Skip to content

Araya

by Pioneer Urban Land & Infrastructure · Sector 62, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 62, Gurugram3.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Home types
3, 4 and 5 BHK
Registered
24 Aug 2017
Registered by
PIONEER URBAN LAND AND INFRASTRUCTURE LTDthe company that filed it, for Pioneer Urban Land & Infrastructure
Timeline
  1. 18 Oct 2011Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 24 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2020Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside8.7 acres in all, by use
  • Parks and playgrounds4.378 acres · 50%
  • Roads1.98 acres · 23%
  • Apartment buildings1.07 acres · 12%
  • Pavements0.81 acres · 9%
  • Other uses0.455 acres · 5%
  • Parking0.007 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV
  • KitchenWalls combination of lacquered glass and imported tiles floor imported tiles doors and windows timber veneered and aluminium others high END european modular kitchen
  • Kitchen appliancesHigh END european modular kitchen
  • LiftsOTIS 4 passegner + 1 service lift in each tower
  • WardrobesHigh END wardrobes
  • FloorsItalian/ european marble, tiles / marble
  • WallsTextured paint
  • BathroomsWalls imported tiles floor imported tiles / marble doors and windows timber veneered and aluminium others steam/ jacuzzi premium imported CP fittings premium imported sanitary WARE

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 62, GurugramSector 62, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)3.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20258.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Araya registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 101 OF 2017, registered on 24 Aug 2017. Ended 31 Dec 2020. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Araya?From the records · Map pin and road lines, read 6 Sep 2026

Araya is in Sector 62, Gurugram; the site address declared to HARERA is Pioneer Urban Land And Infrastructure Ltd. Group Housing Colony, Sector-62, Gurugram. In a straight line it is about 3.8 km from Sohna Elevated Corridor (NH-248A), 6.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Araya?From the records · HARERA, read 4 Nov 2026

Araya is a Pioneer Urban Land & Infrastructure project, registered by its company PIONEER URBAN LAND AND INFRASTRUCTURE LTD.

The source ↗Pioneer Urban Land & Infrastructure's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Araya: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 101 OF 2017: Registration expired. Ended 31 Dec 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 268 OF 2007 is on the DTCP register: Licence ends soon; the register prints its validity to 2 Dec 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 18 Oct 2011, building plans 18 Oct 2011.Declared to HARERA, read 29 Oct 2026
The court record of Pioneer Urban Land & Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2020. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 268 OF 2007 ends soon

    Named in this project’s application. Valid to 2 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 34 HARERA files, with the dates we read them
Registration no.
101 OF 2017
Registration date
24 Aug 2017
Registration valid till
31 Dec 2020

Declared by the promoter to HARERA

Land area
8.7 (Acre) (35,207.65 sq m)
FAR
the application prints 100, which is not a ratio
licence
268 OF 2007
Estimated project cost
₹686.81 crore
Cost of land
₹41.29 crore
Layout plan, declared approved (field 5a)
18 Oct 2011
Building plans, declared approved
18 Oct 2011
Declared inventory · 29 types

Declared inventory — 29 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-H-4BHK+FAM+SPL · 6 units · 1,816.05 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-H-4BHK+FAM+TERRACE · 2 units · 866.59 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-H-5BHK · 12 units · 4,244.15 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-H-5BHK+FAM+TERRACE · 2 units · 1,182.27 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-J-4BHK · 16 units · 4,767.37 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-J-4BHK+FAM · 20 units · 6,603.31 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-J-4BHK+FAM+SPL · 6 units · 1,894.09 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-F-3BHK · 12 units · 2,685.62 sq m carpet
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (3 Dec 2007)
  • II. ZONING PLAN — declared: already been obtained (25 Jun 2015)
  • III. APPROVAL OF BUILDING PLAN — declared: already been obtained
  • IV. WATER CONNECTION — declared: already been obtained (23 Jan 2018)
  • V. APPROVAL OF FIRE FIGHTING SCHEME — declared: already been obtained (13 Dec 2013)
  • VI. ENVIRONMENTAL CLEARANCE — declared: already been obtained (4 Jun 2008)
  • VII. NOC FOR POLLUTION — declared: already been obtained (21 Aug 2019)
  • VIII. HEIGHT CLEARANCE BY AAI — declared: already been obtained (15 Oct 2012)
  • IX. NOC FORM FOREST DEPT. — declared: already been obtained (19 Aug 2011)
  • X. RAIN WATER HARVESTING — declared: already been obtained (1 Jan 2016)
  • XI. FOREST NOC FROM DC OFFICE — declared: already been obtained (19 Aug 2011)
  • XII. SEWER CONNECTION — declared: already been obtained (16 Jan 2018)
On file with HARERA · 34 files

On file with HARERA (34)

Plans

Site plan

3 files
Site Plan Araya14 Feb 2020Site Plan28 Nov 2019Approved Site Plan25 Nov 2019

Layout plan

1 file
Latest Layout Plan28 Nov 2019

Zoning plan

1 file
Zoning Plan14 Feb 2020

Demarcation plan

1 file
Demarcation Plan14 Feb 2020

Building plans

7 files
Approved Building Plans, Full Set28 Nov 2019Approved Building Plans, Full Set28 Nov 2019Approved Building Plans, Full Set28 Nov 2019

Services

Service plans

2 files
Service Estimate Araya14 Feb 2020Service Plans on the Layout28 Nov 2019

Approvals and clearances

Occupation certificate (OC)

4 files
Occupation Certificate13 Aug 2024OC Araya Tower -F14 Feb 2020OC Araya Tower-G14 Feb 2020OC Araya Tower-H & Shops14 Feb 2020

DTCP licence

3 files
LC-IV14 Feb 2020LOI14 Feb 2020Licence Copy with Land Schedule25 Nov 2019

Sales papers

Allotment and sale agreements

2 files
Sample Allotment Letter4 Dec 2019Draft Agreement4 Dec 2019

Money

Accounts and finance

5 files
Cash Flow Statement14 Feb 2020CA Certificate on the Application’s Figures14 Feb 2020Copy of DD14 Feb 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit25 Nov 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. 07 OF 2020 DATED-11.06.20204 Aug 2020

Other filings

Other filings

3 files
Tir Araya-Pioneer14 Feb 2020BR for RERA Account Araya14 Feb 2020Approvals28 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

268 OF 2007 · Pioneer Urban Land & Infrastructure · GURGAON-MANESAR

Licence valid to 2 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 24 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

268 OF 2007

DTCP’s page showed no land schedule for licence 268 OF 2007 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, residential flat
₹9,900 per sq ft

Sector 62, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan Araya14 Feb 2020Site Plan28 Nov 2019Approved Site Plan25 Nov 2019

Layout plan

1 file
Latest Layout Plan28 Nov 2019

Building plans

7 files
Approved Building Plans, Full Set28 Nov 2019Approved Building Plans, Full Set28 Nov 2019Approved Building Plans, Full Set28 Nov 2019Approved Building Plans, Full Set28 Nov 2019Approved Building Plans, Full Set28 Nov 2019Approved Building Plans, Full Set28 Nov 2019Approved Building Plans, Full Set28 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (34 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/941 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pioneer Urban Land & Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.