Assotech Blith
by Assotech Moonshine Urban Developers · Sector 99, Gurugram
Not on our price list yet
About this project
Key facts
- Location
- Sector 99, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
- Registered by
- ASSOTECH MOONSHINE URBAN DEVELOPERS PVT LTDthe company that filed it, for Assotech Moonshine Urban Developers
- 1 May 2012Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 23 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
- 30 Apr 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
- 20 Feb 2027Registration valid toHARERA, read 4 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft795–994 sq ft400
- 1,000–1,500 sq ft1,381 sq ft92
- 1,500–2,000 sq ft1,643 sq ft68
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit and 111 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Air-conditioning1.5 TONS in bed room and living room
- KitchenSEMI modular kitchen
- Kitchen appliancesChimney and hob
- LiftsOne service lift and 1 passenger lift in all tower
- WardrobesWardrobes
- FloorsVitrified tile and wooden flooring in master bed
- WallsAcrylic emulsion paint
- BathroomsCP fitting and chinaware along with gyser and exhaust fan
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.5 km
- Delhi–Gurugram–SNB RRTS5.6 km
- Sohna Elevated Corridor (NH-248A)7.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Raheja Developers | Same sector | — | — | 27 Aug 2022 |
Project Phase-1No photo on file yet | Satya Townships | Same sector | — | — | — |
SOVEREIGN PARK (PHASE-II)No photo on file yet | Vatika Sovereign Park | Same sector | — | — | — |
No photo of the project on file yet | Raheja Developers | Same sector | — | — | 27 Aug 2022 |
| Pareena Infrastructures | Same sector | — | — | 30 Jun 2022 | |
HabitatNo photo on file yet | Prime Infradevelopers | Same sector | — | — | 30 Nov 2019 |
Cosmos Express 99/Cascade GardensNo photo on file yet | Shvinandan Buildtech | Same sector | — | — | — |
THE ELITE RESIDENCES/ EXPRESS HEIGHTSNo photo on file yet | Shivanandani Buildtech | Same sector | — | — | 14 Sep 2020 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Assotech Blith registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 83 OF 2017, registered on 23 Aug 2017. Valid to 20 Feb 2027.
The source ↗How is the connectivity around Assotech Blith?From the records · Map pin and road lines, read 6 Sep 2026
Assotech Blith is in Sector 99, Gurugram; the site address declared to HARERA is Sector 99, Village Dhankot Tehsil Gurgaon. In a straight line it is about 0.5 km from Dwarka Expressway, 5.6 km from Delhi–Gurugram–SNB RRTS and 7.3 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Assotech Blith?From the records · HARERA, read 4 Nov 2026
Assotech Blith is a Assotech Moonshine Urban Developers project, registered by its company ASSOTECH MOONSHINE URBAN DEVELOPERS PVT LTD.
The source ↗Assotech Moonshine Urban Developers's projects and court recordWhat protections do I have as a buyer?General guidance
Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.
The records
What the registers hold for Assotech Blith: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 83 OF 2017: Registered. Valid to 20 Feb 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 95 OF 2011 is on the DTCP register: Licence lapsed; the register prints its validity to 27 Oct 2024.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 1 May 2012, building plans 30 Apr 2022.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
- Registration no.
- 83 OF 2017
- Registration date
- 23 Aug 2017
- Registration valid till
- 20 Feb 2027
Declared by the promoter to HARERA
- Land area
- 12.062 (Acre) (48,813.18 sq m)
- FAR
- the application prints 174.98, which is not a ratio
- licence
- 95 of 2011 Dated 28.10.2011 vide Endst. No. - LC - 1245-JE(VA)-2011/16185
- Estimated project cost
- ₹608.87 crore
- Cost of land
- ₹93.60 crore
- Layout plan, declared approved (field 5a)
- 1 May 2012
- Building plans, declared approved
- 30 Apr 2022
Declared inventory · 9 types
Declared inventory — 9 types declared, first 8 shown
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK · 224 units · 73.86 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK · 176 units · 92.3 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3+1 BHK · 92 units · 128.26 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 4+1 BHK · 68 units · 152.64 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type VILLA · 23 units
- APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP · 8 units · 15.125 sq m carpet · under 25 m²: a shop or service unit the form does not label
- APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP · 1 unit · 25.187 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP · 1 unit · 4.43 sq m carpet · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. LICENSE NO 95/2011 — declared: already been obtained (28 Oct 2011)
- II. BUILDING PLAN APPROVAL — declared: already been obtained (1 May 2012)
- III. FIRE FIGHTING SCHEME APPROVAL — declared: already been obtained (21 Sept 2012)
- IV. AAI NOC — declared: already been obtained (13 Mar 2012)
- V. ENVIRONMENTAL CLEARANCE — declared: already been obtained (27 Dec 2012)
- VI. ARAVALLI CLEARANCE — declared: already been obtained (10 Feb 2012)
On file with HARERA · 21 files
On file with HARERA (21)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileFloor plans
4 filesServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
4 filesTimeline and progress
Construction schedule
1 fileThe promoter’s papers
Declarations and affidavits
1 fileCompany papers
1 fileHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
95 OF 2011 · Uppal Housing · GURGAON-MANESAR
Licence valid to 27 Oct 2024
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
95 OF 2011: 19 parcels, 12.0625 acres in all, in Dhankot (hadbast 49), tehsil Kadipur.
The licence register prints the same licensed area, 12.06 acres.
- 122//18 kanal
- 122//2/12 kanal 4 marla
- 121//3/2/22 marla
- 121//4/1/25 kanal 16 marla
Show the other 15 parcels
- 121//4/21 kanal 4 marla
- 121//58 kanal
- 117//175 kanal
- 117//187 kanal 10 marla
- 117//198 kanal
- 117//20/13 kanal 4 marla
- 117//20/24 kanal 12 marla
- 117//218 kanal
- 117//228 kanal
- 117//244 kanal 12 marla
- rectangle 117, kila 238 kanal
- 118//16/22 kanal 13 marla
- 118//24/23 kanal 16 marla
- 118//25/14 kanal 1 marla
- 118//25/23 kanal 16 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Dhankot (hadbast 49), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 122//1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,000 per sq ft
Sector 99, collector rates effective 1 Apr 2026, Kadipur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileFloor plans
4 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1038 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Assotech Moonshine Urban Developers
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.