Possession 11 Nov 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 109, Gurugram0.8 km from Dwarka Expressway, in a straight line
Registered by
BRISK INFRASTRUCTURES AND DEVELOPERS PVT LTDthe company that filed it, for Brisk Infrastructures And Developers
Timeline
  1. 16 Nov 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 11 Nov 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside14,740 m² in all, by use
  • Plots for sale5,078 m² · 34%
  • Other usesas the form names them: Construction of circulation road, Land for services and utility block4,870 m² · 33%
  • Roads2,520 m² · 17%
  • Parks and playgrounds1,259 m² · 9%
  • Parking1,013 m² · 7%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 109, GurugramSector 109, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS5.3 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is 3XCROSSING registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/602/334/2022/77. Valid to 11 Nov 2026.

The source ↗
What is the possession timeline for 3XCROSSING?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 11 Nov 2026. Its registration runs to 11 Nov 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around 3XCROSSING?From the records · Map pin and road lines, read 6 Sep 2026

3XCROSSING is in Sector 109, Gurugram; the site address declared to HARERA is Sector 109, Village - Chouma, Gurugram. Haryana. In a straight line it is about 0.8 km from Dwarka Expressway, 5.3 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building 3XCROSSING?From the records · HARERA, read 3 Nov 2026

3XCROSSING is a Brisk Infrastructures And Developers project, registered by its company BRISK INFRASTRUCTURES AND DEVELOPERS PVT LTD.

The source ↗Brisk Infrastructures And Developers's projects and court record

The records

What the registers hold for 3XCROSSING: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/602/334/2022/77: Registered. Valid to 11 Nov 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 95 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 11 Nov 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 16 Nov 2021.Declared to HARERA, read 29 Oct 2026
The court record of Brisk Infrastructures And Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 11 Nov 2026. HARERA Gurugram, read 3 Nov 2026. Source

  • Amber flag: Licence 95 OF 2021 ends soon

    Named in this project’s application. Valid to 11 Nov 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 52 HARERA files, with the dates we read them
Registration no.
GGM/602/334/2022/77
Registration valid till
11 Nov 2026
Declared possession
11 Nov 2026

Declared by the promoter to HARERA

Land area
3.6423 (Acre) (14,739.87 sq m)
FAR
1.48 proposed of 1.5 permissible
licence
95 of 2021 dated 12-11-2021
Estimated project cost
₹60.41 crore
Cost of land
₹24.59 crore
Layout plan, declared approved (field 5a)
16 Nov 2021
Construction to start
12 Oct 2022
Completion declared for
11 Nov 2026
Statutory approvals, as declared · 2

Statutory approvals, as declared

  • I. LICENCE — declared: already been obtained (12 Nov 2021)
  • II. LAYOUT PLAN — declared: already been obtained (16 Nov 2021)
On file with HARERA · 52 files

On file with HARERA (52)

Plans

Site plan

1 file
Approved Site Plan23 Jun 2022

Layout plan

1 file
Latest Layout Plan23 Jun 2022

Zoning plan

1 file
Zoning Plan23 Jun 2022

Demarcation plan

1 file
Demarcation Plan23 Jun 2022

Building plans

11 files
SCO 2-10 Elevation and Section18 Aug 2022SCO- 13,14,17,18 Elevation and Section18 Aug 2022SCO 20-23, 26-31, 32-40 Floor Plans and Elevations18 Aug 2022

Floor plans

7 files
SCO 2-10 Floor Plans18 Aug 2022SCO 13,14,17,18 Floor Plans18 Aug 2022SCO 15,16 Floor Plans18 Aug 2022

Services

Sewerage and drainage

4 files
Sewerage Scheme Layout Plan2 Sept 2022Storm Water Drainage Scheme Layout Plan2 Sept 2022GMDA Sewerage Assurance18 Aug 2022GMDA Storm Water Connection Assurance18 Aug 2022

Water supply

1 file
Water Supply Scheme Layout Plan2 Sept 2022

Roads

1 file
Road Layout Plan2 Sept 2022

Service plans

3 files
Service Estimates2 Sept 2022Service Estimates Approval Letter2 Sept 2022Service Plans on the Layout23 Jun 2022

Approvals and clearances

DTCP licence

2 files
LOI18 Aug 2022Licence Copy with Land Schedule23 Jun 2022

Other NOCs and clearances

1 file
Forest NOC18 Aug 2022

Land records

Land records

8 files
Layout Superimposed on Sizra2 Sept 2022Brisk Jamabandi Latest18 Aug 2022Brisk Latest Shajra18 Aug 2022

Money

Accounts and finance

3 files
Non-Default Certificate from a CA18 Aug 2022Cash Flow Statement18 Aug 2022CA Certificate on the Application’s Figures18 Aug 2022

The promoter’s papers

Declarations and affidavits

5 files
Undertaking Tree Cutting18 Aug 2022Undertaking - Electrical Load18 Aug 2022Undertaking - Road Access18 Aug 2022

HARERA’s orders

HARERA’s orders

1 file
Addendum Collaboration18 Aug 2022

Other filings

Other filings

1 file
Brisk Gillson Mou18 Aug 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

95 OF 2021 · BRISK INFRASTRUCTURE & DEVELOPERS PVT LTD · GURGAON-MANESAR

Licence valid to 11 Nov 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Jun 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

95 OF 2021: 15 parcels, 3.6423 acres in all, in Choma (hadbast 62), tehsil Gurgaon.

The licence register prints the same licensed area, 3.6423 acres.

  • 45//15/12 kanal 10 marla
  • 45//16/1/21 kanal 15 marla
  • 45//16/2/2/22 kanal 7 marla 1 sarsai
  • 45//17/12 kanal 5 marla
Show the other 11 parcels
  • 45//17/22 kanal 7 marla
  • 45//249 kanal 16 marla
  • 47//3/115 marla 3 sarsai
  • 47//3/216 marla 3 sarsai
  • 47//3/37 marla 6 sarsai
  • 47//3/44 marla 3 sarsai
  • 47//3/817 marla 6 sarsai
  • 47//3/94 marla 5 sarsai
  • 47//4/1/113 marla
  • 47//4/1/21 kanal 17 marla 7 sarsai
  • 45//16/2/2/12 kanal 6 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Choma (hadbast 62), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 45//15/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Jun 2022

Layout plan

1 file
Latest Layout Plan23 Jun 2022

Building plans

11 files
SCO 2-10 Elevation and Section18 Aug 2022SCO- 13,14,17,18 Elevation and Section18 Aug 2022SCO 20-23, 26-31, 32-40 Floor Plans and Elevations18 Aug 2022SCO-1 Elevation and Section18 Aug 2022SCO-1, Section and Elevation18 Aug 2022SCO-11 Floor Plan, Elevations and Section18 Aug 2022

Floor plans

7 files
SCO 2-10 Floor Plans18 Aug 2022SCO 13,14,17,18 Floor Plans18 Aug 2022SCO 15,16 Floor Plans18 Aug 2022SCO-1 Floor Plan18 Aug 2022SCO-19 Floor Plan18 Aug 2022SCO-25 Floor Plans18 Aug 2022SCO-34 Floor Plans18 Aug 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (52 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2000 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Brisk Infrastructures And Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.