AVENUE 86

by GLS Infraprojects · Sector 86, Gurugram

Not on our price list yet

Possession 11 Jul 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 86, Gurugram2.7 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
529–1,377 sq ft
In m²about 49–128 m², as declared
Registered by
GLS INFRAPROJECTS PVT. LTD.the company that filed it, for GLS Infraprojects

Homes on offer

The homes the developer declared to HARERA, by size.

924homes, 529 to 1,377 sq ft of carpet area
  • Under 1,000 sq ft529–885 sq ft900
  • 1,000–1,500 sq ft1,377 sq ft24

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6.4 acres in all, by use
  • Parking2.172 acres · 34%
  • Apartment buildings1.877 acres · 29%
  • Parks and playgrounds1.212 acres · 19%
  • Roads0.606 acres · 9%
  • Shops and offices0.328 acres · 5%
  • Electricity sub-station0.104 acres · 2%
  • Other usesas the form names them: Aanganwadi, Community0.096 acres · 1%
  • Sewage and waste treatment0.005 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenOil bound distemper
  • LiftsAs per NBCC CODE
  • FloorsVitrified tiles
  • WallsOil bound distemper
  • BathroomsISI marked CP fitting, W.C. & washbasin
  • WindowsAluminium/UPVC section with 4MM thick glass
  • Main doorFlush doors (painted)
  • Electrical fittingsISI marked switches & sockets

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 86, GurugramSector 86, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS2.7 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.2 km
  • Sohna Elevated Corridor (NH-248A)9.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 5
  • Registered, no OC or CC yet: 2
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is AVENUE 86 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/498/230/2021/66. The register’s record shows an end date of 11 Jul 2026. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for AVENUE 86?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 11 Jul 2026. Its registration runs to 11 Jul 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around AVENUE 86?From the records · Map pin and road lines, read 6 Sep 2026

AVENUE 86 is in Sector 86, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Badha, Sector-86. In a straight line it is about 2.7 km from Delhi–Gurugram–SNB RRTS, 3.2 km from Dwarka Expressway and 9.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building AVENUE 86?From the records · HARERA, read 4 Nov 2026

AVENUE 86 is a GLS Infraprojects project, registered by its company GLS INFRAPROJECTS PVT. LTD..

The source ↗GLS Infraprojects's projects and court record

The records

What the registers hold for AVENUE 86: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/498/230/2021/66: Registration lapsed. The register’s record shows an end date of 11 Jul 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 35 OF 2021 is on the DTCP register: Licence lapsed; the register prints its validity to 11 Jul 2026.DTCP, read 3 Nov 2026
The court record of GLS Infraprojects’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 35 OF 2021 lapsed

    Named in this project’s application. Valid to 11 Jul 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 11 Jul 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 51 HARERA files, with the dates we read them
Registration no.
GGM/498/230/2021/66
Registration valid till
11 Jul 2026
Declared possession
11 Jul 2026

Declared by the promoter to HARERA

Land area
6.40 (Acre) (25,899.88 sq m)
FAR
2.37 proposed of 2.37 permissible
licence
35 of 2021 dated12.07.2021
Estimated project cost
₹200.58 crore
Cost of land
₹12.80 crore
Construction to start
1 Jan 2022
Completion declared for
11 Jul 2026
Declared inventory · 12 types

Declared inventory — 12 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 312 units · 72.73 sq m carpet · 8 towers · one flat
  • Apartment/Shops/Other Buildings · 312 units · 71.53 sq m carpet · 8 towers · one flat
  • Apartment/Shops/Other Buildings · 24 units · 127.95 sq m carpet · 8 towers · one flat
  • Apartment/Shops/Other Buildings · 24 units · 82.22 sq m carpet · 8 towers · one flat
  • Apartment/Shops/Other Buildings · 78 units · 51.12 sq m carpet · 8 towers · one flat
  • Apartment/Shops/Other Buildings · 26 units · 51.12 sq m carpet · 8 towers · one flat
  • Apartment/Shops/Other Buildings · 52 units · 49.39 sq m carpet · 8 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 66.22 sq m carpet · 8 towers · one flat
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. STP WATER NOC FROM ADMINISTRATOR — declared: already been obtained (11 Aug 2021)
  • II. BUILDING PLAN BR-III — declared: already been obtained (20 Sept 2021)
  • III. SEWERAGE ASSURANCE — declared: already been obtained (16 Aug 2021)
  • IV. LICENSE NO 35 OF 2021 — declared: already been obtained (12 Jul 2021)
  • V. ARAWALI NOC — declared: already been obtained (10 Sept 2021)
  • VI. FOREST NOC — declared: already been obtained (26 Mar 2021)
  • VII. LOI — declared: already been obtained (5 Apr 2021)
  • VIII. POWER LOAD ASSURANCE — declared: already been obtained (17 Sept 2021)
  • IX. WATER ASSURANCE — declared: already been obtained (20 Aug 2021)
  • X. ENVIRONMENTAL CLEARANCE — declared: applied for but yet to receive (28 Aug 2021)
  • XI. FIRE SCHEME — declared: applied for but yet to receive (20 Sept 2021)
On file with HARERA · 51 files

On file with HARERA (51)

Plans

Site plan

2 files
Site Plan Superimposed23 Sept 2021Approved Site Plan22 Sept 2021

Layout plan

1 file
Latest Layout Plan22 Sept 2021

Zoning plan

1 file
Zoning Plan22 Sept 2021

Demarcation plan

1 file
Demarcation Plan22 Sept 2021

Building plans

10 files
Tower 1, 2, 3, 6, 7, 8 Elevation22 Sept 2021Tower 1, 2, 3, 6, 7, 8 Section22 Sept 2021Tower 1, 2, 3, 6, 7, 8 Typical & Terrace22 Sept 2021

Floor plans

4 files
Tower 1, 2, 3, 6, 7, 8 Ground & 1st22 Sept 2021Tower 4 Ground & 1st22 Sept 2021Tower 5 Ground & 1st22 Sept 2021Tower 5 Typical22 Sept 2021

Services

Sewerage and drainage

3 files
Sewerage Layout22 Sept 2021Storm Water Layout22 Sept 2021Sewerage Assurance22 Sept 2021

Water supply

2 files
Water Supply Layout22 Sept 2021Water Assurance22 Sept 2021

Electricity

2 files
Electrical Layout22 Sept 2021Power Load Assurance22 Sept 2021

Roads

1 file
Road Layout22 Sept 2021

Landscape and green areas

1 file
Parking & Green Area22 Sept 2021

Service plans

1 file
Service Plans on the Layout22 Sept 2021

Approvals and clearances

DTCP licence

3 files
LOI23 Sept 2021LC IV & IV A23 Sept 2021Licence Copy with Land Schedule22 Sept 2021

Environment clearance

1 file
EC Acknowledgement23 Sept 2021

Fire safety

2 files
Fire Scheme Acknowledgement23 Sept 2021Fire Fighting Layout22 Sept 2021

Other NOCs and clearances

3 files
Arawali NOC22 Sept 2021STP Water NOC22 Sept 2021Forest NOC22 Sept 2021

Land records

Land records

6 files
Aks Sizra23 Sept 2021Collaboration Agreement23 Sept 2021SPA23 Sept 2021

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures22 Sept 2021Non-Default Certificate from a CA22 Sept 2021Cash Flow Statement22 Sept 2021

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit22 Sept 2021Bank Undertaking22 Sept 2021

Other filings

Other filings

2 files
Igbc Certificate23 Sept 2021Aanganwadi Community Lt & Ugt22 Sept 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

35 OF 2021 · GLS Infraprojects Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 11 Jul 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Sept 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

35 OF 2021: 8 parcels, 6.4 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 6.4 acres.

  • 36//5/2/15 kanal
  • 37//18 kanal
  • 37//10/17 kanal 1 marla
  • 37//11/36 kanal 9 marla
Show the other 4 parcels
  • 37//128 kanal
  • 37//2/27 kanal 11 marla
  • 37//8/31 kanal 3 marla
  • 37//98 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 36//5/2/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan Superimposed23 Sept 2021Approved Site Plan22 Sept 2021

Layout plan

1 file
Latest Layout Plan22 Sept 2021

Building plans

10 files
Tower 1, 2, 3, 6, 7, 8 Elevation22 Sept 2021Tower 1, 2, 3, 6, 7, 8 Section22 Sept 2021Tower 1, 2, 3, 6, 7, 8 Typical & Terrace22 Sept 2021Tower 4 Elevation22 Sept 2021Tower 4 Section22 Sept 2021Approved Building Plans, Full Set22 Sept 2021

Floor plans

4 files
Tower 1, 2, 3, 6, 7, 8 Ground & 1st22 Sept 2021Tower 4 Ground & 1st22 Sept 2021Tower 5 Ground & 1st22 Sept 2021Tower 5 Typical22 Sept 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (51 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1713 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on GLS Infraprojects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.