Skip to content

ARCADE 68

by DLF Home Developers · Sector 68, Gurugram

Not on our price list yet

Possession 10 Nov 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 68, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
Registered by
DLF HOME DEVELOPERS LIMITEDthe company that filed it, for DLF Home Developers
Timeline
  1. 15 Nov 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Nov 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2 acres in all, by use
  • Roads0.9 acres · 45%
  • Plots for sale0.52 acres · 26%
  • Parks and playgrounds0.33 acres · 17%
  • Parking0.21 acres · 11%
  • Electricity sub-station0.02 acres · 1%
  • Sewage and waste treatment0.02 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 68, GurugramSector 68, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20255.7 km
  • Delhi–Gurugram–SNB RRTS5.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 7
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ARCADE 68 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/698/430/2023/42. Valid to 10 Nov 2027.

The source ↗
What is the possession timeline for ARCADE 68?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 10 Nov 2027. Its registration runs to 10 Nov 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ARCADE 68?From the records · Map pin and road lines, read 6 Sep 2026

ARCADE 68 is in Sector 68, Gurugram; the site address declared to HARERA is Sector 68, Gurgaon. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Dwarka Expressway and 5.7 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ARCADE 68?From the records · HARERA, read 4 Nov 2026

ARCADE 68 is a DLF Home Developers project, registered by its company DLF HOME DEVELOPERS LIMITED.

The source ↗DLF Home Developers's projects and court record

The records

What the registers hold for ARCADE 68: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/698/430/2023/42: Registered. Valid to 10 Nov 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 185 OF 2022 is on the DTCP register, valid to 10 Nov 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 15 Nov 2022.Declared to HARERA, read 29 Oct 2026
The court record of DLF Home Developers’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
Registration no.
GGM/698/430/2023/42
Registration valid till
10 Nov 2027
Declared possession
10 Nov 2027

Declared by the promoter to HARERA

Land area
2.0 (Acre) (8,093.71 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
185 of 2022
Estimated project cost
₹77.87 crore
Cost of land
₹46.82 crore
Layout plan, declared approved (field 5a)
15 Nov 2022
Construction to start
1 Jul 2023
Completion declared for
10 Nov 2027
Statutory approvals, as declared · 2

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (11 Nov 2022)
  • II. APPROVED LAYOUT FROM DTCP — declared: already been obtained (15 Nov 2022)
On file with HARERA · 21 files

On file with HARERA (21)

Plans

Site plan

1 file
Approved Site Plan21 Nov 2022

Layout plan

1 file
Latest Layout Plan17 Nov 2022

Demarcation plan

1 file
Demarcation Plan21 Nov 2022

Building plans

1 file
Approval of Standard Design of SCO12 May 2023

Services

Service plans

2 files
Approval of Service Plan Estimates12 May 2023Service Plans on the Layout24 Nov 2022

Approvals and clearances

Completion certificate (CC)

1 file
CC uploaded9 Sept 2026

DTCP licence

2 files
Licence Copy with Land Schedule12 May 2023Licence Details7 Dec 2022

Land records

Land records

5 files
Jamabandi -2005-0612 May 2023Non Encumberance12 May 2023Collaboration Agreements12 May 2023

Money

Accounts and finance

5 files
No Due Certificate7 Dec 2022Cash Flow7 Dec 2022CA Certificate on the Application’s Figures24 Nov 2022

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit12 May 2023Promoter Affidavit7 Dec 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

185 OF 2022 · DLF Home Developers Ltd. · GURGAON-MANESAR

Licence valid to 10 Nov 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Nov 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

185 OF 2022: 7 parcels, 2 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 2 acres.

  • 132//18/13 kanal 8 marla
  • 132//18/21 kanal 16 marla
  • 132//19/1/11 kanal 5 marla
  • 132//19/1/211 marla
Show the other 3 parcels
  • 132//19/26 kanal 4 marla
  • 132//20/11 kanal
  • 132//23/1/11 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 132//18/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan21 Nov 2022

Layout plan

1 file
Latest Layout Plan17 Nov 2022

Building plans

1 file
Approval of Standard Design of SCO12 May 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2192 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF Home Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.