Skip to content

Colonnade

by Emaar MGF Land · Sector 66, Gurugram

Not on our price list yet

Possession 31 Aug 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 66, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Registered
28 Aug 2017
Registered by
EMAAR INDIA LIMITED (FORMERLY KNOWN AS EMAAR MGF LAND LTD.)the company that filed it, for Emaar MGF Land
Timeline
  1. 28 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 2 Sep 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Aug 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 31 Dec 2023Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.249 acres in all, by use
  • Other usesas the form names them: Area under commercial units, Area to be left for transferring to the government for road and green belt1.119 acres · 50%
  • Roads0.459 acres · 20%
  • Green belts0.394 acres · 18%
  • Pavements0.277 acres · 12%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • LiftsFor retail: 2NOS of passengers lifts & 1NOS of service lift connection from basement to retail floors for office floors: 4NOS of passengers lifts & 1no of service lift in FIRE tower as per NBC requirement.
  • BathroomsModern fittings & low FLOW fixtures
  • WindowsAluminum frame with DGU
  • Main doorFIRE rated door / normal door as per requirement.
  • Electrical fittingsProvision of electrical fittings for all the common area as per requirement.
  • Water storageUnder ground water tank & over HEAD water tank as per requirement.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 66, GurugramSector 66, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.8 km
  • Delhi–Gurugram–SNB RRTS5.7 km
  • Dwarka ExpresswayOpen, 17 Aug 20256.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 19
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Colonnade registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 156 OF 2017, registered on 28 Aug 2017. Ended 31 Dec 2023. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Colonnade?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Aug 2022. Its registration runs to 31 Dec 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Colonnade?From the records · Map pin and road lines, read 6 Sep 2026

Colonnade is in Sector 66, Gurugram; the site address declared to HARERA is Sector 66. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 5.7 km from Delhi–Gurugram–SNB RRTS and 6.3 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Colonnade?From the records · HARERA, read 4 Nov 2026

Colonnade is a Emaar MGF Land project, registered by its company EMAAR INDIA LIMITED (FORMERLY KNOWN AS EMAAR MGF LAND LTD.).

The source ↗Emaar MGF Land's projects and court record

The records

What the registers hold for Colonnade: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 156 OF 2017: Registration expired. Ended 31 Dec 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 163 OF 2008 is on the DTCP register: Licence lapsed; the register prints its validity to 18 Aug 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 2 Sep 2020, building plans 2 Sep 2020.Declared to HARERA, read 29 Oct 2026
The court record of Emaar MGF Land’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2023. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 163 OF 2008 lapsed

    Named in this project’s application. Valid to 18 Aug 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 28 HARERA files, with the dates we read them
Registration no.
156 OF 2017
Registration date
28 Aug 2017
Registration valid till
31 Dec 2023
Declared possession
31 Aug 2022

Declared by the promoter to HARERA

Land area
2.25 (Acre) (9,105.43 sq m)
FAR
the application prints 225, which is not a ratio
licence
163 of 2008
Estimated project cost
₹245.61 crore
Cost of land
₹3.23 crore
Layout plan, declared approved (field 5a)
2 Sept 2020
Building plans, declared approved
2 Sept 2020
Completion declared for
31 Aug 2022
Declared inventory · 20 types

Declared inventory — 20 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type BASEMENT-1 (SHOP) · 1 unit · 4,429.71 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type GROUND FLOOR (SHOP) · 80 units · 19,507.04 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 1ST FLOOR (SHOP) · 75 units · 15,144.97 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2ND FLOOR (SHOP) · 80 units · 16,314.48 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR (OFFICE) · 1 unit · 4,373.63 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR (RESTAURANT) · 6 units · 7,374.47 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR (OFFICE) · 19 units · 5,625.37 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR (OFFICE) · 19 units · 5,541.52 sq m carpet
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (19 Aug 2008)
  • II. ENVIRONMENTAL CLEARANCE — declared: already been obtained (15 Sept 2016)
  • III. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (27 Mar 2015)
  • IV. APPROVAL FOR FIRE FIGHTING — declared: already been obtained (19 Apr 2017)
On file with HARERA · 28 files

On file with HARERA (28)

Plans

Site plan

5 files
Site Plan-Garden Hydrant and Flushing Layout Scheme18 Feb 2021Site Plan-Power Supply18 Feb 2021Site Plan-Road Layout Scheme18 Feb 2021

Layout plan

1 file
Latest Layout Plan16 Mar 2020

Building plans

1 file
Building Plan Revision Principle Approval18 Feb 2021

Floor plans

1 file
Basement 04 Plan18 Feb 2021

Services

Electricity

1 file
Street Light and Parking Layout18 Feb 2021

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded4 Aug 2023

Completion certificate (CC)

1 file
CC uploaded12 Dec 2025

DTCP licence

2 files
LOI 2.25 Acres Commercial17 Feb 2021Licence Copy with Land Schedule16 Mar 2020

Environment clearance

1 file
Environment Clearance18 Feb 2021

Fire safety

1 file
Fire Fighting Scheme Approval for 2.25 Acres18 Feb 2021

Other NOCs and clearances

1 file
NOC Airport Authority of India18 Feb 2021

Land records

Land records

2 files
Non Encumbrance Certificate18 Feb 2021Revenue Record Entry of Licence and Collaboration18 Feb 2021

Sales papers

Allotment and sale agreements

1 file
BBA & Allotment Letter18 Feb 2021

Money

Accounts and finance

6 files
CA Certificate of Sources of Fund18 Feb 2021Annual Report - 2019-2018 Feb 2021Annual Report - 2017-1818 Feb 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Mar 2020

Company papers

1 file
Board Resolution18 Feb 2021

Other filings

Other filings

1 file
Project Continuation- RC/REP/HARERA/GGM/156 of 2017/7(3)/25/2023/02 Dated 03.02.202310 Feb 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

163 OF 2008 · Logical Developers · GURGAON-MANESAR

Licence valid to 18 Aug 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Mar 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

163 OF 2008: 3 parcels, 2.25 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 2.25 acres.

  • 23//19/16 kanal
  • rectangle 23, kila 9/2 min4 kanal
  • rectangle 23, kila 128 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 23//19/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,60,000 per sq yd

Sector 66, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

5 files
Site Plan-Garden Hydrant and Flushing Layout Scheme18 Feb 2021Site Plan-Power Supply18 Feb 2021Site Plan-Road Layout Scheme18 Feb 2021Site Plan-Sewerage Layout Scheme18 Feb 2021Approved Site Plan16 Mar 2020

Layout plan

1 file
Latest Layout Plan16 Mar 2020

Building plans

1 file
Building Plan Revision Principle Approval18 Feb 2021

Floor plans

1 file
Basement 04 Plan18 Feb 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (28 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1303 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Emaar MGF Land

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.