Skip to content

Assotech Blith

by Assotech Moonshine Urban Developers · Sector 99, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 99, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
Home types
1, 2 and 3 BHK
Carpet area
795–1,643 sq ft
In m²about 74–153 m², as declared
Registered
23 Aug 2017
Registered by
ASSOTECH MOONSHINE URBAN DEVELOPERS PVT LTDthe company that filed it, for Assotech Moonshine Urban Developers
Timeline
  1. 1 May 2012Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 23 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Apr 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  4. 20 Feb 2027Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

560homes, 795 to 1,643 sq ft of carpet area
  • Under 1,000 sq ft795–994 sq ft400
  • 1,000–1,500 sq ft1,381 sq ft92
  • 1,500–2,000 sq ft1,643 sq ft68

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit and 111 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioning1.5 TONS in bed room and living room
  • KitchenSEMI modular kitchen
  • Kitchen appliancesChimney and hob
  • LiftsOne service lift and 1 passenger lift in all tower
  • WardrobesWardrobes
  • FloorsVitrified tile and wooden flooring in master bed
  • WallsAcrylic emulsion paint
  • BathroomsCP fitting and chinaware along with gyser and exhaust fan

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 99, GurugramSector 99, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS5.6 km
  • Sohna Elevated Corridor (NH-248A)7.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Assotech Blith registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 83 OF 2017, registered on 23 Aug 2017. Valid to 20 Feb 2027.

The source ↗
How is the connectivity around Assotech Blith?From the records · Map pin and road lines, read 6 Sep 2026

Assotech Blith is in Sector 99, Gurugram; the site address declared to HARERA is Sector 99, Village Dhankot Tehsil Gurgaon. In a straight line it is about 0.5 km from Dwarka Expressway, 5.6 km from Delhi–Gurugram–SNB RRTS and 7.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Assotech Blith?From the records · HARERA, read 4 Nov 2026

Assotech Blith is a Assotech Moonshine Urban Developers project, registered by its company ASSOTECH MOONSHINE URBAN DEVELOPERS PVT LTD.

The source ↗Assotech Moonshine Urban Developers's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Assotech Blith: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 83 OF 2017: Registered. Valid to 20 Feb 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 95 OF 2011 is on the DTCP register: Licence lapsed; the register prints its validity to 27 Oct 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 1 May 2012, building plans 30 Apr 2022.Declared to HARERA, read 29 Oct 2026
The court record of Assotech Moonshine Urban Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 95 OF 2011 lapsed

    Named in this project’s application. Valid to 27 Oct 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration ends soon

    Valid to 20 Feb 2027. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
Registration no.
83 OF 2017
Registration date
23 Aug 2017
Registration valid till
20 Feb 2027

Declared by the promoter to HARERA

Land area
12.062 (Acre) (48,813.18 sq m)
FAR
the application prints 174.98, which is not a ratio
licence
95 of 2011 Dated 28.10.2011 vide Endst. No. - LC - 1245-JE(VA)-2011/16185
Estimated project cost
₹608.87 crore
Cost of land
₹93.60 crore
Layout plan, declared approved (field 5a)
1 May 2012
Building plans, declared approved
30 Apr 2022
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK · 224 units · 73.86 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK · 176 units · 92.3 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3+1 BHK · 92 units · 128.26 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4+1 BHK · 68 units · 152.64 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type VILLA · 23 units
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP · 8 units · 15.125 sq m carpet · under 25 m²: a shop or service unit the form does not label
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP · 1 unit · 25.187 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP · 1 unit · 4.43 sq m carpet · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENSE NO 95/2011 — declared: already been obtained (28 Oct 2011)
  • II. BUILDING PLAN APPROVAL — declared: already been obtained (1 May 2012)
  • III. FIRE FIGHTING SCHEME APPROVAL — declared: already been obtained (21 Sept 2012)
  • IV. AAI NOC — declared: already been obtained (13 Mar 2012)
  • V. ENVIRONMENTAL CLEARANCE — declared: already been obtained (27 Dec 2012)
  • VI. ARAVALLI CLEARANCE — declared: already been obtained (10 Feb 2012)
On file with HARERA · 21 files

On file with HARERA (21)

Plans

Site plan

1 file
Approved Site Plan29 Jan 2020

Layout plan

1 file
Latest Layout Plan20 Feb 2020

Zoning plan

1 file
Zoning Plan21 Jan 2020

Demarcation plan

1 file
Demarcation Plan29 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set17 Jan 2020

Floor plans

4 files
Floor Plan 4+1 Bhk20 Feb 2020Floor Plan5 Feb 2020Floor Plan 3+1 Bhk5 Feb 2020Floor Plan 3BHK5 Feb 2020

Services

Service plans

1 file
Service Plans on the Layout29 Jan 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule5 Feb 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration29 Jan 2020

Money

Accounts and finance

4 files
Approval for Change of Bank Account22 Aug 2025Non-Default Certificate from a CA5 Feb 2020CA Certificate on the Application’s Figures29 Jan 2020Cash Flow Statement14 Jan 2020

Timeline and progress

Construction schedule

1 file
Construction Schedule20 Feb 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit29 Jan 2020

Company papers

1 file
Company Director Information1 May 2024

HARERA’s orders

HARERA’s orders

1 file
Extension No. 06 of 2024 dated 20.05.20245 Aug 2024

Other filings

Other filings

1 file
PROJECT CONTINUATION- RC/REP/HARERA/GGM/83 of 2017/7(3)/94/2025/36 DATED 10.12.202519 Dec 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

95 OF 2011 · Uppal Housing · GURGAON-MANESAR

Licence valid to 27 Oct 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

95 OF 2011: 19 parcels, 12.0625 acres in all, in Dhankot (hadbast 49), tehsil Kadipur.

The licence register prints the same licensed area, 12.06 acres.

  • 122//18 kanal
  • 122//2/12 kanal 4 marla
  • 121//3/2/22 marla
  • 121//4/1/25 kanal 16 marla
Show the other 15 parcels
  • 121//4/21 kanal 4 marla
  • 121//58 kanal
  • 117//175 kanal
  • 117//187 kanal 10 marla
  • 117//198 kanal
  • 117//20/13 kanal 4 marla
  • 117//20/24 kanal 12 marla
  • 117//218 kanal
  • 117//228 kanal
  • 117//244 kanal 12 marla
  • rectangle 117, kila 238 kanal
  • 118//16/22 kanal 13 marla
  • 118//24/23 kanal 16 marla
  • 118//25/14 kanal 1 marla
  • 118//25/23 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhankot (hadbast 49), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 122//1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,000 per sq ft

Sector 99, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan29 Jan 2020

Layout plan

1 file
Latest Layout Plan20 Feb 2020

Building plans

1 file
Approved Building Plans, Full Set17 Jan 2020

Floor plans

4 files
Floor Plan 4+1 Bhk20 Feb 2020Floor Plan5 Feb 2020Floor Plan 3+1 Bhk5 Feb 2020Floor Plan 3BHK5 Feb 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1038 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Assotech Moonshine Urban Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.