Conscient One
by Conscient Infrastructure · Sector 109, Gurugram
Not on our price list yet
Possession 31 Jul 2021 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 109, Gurugram0.8 km from Dwarka Expressway, in a straight linePrices and what changed
- Registered by
- CONSCIENT INFRASTRUCTURE PVT LTDthe company that filed it, for Conscient Infrastructure
- 19 Oct 2012Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 16 Jan 2019Registered with HARERAHARERA, read 4 Nov 2026
- 30 Apr 2021Registration valid toHARERA, read 4 Nov 2026
- 31 Jul 2021Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Other uses5,825 m² · 46%
- Roads4,209 m² · 33%
- Apartment buildings2,382 m² · 19%
- Parks and playgrounds243 m² · 2%
- Electricity sub-station40 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningIndividual split units for shops and offices
- Kitchen appliancesRefrigerator, hob, chimney, microwave, utensils & cutlery.
- LiftsEight lifts & two escalators lift-1:- 14 passengers. lift-2 :- 14 passengers. lift-3 :- 14 passengers. lift-4 :- 14 passengers. lift-5 :- 1020 KG. lift-6 :- 14 passengers. lift-7 :- 16 passengers. lift-8 :- 1020 KG. escalator :- 1000MM WIDE, 0.5MPS (4 NOS)
- FloorsLobby and corridors - 300X600, 600X1200 vitrified tiles staircase – KOTA stone/ restile
- WallsLobby and corridors – enamel DADO+ acrylic emulsion + PART wall tiling staircase – enamel DADO +OBD
- BathroomsCP fitting and fixtures ISI marked
- WindowsAluminium structure glazing with 6MM thick normal / reflective toughened glass
- Electrical fittingsISI marked fittings
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.8 km
- Delhi–Gurugram–SNB RRTS5.3 km
- Sohna Elevated Corridor (NH-248A)7.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 3
- Registered, no OC or CC yet: 3
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
3XCROSSINGNo photo on file yet | Brisk Infrastructures And Developers | Same sector | — | — | 11 Nov 2026 |
ATS TourmalineNo photo on file yet | Almond Infrabuild | Same sector | — | — | — |
No photo of the project on file yet | Ocean Seven Buildtech | Same sector | — | — | — |
Neo SquareNo photo on file yet | Neo Developers | Same sector | — | — | — |
No photo of the project on file yet | Chintels India | Same sector | — | — | 31 Dec 2018 |
No photo of the project on file yet | Chintels India | Same sector | — | — | 31 Dec 2018 |
No photo of the project on file yet | Raheja Developers | Same sector | — | — | 27 Aug 2022 |
No photo of the project on file yet | Address Infrastructures | Same sector | — | — | 31 Oct 2029 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Conscient One registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/308/40/2019/02, registered on 16 Jan 2019. Ended 30 Apr 2021. The register shows it as: Registration expired.
The source ↗What is the possession timeline for Conscient One?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Jul 2021. Its registration runs to 30 Apr 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Conscient One?From the records · Map pin and road lines, read 6 Sep 2026
Conscient One is in Sector 109, Gurugram; the site address declared to HARERA is Sector - 109, Gurugram. In a straight line it is about 0.8 km from Dwarka Expressway, 5.3 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Conscient One?From the records · HARERA, read 4 Nov 2026
Conscient One is a Conscient Infrastructure project, registered by its company CONSCIENT INFRASTRUCTURE PVT LTD.
The source ↗Conscient Infrastructure's projects and court recordThe records
What the registers hold for Conscient One: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/308/40/2019/02: Registration expired. Ended 30 Apr 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 102 OF 2008 is on the DTCP register: Licence lapsed; the register prints its validity to 14 May 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 19 Oct 2012, building plans 19 Oct 2012.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 30 Apr 2021. HARERA Gurugram, read 4 Nov 2026. Source
Red flag: Licence 102 OF 2008 lapsed
Named in this project’s application. Valid to 14 May 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Red flag: Licence 83 OF 2014 lapsed
Named in this project’s application. Valid to 8 Aug 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 10 HARERA files, with the dates we read them
- Registration no.
- GGM/308/40/2019/02
- Registration date
- 16 Jan 2019
- Registration valid till
- 30 Apr 2021
- Declared possession
- 31 Jul 2021
Declared by the promoter to HARERA
- Land area
- 3.138 (Acre) (12,699.04 sq m)
- FAR
- the application prints 100, which is not a ratio
- licence
- License no. 102 of 2008 (14-05-2020) License no. 83 of 2014 (08-08-2019)
- Estimated project cost
- ₹173.00 crore
- Cost of land
- ₹39.50 crore
- Layout plan, declared approved (field 5a)
- 19 Oct 2012
- Building plans, declared approved
- 19 Oct 2012
- Completion declared for
- 31 Jul 2021
Declared inventory · 2 types
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type SERVICE SUITE · 75 units
- APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS · 283 units
Statutory approvals, as declared · 5
Statutory approvals, as declared
- I. FOREST NOC — declared: already been obtained (17 Jan 2013)
- II. AIRPORT HEIGHT CLEARANCE NOC — declared: already been obtained (31 Dec 2014)
- III. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (27 Sept 2012)
- IV. ENVIRONMENT CLEARANCE — declared: already been obtained (8 Jul 2009)
- V. MINING PERMISSION — declared: already been obtained (26 Mar 2015)
On file with HARERA · 10 files
On file with HARERA (10)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileApprovals and clearances
Occupation certificate (OC)
2 filesDTCP licence
1 fileMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 2 DTCP licences named on the application
102 OF 2008 · Shri Maya Buildcon · GURGAON-MANESAR
Licence valid to 14 May 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
83 OF 2014 · Shrimaya Buildcon Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 8 Aug 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jan 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 2 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
102 OF 2008: 15 parcels, 8.2375 acres in all, in Pawala Khusrupur (hadbast 57), tehsil Kadipur.
The licence register prints the same licensed area, 8.24 acres.
- rectangle 17, kila 127 kanal 2 marla
- rectangle 17, kila 8 kanal
- rectangle 17, kila 143 kanal 5 marla
- rectangle 17, kila 2 kanal 1 marla
Show the other 11 parcels
- rectangle 17, kila 3 kanal 16 marla
- rectangle 17, kila 1 kanal 14 marla
- rectangle 17, kila 5 kanal 16 marla
- rectangle 17, kila 2 kanal 4 marla
- rectangle 17, kila 2711 marla
- rectangle 17, kila 4 kanal
- rectangle 17, kila 4 kanal
- rectangle 17, kila 47 kanal 9 marla
- rectangle 17, kila 8 kanal
- rectangle 17, kila 4 kanal
- rectangle 17, kila 4 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
83 OF 2014: 1 parcel, 0.1563 acres in all, in Parwala khusrupur (hadbast 54), tehsil Kadipur.
The licence register prints the same licensed area, 0.16 acres.
- rectangle 17, kila 19/11 kanal 5 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village you want: Pawala Khusrupur (hadbast 57) or Parwala khusrupur (hadbast 54), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 17, kila 12.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, commercial property
- ₹2,52,000 per sq yd
Sector 109, collector rates effective 1 Apr 2026, Kadipur tehsil. 2 tehsil lists price this sector; this is the higher. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (10 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/382 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Conscient Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.



