ELAIRA RESIDENCES PHASE - 2 & 2A
by Conscient Infrsatructure · Sector 80, Gurugram
Not on our price list yet
Possession 31 Dec 2032 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 80, Gurugram0.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- CONSCIENT INFRSATRUCTURE PRIVATE LIMITEDthe company that filed it, for Conscient Infrsatructure
- 29 Oct 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Jun 2032Registration valid toHARERA, read 4 Nov 2026
- 31 Dec 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,125–1,492 sq ft270
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings1,972 m² · 71%
- Other usesas the form names them: Nursery school810 m² · 29%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningVRV system
- KitchenFloor tiles & paint
- LiftsPassenger/service/fireman lift
- FloorsMarble/ premium quality tiles/ equivalent
- WallsPaint surface
- BathroomsStandard CP fitting + WC+washbasin
- WindowsAluminium/ UPVC/ equivalent
- Main doorFlush door
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS0.9 km
- Dwarka ExpresswayOpen, 17 Aug 20254.8 km
- Sohna Elevated Corridor (NH-248A)8.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Conscient Infrastructure | Same sector | Under construction | — | 31 Dec 2031 | |
| Trehan Iris | Same sector | New launch | ₹18,000/sq ft | 31 Dec 2032 | |
| Eldeco Group | Same sector | New launch | ₹14,500/sq ft | 15 Jan 2031 | |
![]() | Sobha | Same sector | Under construction | ₹26,000/sq ft | 31 Dec 2030 |
| Conscient Infrastructure | Same sector | Under construction | ₹15,500/sq ft | 28 Feb 2030 | |
| Eldeco Group | Same sector | Under construction | ₹14,500/sq ft | 31 Dec 2030 | |
PALM COUNTYNo photo on file yet | Conmin Infradevelopers | 0.9 kmto its sector’s point | — | — | 5 Mar 2027 |
SUNCITY'S MONARCH RESIDENCESNo photo on file yet | Dvok Buildcon | 0.9 kmto its sector’s point | — | — | 31 Mar 2031 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is ELAIRA RESIDENCES PHASE - 2 & 2A registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/1018/750/2025/121. Valid to 30 Jun 2032.
The source ↗What is the possession timeline for ELAIRA RESIDENCES PHASE - 2 & 2A?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 30 Jun 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around ELAIRA RESIDENCES PHASE - 2 & 2A?From the records · Map pin and road lines, read 6 Sep 2026
ELAIRA RESIDENCES PHASE - 2 & 2A is in Sector 80, Gurugram; the site address declared to HARERA is Viklage Naurangpur, Sector-80. In a straight line it is about 0.9 km from Delhi–Gurugram–SNB RRTS, 4.8 km from Dwarka Expressway and 8.8 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building ELAIRA RESIDENCES PHASE - 2 & 2A?From the records · HARERA, read 4 Nov 2026
ELAIRA RESIDENCES PHASE - 2 & 2A is a Conscient Infrsatructure project, registered by its company CONSCIENT INFRSATRUCTURE PRIVATE LIMITED.
The source ↗Conscient Infrsatructure's projects and court recordThe records
What the registers hold for ELAIRA RESIDENCES PHASE - 2 & 2A: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/1018/750/2025/121: Registered. Valid to 30 Jun 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: building plans 29 Oct 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 66 HARERA files, with the dates we read them
- Registration no.
- GGM/1018/750/2025/121
- Registration valid till
- 30 Jun 2032
- Declared possession
- 31 Dec 2032
Declared by the promoter to HARERA
- Land area
- 2782 (Sqr/mtrs)
- FAR
- 1.78 proposed of 3.65 permissible
- licence
- HSIIDC allotted the site vide Regular Allotment Letter (RLA) No. 9277 dated 29-07-2024, therefore, the very first license/RLA of the project is 29-07-2024
- Estimated project cost
- ₹695.28 crore
- Cost of land
- ₹166.91 crore
- Building plans, declared approved
- 29 Oct 2025
- Construction to start
- 1 Apr 2026
- Completion declared for
- 31 Dec 2032
Declared inventory · 10 types
Declared inventory — 10 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 63 units · 104.55 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 35 units · 104.55 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 31 units · 114.43 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 35 units · 127.03 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 63 units · 126.98 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 31 units · 138.59 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 138.59 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 114.43 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 8
Statutory approvals, as declared
- I. ELECTRICITY LOAD AVAILABILITY — declared: already been obtained (7 Jan 2025)
- II. STORM WATER DRAINAGE — declared: already been obtained (14 Nov 2024)
- III. ZONING PLAN APPROVAL — declared: already been obtained (29 Jul 2025)
- IV. FOREST NOC — declared: already been obtained (14 Nov 2024)
- V. WATER SUPPLY — declared: already been obtained (14 Nov 2024)
- VI. SEWAGE DISPOSAL — declared: already been obtained (14 Nov 2024)
- VII. FIRE SCHEME — declared: applied for but yet to receive (18 Oct 2025)
- VIII. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (29 Oct 2025)
On file with HARERA · 66 files
On file with HARERA (66)
Plans
Site plan
3 filesLayout plan
1 fileDemarcation plan
1 fileBuilding plans
10 filesFloor plans
7 filesServices
Water supply
1 fileService plans
1 fileApprovals and clearances
DTCP licence
2 filesEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
7 filesLand records
Land records
4 filesSales papers
Allotment and sale agreements
3 filesBrochure and specifications
1 fileMoney
Accounts and finance
11 filesTimeline and progress
Construction schedule
1 fileThe promoter’s papers
Declarations and affidavits
4 filesCompany papers
3 filesOther filings
Other filings
4 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared HSIIDC allotted the site vide Regular Allotment Letter (RLA) No. 9277 dated 29-07-2024, therefore, the very first license/RLA of the project is 29-07-2024. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Oct 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
3 filesLayout plan
1 fileBuilding plans
10 filesFloor plans
7 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (66 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3779 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Conscient Infrsatructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.
