Skip to content

Affordable Group Housing Colony

by Pivotal Infrastructure · Sector 62, Gurugram

Not on our price list yet

Possession 21 Jan 2020 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 62, Gurugram3.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
306–645 sq ft
In m²about 28–60 m², as declared
Registered
1 Sep 2017
Registered by
M/S PIVOTALINFRASTRUCTURE PVT. LTDthe company that filed it, for Pivotal Infrastructure
Timeline
  1. 25 Jul 2016Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 1 Sep 2017Registered with HARERAHARERA, read 3 Nov 2026
  3. 21 Jan 2020Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 29 May 2021Registration valid toHARERA, read 3 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

740homes, 306 to 645 sq ft of carpet area
  • Under 1,000 sq ft306–645 sq ft740

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.069 acres in all, by use
  • Roads1.222 acres · 24%
  • Pavements1.15 acres · 23%
  • Apartment buildings0.93 acres · 18%
  • Parks and playgrounds0.651 acres · 13%
  • Green belts0.381 acres · 8%
  • Other usesas the form names them: Land, Water0.379 acres · 7%
  • Sewage and waste treatment0.136 acres · 3%
  • Parking0.121 acres · 2%
  • Electricity sub-station0.098 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenTiles
  • LiftsSchindler make
  • FloorsTiles
  • WallsOil bound distemper
  • BathroomsISI MARK
  • WindowsPower coated/anodized UPVC frame windows
  • Main doorPainted hardwood with moulded flush doors
  • Electrical fittingsUSE of ISI marked products for wiring, switches and circuits

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 62, GurugramSector 62, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)3.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20258.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Affordable Group Housing Colony registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 178 OF 2017, registered on 1 Sep 2017. The register’s record shows an end date of 29 May 2021. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Affordable Group Housing Colony?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 21 Jan 2020. Its registration runs to 29 May 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Affordable Group Housing Colony?From the records · Map pin and road lines, read 6 Sep 2026

Affordable Group Housing Colony is in Sector 62, Gurugram; the site address declared to HARERA is Village Ullhawas, Sector-62, Gurugram. In a straight line it is about 3.8 km from Sohna Elevated Corridor (NH-248A), 6.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Affordable Group Housing Colony?From the records · HARERA, read 3 Nov 2026

Affordable Group Housing Colony is a Pivotal Infrastructure project, registered by its company M/S PIVOTALINFRASTRUCTURE PVT. LTD.

The source ↗Pivotal Infrastructure's projects and court record

The records

What the registers hold for Affordable Group Housing Colony: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 178 OF 2017: Registration lapsed. The register’s record shows an end date of 29 May 2021.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 5 OF 2016 is on the DTCP register: Licence lapsed; the register prints its validity to 30 Sep 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 25 Jul 2016, building plans 25 Jul 2016.Declared to HARERA, read 29 Oct 2026
The court record of Pivotal Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 5 OF 2016 lapsed

    Named in this project’s application. Valid to 30 Sep 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 29 May 2021. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 8 HARERA files, with the dates we read them
Registration no.
178 OF 2017
Registration date
1 Sept 2017
Registration valid till
29 May 2021
Declared possession
21 Jan 2020

Declared by the promoter to HARERA

Land area
5.06875 (Acre) (20,512.5 sq m)
FAR
the application prints 225, which is not a ratio
licence
5 of 2016 (30.05.2016)
Estimated project cost
₹159.47 crore
Cost of land
₹21.17 crore
Layout plan, declared approved (field 5a)
25 Jul 2016
Building plans, declared approved
25 Jul 2016
Completion declared for
21 Jan 2020
Declared inventory · 5 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK- A · 140 units · 53.284 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK-B · 140 units · 53.503 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK STYDY A · 140 units · 59.89 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK STYDY B · 140 units · 59.928 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 1 BHK · 180 units · 28.392 sq m carpet · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. POLLUTION — declared: already been obtained (14 Sept 2017)
  • II. BUILDING PLAN APPROVAL — declared: already been obtained (25 Jul 2016)
  • III. ENVIRONMENT CLEARANCE — declared: already been obtained (28 Jul 2017)
  • IV. FIRE SCHEME APPROVAL — declared: already been obtained (12 Apr 2017)
  • V. POWER LOAD ASSURANCE — declared: already been obtained (9 Jun 2016)
  • VI. SEWRAGE TREATED WATER FOR CONSTRUCTION — declared: already been obtained (27 May 2016)
  • VII. WATER SUPPLY ASSURANCE — declared: already been obtained (20 Mar 2017)
On file with HARERA · 8 files

On file with HARERA (8)

Plans

Site plan

1 file
Approved Site Plan30 Nov 2019

Layout plan

1 file
Latest Layout Plan30 Nov 2019

Zoning plan

1 file
Zoning Plan30 Nov 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule30 Nov 2019

Sales papers

Allotment and sale agreements

1 file
A Copy of the Draft Allotment Letter by Which the Apartment Shall Be Allotted/ Booked in Favour of the Apartment Buyers30 Nov 2019

Money

Accounts and finance

2 files
A Copy of the Draft Agreement Which Shall Be Made Before Seeking Any Deposit Exceeding 10% of the Cost of the Apartment.(based on the Model Agreement Prescribed in the Rules)30 Nov 2019Non-Default Certificate from a CA30 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit30 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

5 OF 2016 · PIVOTAL INFRASTRUCTURE PVT. LTD. · GURGAON-MANESAR

Licence valid to 30 Sept 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

5 OF 2016: 12 parcels, 5.0687 acres in all, in Ulahwas (hadbast 83), tehsil Wazirabad.

The licence register prints the same licensed area, 5.0688 acres.

  • 18//14/13 kanal 14 marla
  • 18//162 kanal 8 marla
  • 18//17/1/13 kanal 12 marla
  • 18//17/1/23 kanal 6 marla
Show the other 8 parcels
  • 18//17/21 kanal 2 marla
  • 18//18/12 kanal 8 marla
  • 18//18/211 marla
  • 18//23/21 kanal 1 marla
  • 18//24/26 kanal 16 marla
  • 18//25/13 kanal 17 marla
  • 20//48 kanal
  • 18//14/23 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Ulahwas (hadbast 83), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 18//14/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹9,900 per sq ft

Sector 62, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan30 Nov 2019

Layout plan

1 file
Latest Layout Plan30 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (8 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1023 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pivotal Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.