Skip to content

Urban Homes-II Extension

by Gallium Projectinfra · Sector 86, Gurugram

Not on our price list yet

Possession 15 Nov 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 86, Gurugram2.7 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Carpet area
644–645 sq ft
In m²about 60–60 m², as declared
Registered
28 Sep 2020
Registered by
PYRAMID INFRATECH PRIVATE LIMITEDthe company that filed it, for Gallium Projectinfra
Timeline
  1. 15 Jun 2020Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
  2. 28 Sep 2020Registered with HARERAHARERA, read 4 Nov 2026
  3. 15 Nov 2023Possession, as declareddeclared to HARERA, read 15 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

188homes, 644 to 645 sq ft of carpet area
  • Under 1,000 sq ft644–645 sq ft188

Carpet area per home, as declared to HARERA (read 15 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.5 acres in all, by use
  • Roads0.54 acres · 36%
  • Green belts0.33 acres · 22%
  • Parking0.312 acres · 21%
  • Apartment buildings0.21 acres · 14%
  • Other usesas the form names them: Rain water harvesting, Area under commercial units0.107 acres · 7%
  • Electricity sub-station0.001 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenStone counter with tile
  • FloorsI PS flooring
  • WallsOBD paint
  • BathroomsPVC
  • WindowsGlass panels
  • Main doorSKIN door
  • Water storageOver HEAD tank

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 86, GurugramSector 86, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS2.7 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.2 km
  • Sohna Elevated Corridor (NH-248A)9.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Urban Homes-II Extension registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/412/144/2020/28, registered on 28 Sep 2020. Ended 15 Nov 2023. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Urban Homes-II Extension?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 15 Nov 2023. Its registration runs to 15 Nov 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Urban Homes-II Extension?From the records · Map pin and road lines, read 6 Sep 2026

Urban Homes-II Extension is in Sector 86, Gurugram; the site address declared to HARERA is Village Badha, Sector-86. In a straight line it is about 2.7 km from Delhi–Gurugram–SNB RRTS, 3.2 km from Dwarka Expressway and 9.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Urban Homes-II Extension?From the records · HARERA, read 4 Nov 2026

Urban Homes-II Extension is a Gallium Projectinfra project, registered by its company PYRAMID INFRATECH PRIVATE LIMITED.

The source ↗Gallium Projectinfra's projects and court record

The records

What the registers hold for Urban Homes-II Extension: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/412/144/2020/28: Registration expired. Ended 15 Nov 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 78 OF 2018 is on the DTCP register: Licence lapsed; the register prints its validity to 16 Nov 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 15 Jun 2020, building plans 15 Jun 2020.Declared to HARERA, read 15 Oct 2026
The court record of Gallium Projectinfra’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 15 Nov 2023. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 78 OF 2018 lapsed

    Named in this project’s application. Valid to 16 Nov 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 50 HARERA files, with the dates we read them
Registration no.
GGM/412/144/2020/28
Registration date
28 Sept 2020
Registration valid till
15 Nov 2023
Declared possession
15 Nov 2023

Declared by the promoter to HARERA

Land area
1.5 (Acre) (6,070.28 sq m)
FAR
2.25 proposed of 2.25 permissible
licence
78 OF 2018 DATED 17.11.2018
Estimated project cost
₹42.50 crore
Cost of land
₹8.92 crore
Layout plan, declared approved (field 5a)
15 Jun 2020
Building plans, declared approved
15 Jun 2020
Construction to start
15 Nov 2020
Completion declared for
15 Nov 2023
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 92 units · 59.797 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 96 units · 59.946 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. ZONING PLAN APPROVAL VIDE NO. 6966 — declared: already been obtained (22 Nov 2018)
  • II. SERVICE PLAN ESTIMATES APPROVAL VIDE MEMO NO.87402 — declared: already been obtained (18 Jun 2020)
  • III. BUILDING PLAN MEMO NO. ZP-1068/AD(RA)/2020/9927 — declared: already been obtained (15 Jun 2020)
  • IV. LICENSE 78 OF 2018 — declared: already been obtained (17 Nov 2018)
  • V. AIRPORT HEIGHT CLEARANCE VIDE NO. PALM/NORTH/B/012419/366326 — declared: already been obtained (19 Jan 2019)
  • VI. ENVIRONMENT CLEARANCE VIDE NO. SIA/HR/MIS/156710/2020 — declared: applied for but yet to receive (9 Jun 2020)
  • VII. FIRE SCHEME APPROVAL FS/2020/188 DATED 04.08.2020 — declared: applied for but yet to receive (2 Mar 2020)
On file with HARERA · 50 files

On file with HARERA (50)

Plans

Site plan

1 file
Approved Site Plan21 Jul 2020

Layout plan

1 file
Latest Layout Plan21 Jul 2020

Zoning plan

1 file
Zoning Plan21 Jul 2020

Demarcation plan

3 files
Letter Demarcation Plan22 Jul 2020Superimposed Demarcation22 Jul 2020Demarcation Plan21 Jul 2020

Building plans

2 files
BR III22 Jul 2020Approved Building Plans, Full Set22 Jul 2020

Services

Electricity

1 file
Power Assurance Certificate22 Jul 2020

Service plans

2 files
Service Estimate22 Jul 2020Service Plans on the Layout22 Jul 2020

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate6 Sept 2024

DTCP licence

3 files
LOI22 Jul 2020LC IV22 Jul 2020Licence Copy with Land Schedule21 Jul 2020

Environment clearance

1 file
Environment Acknowledgement Slip22 Jul 2020

Fire safety

1 file
Fire Acknowledgement Slip22 Jul 2020

Other NOCs and clearances

6 files
NOC Drinking Water22 Jul 2020NOC Height Clearance22 Jul 2020NOC Sewerage Connection22 Jul 2020

Land records

Land records

8 files
Non Encumbrance Certificate22 Jul 2020Jamabandi22 Jul 2020License Entry in Revenue Record22 Jul 2020

Money

Accounts and finance

12 files
EDC II22 Jul 2020Cash Flow Statement22 Jul 2020Annual Report 201922 Jul 2020

Timeline and progress

Construction schedule

1 file
PERT Chart22 Jul 2020

The promoter’s papers

Declarations and affidavits

5 files
CA Certificate for Rep I22 Jul 2020Tree Cutting Affidavit22 Jul 2020Bank Undertaking22 Jul 2020

Company papers

1 file
MOA & AOA22 Jul 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

78 OF 2018 · Pyramid Infratech Pvt Ltd · GURGAON-MANESAR

Licence valid to 16 Nov 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Jul 2020 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

78 OF 2018: 2 parcels, 1.5 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 1.5 acres.

  • 41//18/26 kanal
  • 41//23/16 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 41//18/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No collector rate for a residential flat in Sector 86 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan21 Jul 2020

Layout plan

1 file
Latest Layout Plan21 Jul 2020

Building plans

2 files
BR III22 Jul 2020Approved Building Plans, Full Set22 Jul 2020

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (50 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1399 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Gallium Projectinfra

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.