REACH THE BAZARIA

by Reach Promoters · Sector 68, Gurugram

Not on our price list yet

Possession 30 Sep 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 68, Gurugram0.3 km from Sohna Elevated Corridor (NH-248A), in a straight line
Registered by
REACH PROMOTERS PRIVATE LIMITEDthe company that filed it, for Reach Promoters
Timeline
  1. 6 Nov 2024Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside25,293 m² in all, by use
  • Plots for sale8,822 m² · 35%
  • Roads7,099 m² · 28%
  • Pavements6,173 m² · 24%
  • Parks and playgrounds1,979 m² · 8%
  • Parking725 m² · 3%
  • Electricity sub-station300 m² · 1%
  • Sewage and waste treatment194 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 68, GurugramSector 68, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20255.7 km
  • Delhi–Gurugram–SNB RRTS5.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is REACH THE BAZARIA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/923/655/2025/26. Valid to 30 Sep 2029.

The source ↗
What is the possession timeline for REACH THE BAZARIA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2029. Its registration runs to 30 Sep 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around REACH THE BAZARIA?From the records · Map pin and road lines, read 6 Sep 2026

REACH THE BAZARIA is in Sector 68, Gurugram; the site address declared to HARERA is Sector-68. In a straight line it is about 0.3 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Dwarka Expressway and 5.7 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building REACH THE BAZARIA?From the records · HARERA, read 4 Nov 2026

REACH THE BAZARIA is a Reach Promoters project, registered by its company REACH PROMOTERS PRIVATE LIMITED.

The source ↗Reach Promoters's projects and court record

The records

What the registers hold for REACH THE BAZARIA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/923/655/2025/26: Registered. Valid to 30 Sep 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 138 OF 2024 is on the DTCP register, valid to 4 Nov 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 6 Nov 2024.Declared to HARERA, read 29 Oct 2026
The court record of Reach Promoters’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 75 HARERA files, with the dates we read them
Registration no.
GGM/923/655/2025/26
Registration valid till
30 Sept 2029
Declared possession
30 Sept 2029

Declared by the promoter to HARERA

Land area
6.25 (Acre) (25,292.85 sq m)
FAR
1.49 proposed of 1.5 permissible
licence
138 of 2024 Dated 05/11/2024
Estimated project cost
₹183.02 crore
Cost of land
₹72.59 crore
Layout plan, declared approved (field 5a)
6 Nov 2024
Construction to start
1 Feb 2025
Completion declared for
30 Sept 2029
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (5 Nov 2024)
  • II. LAYOUT PLAN — declared: already been obtained (6 Nov 2024)
  • III. ASSURANCE OF STORM WATER — declared: already been obtained (19 Nov 2024)
  • IV. ASSURANCE OF WATER SUPPLY FOR CONSTRUCTION PURPOSE — declared: already been obtained (18 Nov 2024)
  • V. ASSURANCE FOR WATER SUPPLY OF DRINKING WATER — declared: already been obtained (21 Nov 2024)
  • VI. ELECTRICAL LOAD — declared: already been obtained (22 Nov 2024)
  • VII. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (18 Nov 2024)
  • VIII. FOREST NOC — declared: already been obtained (9 Sept 2024)
  • IX. ARCHITECT CONTROL SHEET — declared: already been obtained (28 Jan 2025)
  • X. SERVICE ESTIMATES PLAN — declared: already been obtained (3 Mar 2025)
On file with HARERA · 75 files

On file with HARERA (75)

Plans

Site plan

1 file
Approved Site Plan28 Jan 2025

Layout plan

1 file
Latest Layout Plan29 Jan 2025

Zoning plan

1 file
Zoning Plan28 Jan 2025

Demarcation plan

1 file
Demarcation Plan29 Jan 2025

Building plans

32 files
Architect Control Sheet H-10429 Jan 2025Architect Control Sheet E-10429 Jan 2025Architect Control Sheet D-10229 Jan 2025

Services

Sewerage and drainage

2 files
Assurance of Sewerage Connection28 Jan 2025Assurance for Storm Water Connection28 Jan 2025

Water supply

1 file
Assurance for Water Supply28 Jan 2025

Electricity

1 file
Electrical Load Availability28 Jan 2025

Service plans

2 files
Service Plan Estimate4 Mar 2025Service Plans on the Layout28 Jan 2025

Approvals and clearances

DTCP licence

3 files
LC-IV28 Jan 2025Licence Copy with Land Schedule28 Jan 2025LOI28 Jan 2025

Other NOCs and clearances

2 files
NCZ4 Mar 2025Forest NOC28 Jan 2025

Land records

Land records

13 files
Sale Deed Realbiz Saini Land 1 Kanal 17 Marla 25 June 20244 Mar 2025Executed Sale Deed4 Mar 2025Sale Deed - Phase II4 Mar 2025

Money

Accounts and finance

11 files
Approval for Change in Bank Account24 Feb 2026CA Certificate Net Worth4 Mar 2025Annual 2021-2228 Jan 2025

The promoter’s papers

Declarations and affidavits

3 files
Affidavit 4(2)(L)(D)4 Mar 2025Bank Undertaking4 Mar 2025The Promoter’s Declaration on Affidavit28 Jan 2025

Other filings

Other filings

1 file
HUDA Construction28 Jan 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

138 OF 2024 · Reach Promotors Pvt. Ltd · GURGAON-MANESAR

Licence valid to 4 Nov 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Jan 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

138 OF 2024: 17 parcels, 6.25 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 6.25 acres.

  • 122//17/25 kanal 11 marla
  • 122//24/27 kanal 12 marla
  • rectangle 122, kila 25/2min6 kanal 4 marla
  • rectangle 133, kila 4/35 kanal 13 marla
Show the other 13 parcels
  • 133//14/2/21 kanal 7 marla
  • 133//7/1/13 kanal 10 marla
  • rectangle 133, kila 5 min14 marla
  • rectangle 133, kila 6 min14 marla
  • rectangle 133, kila 15/1 min14 marla
  • rectangle 123, kila 21/213 marla
  • rectangle 123, kila 21/3 min5 marla
  • rectangle 123, kila 22/1 min9 marla
  • 132//20/2/15 kanal 3 marla
  • 132//20/2/21 kanal 17 marla
  • rectangle 122, kila 25/1 min19 marla
  • rectangle 133, kila 25/1 min1 kanal 12 marla
  • rectangle 133, kila 16 min7 kanal 3 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 122//17/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan28 Jan 2025

Layout plan

1 file
Latest Layout Plan29 Jan 2025

Building plans

32 files
Architect Control Sheet H-10429 Jan 2025Architect Control Sheet E-10429 Jan 2025Architect Control Sheet D-10229 Jan 2025Architect Control Sheet H-10329 Jan 2025Architect Control Sheet D-10129 Jan 2025Architect Control Sheet D-10529 Jan 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (75 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3323 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Reach Promoters

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.