LTD · GURGAON-MANESAR

Licence valid to 11 Nov 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Jul 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

95 OF 2021: 15 parcels, 3.6423 acres in all, in Choma (hadbast 62), tehsil Gurgaon.

The licence register prints the same licensed area, 3.6423 acres.

  • 45//15/12 kanal 10 marla
  • 45//16/1/21 kanal 15 marla
  • 45//16/2/2/22 kanal 7 marla 1 sarsai
  • 45//17/12 kanal 5 marla
Show the other 11 parcels
  • 45//17/22 kanal 7 marla
  • 45//249 kanal 16 marla
  • 47//3/115 marla 3 sarsai
  • 47//3/216 marla 3 sarsai
  • 47//3/37 marla 6 sarsai
  • 47//3/44 marla 3 sarsai
  • 47//3/817 marla 6 sarsai
  • 47//3/94 marla 5 sarsai
  • 47//4/1/113 marla
  • 47//4/1/21 kanal 17 marla 7 sarsai
  • 45//16/2/2/12 kanal 6 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Choma (hadbast 62), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 45//15/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan28 Jun 2025

Layout plan

1 file
Latest Layout Plan28 Jun 2025

Building plans

12 files
SCO 6 to 8 Plans and Elevations 39 Sept 2025SCO 6 to 8 Plans and Elevations 29 Sept 2025BR-III- S.C.O. -10 Dtp Sanction9 Sept 2025SCO 6 to 8 Plans and Elevations9 Sept 2025SCO 9 and 10 Plans and Elevations9 Sept 2025Mca- Address Infrastructure9 Sept 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (71 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3563 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Address Infrastructures

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.