SOVEREIGN PARK (PHASE-II)

by Vatika Sovereign Park · Sector 99, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 99, Gurugram0.5 km from Dwarka Expressway, in a straight line
Registered by
VATIKA SOVEREIGN PARK PVT. LTDthe company that filed it, for Vatika Sovereign Park
Timeline
  1. 22 Oct 2014Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Jul 2027Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside19,562 m² in all, by use
  • Roads10,688 m² · 55%
  • Other usesas the form names them: Water supply, Storm water drains, STP (sewage treatment plant), UGT (underground water tank), Rain water harvesting, Street lighting and electrification, Renewable energy system, Security and fire fighting services, Lift3,511 m² · 18%
  • Apartment buildings3,186 m² · 16%
  • Parks and playgrounds884 m² · 5%
  • Parking563 m² · 3%
  • Sewage and waste treatment486 m² · 2%
  • Electricity sub-station245 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenWall tile of approved make in cladding /DADO over on 12-15MM thick cement mortar 1:3 somany, BIB COCK, pillar COCK, ablution TAP along with necessary angle valves ETC. of standard makes and brands. essco 5.8 sink 18" X 14"X 8" bowl neelkanth
  • Kitchen appliancesCOOK top and chimney KAFF. faber
  • LiftsPassanger elevator, capacity : 15 passenger, 1020KG, KONE
  • FloorsLiving/drawing, bedroom high quality, abrasion resistant MATT finished vitreous, master toilet MATT finished/antiskid ceramic tiles somany, room/utility room MATT finished ceramic tiles somany
  • WallsInternal wall acrylic emulsion paint berger external wall external grade anti fungal / anti algal paint berger
  • BathroomsWASH basin, european water closet (EWC) of standard makes hindware pillar COCK, ablution TAP along with necessary angle valves ETC. of standard makes and brands. essco
  • Windows6MM clear glass with frame saint gobain
  • Main door35MM flush door with both side 0.8MM thick laminate hard wood

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 99, GurugramSector 99, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS5.6 km
  • Sohna Elevated Corridor (NH-248A)7.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SOVEREIGN PARK (PHASE-II) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/758/490/2023/102. Valid to 10 Jul 2027.

The source ↗
How is the connectivity around SOVEREIGN PARK (PHASE-II)?From the records · Map pin and road lines, read 6 Sep 2026

SOVEREIGN PARK (PHASE-II) is in Sector 99, Gurugram; the site address declared to HARERA is Sector-99, Village-Kherki Majra Dhankot. In a straight line it is about 0.5 km from Dwarka Expressway, 5.6 km from Delhi–Gurugram–SNB RRTS and 7.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SOVEREIGN PARK (PHASE-II)?From the records · HARERA, read 4 Nov 2026

SOVEREIGN PARK (PHASE-II) is a Vatika Sovereign Park project, registered by its company VATIKA SOVEREIGN PARK PVT. LTD.

The source ↗Vatika Sovereign Park's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for SOVEREIGN PARK (PHASE-II): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/758/490/2023/102: Registered. Valid to 10 Jul 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 22 Oct 2014, building plans 22 Oct 2014.Declared to HARERA, read 29 Oct 2026
The court record of Vatika Sovereign Park’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 89 HARERA files, with the dates we read them
Registration no.
GGM/758/490/2023/102
Registration valid till
10 Jul 2027

Declared by the promoter to HARERA

Land area
4.8338 (Acre) (19,561.69 sq m)
FAR
the application prints 174.98, which is not a ratio
licence
1) License No. 119.of 2012 dated 06-12-2012. 2) License No. 65.of 2013 dated 20-07-2013.
Estimated project cost
₹410.43 crore
Cost of land
₹47.81 crore
Layout plan, declared approved (field 5a)
22 Oct 2014
Building plans, declared approved
22 Oct 2014
Declared inventory · 13 types

Declared inventory — 13 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BR+/1595.66 · 12 units · 1,595.66 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type EWS+/202.15 · 31 units · 202.15 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type EWS+/209.25 · 24 units · 209.25 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BR+/1595.98 · 20 units · 1,595.98 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BR+/1613.63 · 8 units · 1,613.63 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BR+/1710.94 · 1 unit · 1,710.94 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BR+/1712.55 · 28 units · 1,712.55 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3BR+/1721.49 · 29 units · 1,721.49 sq m carpet
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. LAYOUT PLAN — declared: already been obtained (22 Oct 2014)
  • II. ZONING PLAN — declared: already been obtained (22 Jul 2013)
  • III. BUILDING PLAN (BR=III) — declared: already been obtained (22 Oct 2014)
  • IV. SITE PLAN — declared: already been obtained (22 Oct 2014)
  • V. FLOOR PLAN — declared: already been obtained (22 Oct 2014)
  • VI. APARTMENT PLAN — declared: already been obtained (22 Oct 2014)
  • VII. ELEVATION PLAN — declared: already been obtained (22 Oct 2014)
On file with HARERA · 89 files

On file with HARERA (89)

Plans

Site plan

6 files
Site Plan Sovereign Park (St-01)5 Feb 2024Site Plan Sovereign Park (St-02)5 Feb 2024Site Plan Sovereign Park (St-03)5 Feb 2024

Layout plan

1 file
Latest Layout Plan2 Aug 2023

Zoning plan

1 file
Zoning Plan2 Aug 2023

Demarcation plan

1 file
Demarcation Plan5 Feb 2024

Building plans

32 files
3rd to 21ST, Terrace & Roof Plan Floor (A,b & C)5 Feb 202411TH,12TH,TERRACE Floor & Roof Plan (Block-E,g & L)5 Feb 2024All Elevation & Section-Xx, Yy (Block-D)5 Feb 2024

Floor plans

14 files
Area Calculation (Tower-A,b,c & Community Building-1)5 Feb 2024Area Calculation of All Floors (Block-D)5 Feb 2024Area Calculation of All Floors (Block-E,g & L)5 Feb 2024

Services

Sewerage and drainage

4 files
Assurance for Sewerage5 Feb 2024Assurance for Storm Water5 Feb 2024Sewerage Plan5 Feb 2024Storm Water Scheme5 Feb 2024

Water supply

4 files
Assurance for Water Supply5 Feb 2024Flushing Water Supply Plan5 Feb 2024Water Supply Plan5 Feb 2024Irrigation Line5 Feb 2024

Electricity

1 file
Assurance of Supply of Power Load5 Feb 2024

Roads

1 file
Roads and Pavement Plan5 Feb 2024

Service plans

3 files
Service Plans and Estimates Approval5 Feb 2024Service Plans Estimates5 Feb 2024Service Plans on the Layout14 Aug 2023

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule5 Feb 2024LC-IV & LC-IV (A)5 Feb 2024LOI5 Feb 2024

Environment clearance

1 file
Environment Clearance5 Feb 2024

Fire safety

2 files
External Fire Line5 Feb 2024Fire Scheme Approval5 Feb 2024

Other NOCs and clearances

3 files
Airport Height Clearance5 Feb 2024Forest NOC5 Feb 2024HUDA Construction Water NOC5 Feb 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration5 Feb 2024

Money

Accounts and finance

5 files
Cash Flow Statement5 Feb 2024CA Certificate for Cost Incurred Up to the Date of Exten. Reg5 Feb 2024CA Certificate for Financial & Inventory Details5 Feb 2024

The promoter’s papers

Declarations and affidavits

3 files
The Promoter’s Declaration on Affidavit24 May 2024Affidavit by the Promoter W.r.t. Accounts5 Feb 2024Bank Undertaking5 Feb 2024

Other filings

Other filings

3 files
Schematic Diagram (Block-A,b & C)5 Feb 2024Schematic Diagram (Block-D,f,h,j,k & M)5 Feb 2024Schematic Diagram (Block-E,g & L)5 Feb 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared 1) License No. 119.of 2012 dated 06-12-2012. 2) License No. 65.of 2013 dated 20-07-2013.. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 8 Sept 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

6 files
Site Plan Sovereign Park (St-01)5 Feb 2024Site Plan Sovereign Park (St-02)5 Feb 2024Site Plan Sovereign Park (St-03)5 Feb 2024Site Plan Sovereign Park (St-04)5 Feb 2024Site Plan Sovereign Park (St-05)5 Feb 2024Approved Site Plan2 Aug 2023

Layout plan

1 file
Latest Layout Plan2 Aug 2023

Building plans

32 files
3rd to 21ST, Terrace & Roof Plan Floor (A,b & C)5 Feb 202411TH,12TH,TERRACE Floor & Roof Plan (Block-E,g & L)5 Feb 2024All Elevation & Section-Xx, Yy (Block-D)5 Feb 2024Approved Building Plans, Full Set5 Feb 2024Elevation-1 & 2 (Block-E,g & L)5 Feb 2024Elevation-1 & 2 (Tower-A & C)5 Feb 2024

Floor plans

14 files
Area Calculation (Tower-A,b,c & Community Building-1)5 Feb 2024Area Calculation of All Floors (Block-D)5 Feb 2024Area Calculation of All Floors (Block-E,g & L)5 Feb 2024Area Calculation of All Floors (Block-F)5 Feb 2024Area Calculation of All Floors (Block-H)5 Feb 2024Area Calculation of All Floors (Block-J & Community Building-2)5 Feb 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (89 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2547 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Vatika Sovereign Park

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.