by Pareena Infrastructures · Sector 99, Gurugram

Not on our price list yet

Possession 30 Jun 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 99, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
Home types
2, 3 and 4 BHK
Carpet area
916–1,465 sq ft
In m²about 85–136 m², as declared
Registered
16 Oct 2020
Registered by
PAREENA INFRASTRUCTURES PVT. LTD.the company that filed it, for Pareena Infrastructures
Timeline
  1. 25 Jul 2013Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 16 Oct 2020Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Jun 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 10 Mar 2029Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

544homes, 916 to 1,465 sq ft of carpet area
  • Under 1,000 sq ft916 sq ft158
  • 1,000–1,500 sq ft1,220–1,465 sq ft386

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside10.587 acres in all, by use
  • Roads2.524 acres · 24%
  • Apartment buildings2.015 acres · 19%
  • Parks and playgrounds1.684 acres · 16%
  • Other usesas the form names them: Rain, Ramp, Area under road widening1.405 acres · 13%
  • Pavements1.082 acres · 10%
  • Parking0.961 acres · 9%
  • Green belts0.505 acres · 5%
  • Club house0.112 acres · 1%
  • Electricity sub-station0.103 acres · under 1%
  • Sewage and waste treatment0.081 acres · under 1%
  • School0.063 acres · under 1%
  • Shops and offices0.053 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV AIR conditioning in tower-a & B
  • KitchenGranite counter, ceramic tiles upto 2 FT above counter and REST OBD
  • Kitchen appliancesNot providing
  • LiftsPassenger & service lifts in each tower
  • WardrobesNot providing
  • FloorsVitrified tiles
  • WallsOil bound distemper
  • BathroomsCP fitting & china WARE

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 99, GurugramSector 99, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS5.6 km
  • Sohna Elevated Corridor (NH-248A)7.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Coban Residences registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/419/151/2020/35, registered on 16 Oct 2020. Valid to 10 Mar 2029.

The source ↗
What is the possession timeline for Coban Residences?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2022. Its registration runs to 10 Mar 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Coban Residences?From the records · Map pin and road lines, read 6 Sep 2026

Coban Residences is in Sector 99, Gurugram; the site address declared to HARERA is Garhi Harsaru Road Village Gopalpur, Sector 99a, Gurugram, Haryana. In a straight line it is about 0.5 km from Dwarka Expressway, 5.6 km from Delhi–Gurugram–SNB RRTS and 7.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Coban Residences?From the records · HARERA, read 4 Nov 2026

Coban Residences is a Pareena Infrastructures project, registered by its company PAREENA INFRASTRUCTURES PVT. LTD..

The source ↗Pareena Infrastructures's projects and court record

The records

What the registers hold for Coban Residences: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/419/151/2020/35: Registered. Valid to 10 Mar 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 10 OF 2013 is on the DTCP register, valid to 11 Mar 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 25 Jul 2013, building plans 25 Jul 2013.Declared to HARERA, read 29 Oct 2026
The court record of Pareena Infrastructures’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 63 HARERA files, with the dates we read them
Registration no.
GGM/419/151/2020/35
Registration date
16 Oct 2020
Registration valid till
10 Mar 2029
Declared possession
30 Jun 2022

Declared by the promoter to HARERA

Land area
10.5875 (Acre) (42,846.09 sq m)
FAR
the application prints 174.97, which is not a ratio
licence
License no. 10 of 2013 Dated 12-03-2013 LC-2753-JE(VA)-2013/33305 Dated 12-03-2013
Estimated project cost
₹471.43 crore
Cost of land
₹104.67 crore
Layout plan, declared approved (field 5a)
25 Jul 2013
Building plans, declared approved
25 Jul 2013
Completion declared for
30 Jun 2022
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK + S.P [ TOWER A[1]] · 38 units · 136.12 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+ UTILITY [ TOWER A[1]] · 40 units · 113.34 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+ UTILITY [ TOWER C[T-2]] · 78 units · 113.34 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+ UTILITY TOWER D[T-3]] · 78 units · 113.34 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+ UTILITY TOWER E[T-4]] · 78 units · 113.34 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK+ S.P. TOWER B[T-5]] · 36 units · 136.12 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK+ UTILITY TOWER B[T-5]] · 38 units · 113.34 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK+STUDY TOWER F[6]] · 79 units · 85.1 sq m carpet · one flat
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. BUILDING APPROVAL PLAN — declared: already been obtained (25 Jul 2013)
  • II. HEIGHT CLEARANCE — declared: already been obtained (20 Jan 2015)
  • III. ARAVALI NOC — declared: already been obtained (10 Jul 2013)
  • IV. FOREST NOC — declared: already been obtained (8 Mar 2013)
On file with HARERA · 63 files

On file with HARERA (63)

Plans

Site plan

4 files
Site Plan Calculation16 Oct 2020Site Plan Public Health16 Oct 2020Site Plan16 Oct 2020Approved Site Plan20 Jan 2020

Layout plan

1 file
Latest Layout Plan20 Jan 2020

Zoning plan

2 files
Revised Zoning16 Oct 2020Zoning Plan16 Oct 2020

Building plans

12 files
BR-III16 Oct 2020Tower -F Elevation16 Oct 2020Tower C,d,e Section16 Oct 2020

Floor plans

10 files
Basement16 Oct 2020Basement Area16 Oct 2020EWS16 Oct 2020

Services

Sewerage and drainage

2 files
Sewage Line16 Oct 2020Storm Line16 Oct 2020

Water supply

1 file
Water Supply Line16 Oct 2020

Roads

1 file
External Light & Road Layout16 Oct 2020

Approvals and clearances

Occupation certificate (OC)

2 files
Oc uploaded for Tower-A,C,D,F,EWS Block-I, II8 Aug 2023OC uploaded8 Aug 2023

DTCP licence

4 files
Coban License Copy16 Oct 2020Renewal of License and COD16 Oct 2020Monex 99A LOI, License16 Oct 2020Licence Copy with Land Schedule20 Jan 2020

Environment clearance

1 file
Monex Environmental Clearance16 Oct 2020

Fire safety

2 files
Fire Scheme Approval16 Oct 2020Fire Fightning16 Oct 2020

Other NOCs and clearances

6 files
Forest NOC16 Oct 2020Mining Permission16 Oct 2020Pollution NOC16 Oct 2020

Land records

Land records

4 files
Sale Deed 116 Oct 2020Shijra Map16 Oct 2020Sale Deed 216 Oct 2020Revenue Record Entry of Licence and Collaboration16 Oct 2020

Money

Accounts and finance

2 files
Cash Flow Statement20 Jan 2020Non-Default Certificate from a CA20 Jan 2020

The promoter’s papers

Declarations and affidavits

2 files
Rep II14 Oct 2020The Promoter’s Declaration on Affidavit20 Jan 2020

HARERA’s orders

HARERA’s orders

1 file
Extension No. 26 of 2024 dated 11.12.20248 Jan 2025

Other filings

Other filings

6 files
PROJECT CONTINUATION- RC/REP/HARERA/GGM/35 of 2020/7(3)/65/2025/07 DATED 28.03.20254 Apr 2025Community Building16 Oct 2020Main Gate16 Oct 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

10 OF 2013 · Monex Infrastructure Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 11 Mar 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

10 OF 2013: 14 parcels, 10.5875 acres in all, in Gopalpur (hadbast 47), tehsil Harsaru.

The licence register prints the same licensed area, 10.59 acres.

  • 49//118 kanal
  • 49//12/116 marla
  • 49//187 kanal 9 marla
  • 49//198 kanal
Show the other 10 parcels
  • 49//208 kanal
  • 49//21/11 kanal 8 marla
  • 49//21/26 kanal 12 marla
  • 49//22/15 kanal 16 marla
  • 30//158 kanal
  • 30//168 kanal
  • 30//178 kanal
  • 30//188 kanal
  • 30//23/22 kanal 9 marla
  • 50//14 kanal 4 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gopalpur (hadbast 47), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 49//11.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,000 per sq ft

Sector 99, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Site Plan Calculation16 Oct 2020Site Plan Public Health16 Oct 2020Site Plan16 Oct 2020Approved Site Plan20 Jan 2020

Layout plan

1 file
Latest Layout Plan20 Jan 2020

Building plans

12 files
BR-III16 Oct 2020Tower -F Elevation16 Oct 2020Tower C,d,e Section16 Oct 2020Revised Briii16 Oct 2020School Elevation16 Oct 2020Tower -B Section Plan16 Oct 2020

Floor plans

10 files
Basement16 Oct 2020Basement Area16 Oct 2020EWS16 Oct 2020Tower A&B Area Details16 Oct 2020Tower -B Floor Plan16 Oct 2020Tower C,d,e Area16 Oct 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (63 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1212 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pareena Infrastructures

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.