Skip to content

Neo Square

by Neo Developers · Sector 109, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 109, Gurugram0.8 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
about 2,567 sq ft
In m²about 238.4 m², the average flat, as declared
Registered
24 Aug 2017
Registered by
NEO DEVELOPERS PVT. LTD.the company that filed it, for Neo Developers
Timeline
  1. 24 Aug 2017Registered with HARERAHARERA, read 3 Nov 2026
  2. 16 Oct 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 22 Feb 2025Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningProvision of AHU with chill water pipe system
  • LiftsI)passenger elevators (II stainless steel finish with light and ceiling III) dedicated service lift thyssen
  • FloorsItalain marbels , granite , tiles ,
  • WallsCombination of tiles, stones, and paints (common area only )
  • BathroomsJaguar / americian standard
  • WindowsTEEK wood
  • Main door12 MM frameless glass door
  • Electrical fittingsHavel’S

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 109, GurugramSector 109, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS5.3 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Neo Square registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 109 OF 2017, registered on 24 Aug 2017. Ended 22 Feb 2025. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Neo Square?From the records · Map pin and road lines, read 6 Sep 2026

Neo Square is in Sector 109, Gurugram; the site address declared to HARERA is Sector-109, Village Pawala Khusrupur, Tehsil Gurugram, Haryana. In a straight line it is about 0.8 km from Dwarka Expressway, 5.3 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Neo Square?From the records · HARERA, read 3 Nov 2026

Neo Square is a Neo Developers project, registered by its company NEO DEVELOPERS PVT. LTD..

The source ↗Neo Developers's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Neo Square: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 109 OF 2017: Registration expired. Ended 22 Feb 2025.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 102 OF 2008 is on the DTCP register: Licence lapsed; the register prints its validity to 14 May 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 16 Oct 2019, building plans 16 Oct 2019.Declared to HARERA, read 29 Oct 2026
The court record of Neo Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 22 Feb 2025. HARERA Gurugram, read 3 Nov 2026. Source

  • Red flag: Licence 102 OF 2008 lapsed

    Named in this project’s application. Valid to 14 May 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 48 HARERA files, with the dates we read them
Registration no.
109 OF 2017
Registration date
24 Aug 2017
Registration valid till
22 Feb 2025

Declared by the promoter to HARERA

Land area
8.237 (Acre) (33,333.96 sq m)
FAR
the application prints 187, which is not a ratio
licence
102 of 2008
Estimated project cost
₹255.23 crore
Cost of land
₹36.06 crore
Layout plan, declared approved (field 5a)
16 Oct 2019
Building plans, declared approved
16 Oct 2019
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL · 579 units · 1,38,059.5 sq m carpet · total for 579 flats, about 238.4 m² each
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. AIRPORT NOC — declared: already been obtained (31 Dec 2014)
  • II. ENVIRONMENT CLEARANCE — declared: already been obtained (17 Dec 2014)
  • III. BUILDING PLAN APPROVAL (BR-III) — declared: already been obtained (16 Oct 2019)
  • IV. MINING PERMISSION — declared: already been obtained (28 Jan 2013)
  • V. FOREST NOC — declared: already been obtained (18 Apr 2017)
On file with HARERA · 48 files

On file with HARERA (48)

Plans

Site plan

1 file
Approved Site Plan4 Jan 2020

Layout plan

1 file
Latest Layout Plan6 Jan 2020

Zoning plan

1 file
Zoning Plan4 Jan 2020

Demarcation plan

1 file
Demarcation Plan4 Jan 2020

Building plans

4 files
BR-III6 Jan 2020Approved Building Plans, Full Set6 Jan 2020Elevations6 Jan 2020Terrace Plan6 Jan 2020

Floor plans

16 files
15th and 16th Floor Plan6 Jan 20207th and 8th Floor Plan6 Jan 2020Basement 16 Jan 2020

Services

Landscape and green areas

1 file
Green Area FAR 12% Incremental8 Feb 2020

Service plans

2 files
Service Estimates Approval27 Feb 2020Service Plans on the Layout6 Jan 2020

Approvals and clearances

DTCP licence

4 files
LC-IV27 Feb 2020Details of Project-License Renewal8 Feb 2020LOI7 Jan 2020Licence Copy with Land Schedule4 Jan 2020

Environment clearance

1 file
Environment Clearance6 Jan 2020

Other NOCs and clearances

2 files
Height and AAI NOC6 Jan 2020Forest NOC4 Jan 2020

Land records

Land records

3 files
Revenue Record Entry of Licence and Collaboration8 Feb 2020Sijra Plan6 Jan 2020Jamabandi6 Jan 2020

Money

Accounts and finance

3 files
DD for Registration Fee Submission8 Feb 2020Non-Default Certificate from a CA16 Jan 2020CA Certificate on the Application’s Figures16 Jan 2020

The promoter’s papers

Declarations and affidavits

2 files
Affidavit8 Feb 2020The Promoter’s Declaration on Affidavit9 Jan 2020

Company papers

2 files
Incorporation Certificate6 Jan 2020Board Resolution6 Jan 2020

HARERA’s orders

HARERA’s orders

1 file
Extension No. 06 of 2022 dated 14.11.20222 Jan 2023

Other filings

Other filings

3 files
Project Continuation- RC/REP/HARERA/GGM/109 of 2017/7(3)/33/2023/10 Dated 14.10.202420 Nov 2024Project Continuation- RC/REP/HARERA/GGM/109 of 2017/7(3)/33/2023/10 Dated 29.03.202318 Aug 2023Detail of Project Promoter Bip8 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

102 OF 2008 · Shri Maya Buildcon · GURGAON-MANESAR

Licence valid to 14 May 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

102 OF 2008: 15 parcels, 8.2375 acres in all, in Pawala Khusrupur (hadbast 57), tehsil Kadipur.

The licence register prints the same licensed area, 8.24 acres.

  • rectangle 17, kila 127 kanal 2 marla
  • rectangle 17, kila 8 kanal
  • rectangle 17, kila 143 kanal 5 marla
  • rectangle 17, kila 2 kanal 1 marla
Show the other 11 parcels
  • rectangle 17, kila 3 kanal 16 marla
  • rectangle 17, kila 1 kanal 14 marla
  • rectangle 17, kila 5 kanal 16 marla
  • rectangle 17, kila 2 kanal 4 marla
  • rectangle 17, kila 2711 marla
  • rectangle 17, kila 4 kanal
  • rectangle 17, kila 4 kanal
  • rectangle 17, kila 47 kanal 9 marla
  • rectangle 17, kila 8 kanal
  • rectangle 17, kila 4 kanal
  • rectangle 17, kila 4 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Pawala Khusrupur (hadbast 57), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 17, kila 12.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,52,000 per sq yd

Sector 109, collector rates effective 1 Apr 2026, Kadipur tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan4 Jan 2020

Layout plan

1 file
Latest Layout Plan6 Jan 2020

Building plans

4 files
BR-III6 Jan 2020Approved Building Plans, Full Set6 Jan 2020Elevations6 Jan 2020Terrace Plan6 Jan 2020

Floor plans

16 files
15th and 16th Floor Plan6 Jan 20207th and 8th Floor Plan6 Jan 2020Basement 16 Jan 20202nd Floor Plan6 Jan 20205th and 6th Floor Plan6 Jan 202017th Floor Plan6 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (48 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1172 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Neo Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.