Under construction

Conscient Elaira Residences

by Conscient Infrastructure · Sector 80, Gurugram

Not on our price list yet

Possession 31 Dec 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 80, Gurugram0.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
1,125–1,492 sq ft
In m²about 105–139 m², as declared
Registered by
CONSCIENT INFRASTRUCTURE PRIVATE LIMITEDthe company that filed it, for Conscient Infrastructure
Timeline
  1. 17 Jan 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2031Registration valid toHARERA, read 4 Nov 2026
  3. 31 Dec 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

266homes, 1,125 to 1,492 sq ft of carpet area
  • 1,000–1,500 sq ft1,125–1,492 sq ft266

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningVRV system
  • KitchenFloor tiles & paint
  • LiftsPassenger/service/fireman lift
  • FloorsMarble/ premium quality tiles/ equivalent
  • WallsPaint surface
  • BathroomsStandard CP fitting + WC+washbasin
  • WindowsAluminium/ UPVC/ equivalent
  • Main doorFlush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 80, GurugramSector 80, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.8 km
  • Sohna Elevated Corridor (NH-248A)8.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Conscient Elaira Residences registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/917/649/2025/20. Valid to 31 Mar 2031.

The source ↗
What is the possession timeline for Conscient Elaira Residences?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2031. Its registration runs to 31 Mar 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Conscient Elaira Residences?From the records · Map pin and road lines, read 6 Sep 2026

Conscient Elaira Residences is in Sector 80, Gurugram; the site address declared to HARERA is Village Naurangpur, Sector-80. In a straight line it is about 0.9 km from Delhi–Gurugram–SNB RRTS, 4.8 km from Dwarka Expressway and 8.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Conscient Elaira Residences?From the records · HARERA, read 4 Nov 2026

Conscient Elaira Residences is a Conscient Infrastructure project, registered by its company CONSCIENT INFRASTRUCTURE PRIVATE LIMITED.

The source ↗Conscient Infrastructure's projects and court record

The records

What the registers hold for Conscient Elaira Residences: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/917/649/2025/20: Registered. Valid to 31 Mar 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 17 Jan 2025, building plans 17 Jan 2025.Declared to HARERA, read 29 Oct 2026
The court record of Conscient Infrastructure’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 61 HARERA files, with the dates we read them
Registration no.
GGM/917/649/2025/20
Registration valid till
31 Mar 2031
Declared possession
31 Dec 2031

Declared by the promoter to HARERA

Land area
4.8727 (Sqr/mtrs)
FAR
1.86 proposed of 1.9 permissible
licence
HSIIDC allotted the site vide Regular Allotment Letter (RLA) No. 9277 dated 29-07-2024, therefore, the very first license/RLA of the project is 29-07-2024
Estimated project cost
₹710.61 crore
Cost of land
₹109.59 crore
Layout plan, declared approved (field 5a)
17 Jan 2025
Building plans, declared approved
17 Jan 2025
Construction to start
1 Sept 2025
Completion declared for
31 Dec 2031
Declared inventory · 10 types

Declared inventory — 10 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 62 units · 104.55 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 34 units · 114.28 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 31 units · 114.43 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 34 units · 127.03 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 62 units · 126.98 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 31 units · 138.59 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 138.59 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 114.43 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. ELECTRICITY LOAD AVAILABILITY — declared: already been obtained (7 Jan 2025)
  • II. STORM WATER DRAINAGE — declared: already been obtained (14 Nov 2024)
  • III. ZONING PLAN APPROVAL — declared: already been obtained (30 Oct 2024)
  • IV. FOREST NOC — declared: already been obtained (14 Nov 2024)
  • V. WATER SUPPLY — declared: already been obtained (14 Nov 2024)
  • VI. SEWAGE DISPOSAL — declared: already been obtained (14 Nov 2024)
On file with HARERA · 61 files

On file with HARERA (61)

Plans

Site plan

5 files
Superimposed Plan20 Feb 2025Approved Site Plan20 Feb 2025St-01 Site Plan20 Feb 2025

Layout plan

1 file
Latest Layout Plan20 Feb 2025

Zoning plan

2 files
Zoning Plan20 Feb 2025Zoning Plan Approval20 Feb 2025

Demarcation plan

1 file
Demarcation Plan20 Feb 2025

Building plans

6 files
Approved Building Plans, Full Set20 Feb 2025El-02 Elevation B20 Feb 2025Sc-01 Section Aa20 Feb 2025

Floor plans

12 files
Tb-02 Community Building 1 First Floor20 Feb 2025Td-01 Toilet Detail Tower A20 Feb 2025Ta-04 Tower A&B Typical20 Feb 2025

Services

Water supply

5 files
Sd-02 Tower A Flushing Water Schematic Diagram20 Feb 2025Sd-04 Tower B Flushing Water Schematic Diagram20 Feb 2025Sd-03 Tower B Domestic Water Schematic Diagram20 Feb 2025

Service plans

1 file
Service Plans on the Layout23 Jan 2025

Approvals and clearances

Completion certificate (CC)

1 file
Sc-02 Section Bb,cc,dd20 Feb 2025

DTCP licence

1 file
Licence Copy with Land Schedule23 Jan 2025

Environment clearance

1 file
Environment Clearance Applied20 Feb 2025

Other NOCs and clearances

3 files
Assurance for Issuance (NOC)20 Feb 2025Forest Clearance20 Feb 2025Assurance Power & Mining Permission Dtd-07.01.202420 Feb 2025

Land records

Land records

4 files
Non-Encumbrance Certificate20 Feb 2025Land Search Report20 Feb 2025HSIIDC Ltr.land Schedule20 Feb 2025Revenue Record Entry of Licence and Collaboration23 Jan 2025

Sales papers

Allotment and sale agreements

2 files
Possession Certificate HSIIDC20 Feb 2025Conveyance Deed from HSIIDC20 Feb 2025

Money

Accounts and finance

9 files
Asset Mortgaged Deed20 Feb 2025CA Certificate Equity Infusion20 Feb 2025CA Certificate Net Worth20 Feb 2025

The promoter’s papers

Declarations and affidavits

2 files
Bank Undertaking20 Feb 2025The Promoter’s Declaration on Affidavit23 Jan 2025

Company papers

2 files
ROC Form20 Feb 2025ROC Statement20 Feb 2025

Other filings

Other filings

3 files
HSIIDC ( Rla) Ltr.dtd-29.07.202420 Feb 2025Td-03 Toilet Detail20 Feb 2025Tb-01 Community Building 120 Feb 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared HSIIDC allotted the site vide Regular Allotment Letter (RLA) No. 9277 dated 29-07-2024, therefore, the very first license/RLA of the project is 29-07-2024. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Jan 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No collector rate for a residential flat in this sector in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

5 files
Superimposed Plan20 Feb 2025Approved Site Plan20 Feb 2025St-01 Site Plan20 Feb 2025St-02 Site Plan (Green Area) &PODIUM; Coverage20 Feb 2025St-03 Site Plan Service20 Feb 2025

Layout plan

1 file
Latest Layout Plan20 Feb 2025

Building plans

6 files
Approved Building Plans, Full Set20 Feb 2025El-02 Elevation B20 Feb 2025Sc-01 Section Aa20 Feb 2025BR III20 Feb 2025El-01 Elevation-A20 Feb 2025Ta-06 Tower A&B Terrace Floor Plan20 Feb 2025

Floor plans

12 files
Tb-02 Community Building 1 First Floor20 Feb 2025Td-01 Toilet Detail Tower A20 Feb 2025Ta-04 Tower A&B Typical20 Feb 2025Ta-05 Tower A&B Refuge Floor Plan20 Feb 2025Td-02 Toilet Detail Towerb20 Feb 2025Ta-01 Tower A & B Community Building 220 Feb 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (61 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3308 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Conscient Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.