ELAIRA RESIDENCES PHASE - 2 & 2A

by Conscient Infrsatructure · Sector 80, Gurugram

Not on our price list yet

Possession 31 Dec 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 80, Gurugram0.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
1,125–1,492 sq ft
In m²about 105–139 m², as declared
Registered by
CONSCIENT INFRSATRUCTURE PRIVATE LIMITEDthe company that filed it, for Conscient Infrsatructure
Timeline
  1. 29 Oct 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Jun 2032Registration valid toHARERA, read 4 Nov 2026
  3. 31 Dec 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

270homes, 1,125 to 1,492 sq ft of carpet area
  • 1,000–1,500 sq ft1,125–1,492 sq ft270

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2,782 m² in all, by use
  • Apartment buildings1,972 m² · 71%
  • Other usesas the form names them: Nursery school810 m² · 29%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV system
  • KitchenFloor tiles & paint
  • LiftsPassenger/service/fireman lift
  • FloorsMarble/ premium quality tiles/ equivalent
  • WallsPaint surface
  • BathroomsStandard CP fitting + WC+washbasin
  • WindowsAluminium/ UPVC/ equivalent
  • Main doorFlush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 80, GurugramSector 80, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.8 km
  • Sohna Elevated Corridor (NH-248A)8.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is ELAIRA RESIDENCES PHASE - 2 & 2A registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1018/750/2025/121. Valid to 30 Jun 2032.

The source ↗
What is the possession timeline for ELAIRA RESIDENCES PHASE - 2 & 2A?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 30 Jun 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ELAIRA RESIDENCES PHASE - 2 & 2A?From the records · Map pin and road lines, read 6 Sep 2026

ELAIRA RESIDENCES PHASE - 2 & 2A is in Sector 80, Gurugram; the site address declared to HARERA is Viklage Naurangpur, Sector-80. In a straight line it is about 0.9 km from Delhi–Gurugram–SNB RRTS, 4.8 km from Dwarka Expressway and 8.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ELAIRA RESIDENCES PHASE - 2 & 2A?From the records · HARERA, read 4 Nov 2026

ELAIRA RESIDENCES PHASE - 2 & 2A is a Conscient Infrsatructure project, registered by its company CONSCIENT INFRSATRUCTURE PRIVATE LIMITED.

The source ↗Conscient Infrsatructure's projects and court record

The records

What the registers hold for ELAIRA RESIDENCES PHASE - 2 & 2A: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1018/750/2025/121: Registered. Valid to 30 Jun 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: building plans 29 Oct 2025.Declared to HARERA, read 29 Oct 2026
The court record of Conscient Infrsatructure’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 66 HARERA files, with the dates we read them
Registration no.
GGM/1018/750/2025/121
Registration valid till
30 Jun 2032
Declared possession
31 Dec 2032

Declared by the promoter to HARERA

Land area
2782 (Sqr/mtrs)
FAR
1.78 proposed of 3.65 permissible
licence
HSIIDC allotted the site vide Regular Allotment Letter (RLA) No. 9277 dated 29-07-2024, therefore, the very first license/RLA of the project is 29-07-2024
Estimated project cost
₹695.28 crore
Cost of land
₹166.91 crore
Building plans, declared approved
29 Oct 2025
Construction to start
1 Apr 2026
Completion declared for
31 Dec 2032
Declared inventory · 10 types

Declared inventory — 10 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 63 units · 104.55 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 35 units · 104.55 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 31 units · 114.43 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 35 units · 127.03 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 63 units · 126.98 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 31 units · 138.59 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 138.59 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 114.43 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. ELECTRICITY LOAD AVAILABILITY — declared: already been obtained (7 Jan 2025)
  • II. STORM WATER DRAINAGE — declared: already been obtained (14 Nov 2024)
  • III. ZONING PLAN APPROVAL — declared: already been obtained (29 Jul 2025)
  • IV. FOREST NOC — declared: already been obtained (14 Nov 2024)
  • V. WATER SUPPLY — declared: already been obtained (14 Nov 2024)
  • VI. SEWAGE DISPOSAL — declared: already been obtained (14 Nov 2024)
  • VII. FIRE SCHEME — declared: applied for but yet to receive (18 Oct 2025)
  • VIII. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (29 Oct 2025)
On file with HARERA · 66 files

On file with HARERA (66)

Plans

Site plan

3 files
Approved Site Plan21 Nov 2025Site Plan St-121 Nov 2025Site Plan Service St-221 Nov 2025

Layout plan

1 file
Latest Layout Plan21 Nov 2025

Demarcation plan

1 file
Demarcation Plan21 Nov 2025

Building plans

10 files
Company Address Proof10 Dec 2025Tower C & D Section-C Sc-221 Nov 2025Ground Floor FAR Area & Groundcoverage Gf-221 Nov 2025

Floor plans

7 files
Tower C & D 1st & 2nd Floor Plan & Area Diagram T-121 Nov 2025Ground Floor Plan Gf-121 Nov 2025Tower C & D 8th Floor Plan & Area Diagram T-521 Nov 2025

Services

Water supply

1 file
Tower C & D Domestic Water Supply Schematic Diagram Sld-121 Nov 2025

Service plans

1 file
Service Plans on the Layout10 Dec 2025

Approvals and clearances

DTCP licence

2 files
LC-IV or Possession Certificate HSIIDC10 Dec 2025Licence Copy with Land Schedule21 Nov 2025

Environment clearance

1 file
EC Application10 Dec 2025

Fire safety

1 file
Fire Scheme Application10 Dec 2025

Other NOCs and clearances

7 files
Forest NOC10 Dec 2025AAI NOC10 Dec 2025Electrical Load Availability Connection NOC10 Dec 2025

Land records

Land records

4 files
Ask Sajra10 Dec 2025Revenue Record Entry of Licence and Collaboration10 Dec 2025Land Title Serach Report10 Dec 2025Sale Deed10 Dec 2025

Sales papers

Allotment and sale agreements

3 files
Builder Buyer Agreement10 Dec 2025Allotment Letter10 Dec 2025Conveyance Deed10 Dec 2025

Brochure and specifications

1 file
Brochure10 Dec 2025

Money

Accounts and finance

11 files
EDC and IDC Challan10 Dec 2025Loan Clarification10 Dec 2025Cash Flow Statement10 Dec 2025

Timeline and progress

Construction schedule

1 file
PERT Chart10 Dec 2025

The promoter’s papers

Declarations and affidavits

4 files
Affidavit Promoter10 Dec 2025Bank Undertaking10 Dec 2025Tree Cutting Permission or Undertaking10 Dec 2025The Promoter’s Declaration on Affidavit21 Nov 2025

Company papers

3 files
MOA & AOA Cipl10 Dec 2025TAN10 Dec 2025Prescribed Form ROC10 Dec 2025

Other filings

Other filings

4 files
Applciation Form10 Dec 2025Jamabadi10 Dec 2025Non Encumrances Certificate10 Dec 2025Repaymemt Schedule10 Dec 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared HSIIDC allotted the site vide Regular Allotment Letter (RLA) No. 9277 dated 29-07-2024, therefore, the very first license/RLA of the project is 29-07-2024. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Oct 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Approved Site Plan21 Nov 2025Site Plan St-121 Nov 2025Site Plan Service St-221 Nov 2025

Layout plan

1 file
Latest Layout Plan21 Nov 2025

Building plans

10 files
Company Address Proof10 Dec 2025Tower C & D Section-C Sc-221 Nov 2025Ground Floor FAR Area & Groundcoverage Gf-221 Nov 2025Tower C & D Terrace Floor Plan & Lmr & 0th Plan T-621 Nov 2025Tower-C&D Elevation 1 & 2 El-121 Nov 2025BR-III21 Nov 2025

Floor plans

7 files
Tower C & D 1st & 2nd Floor Plan & Area Diagram T-121 Nov 2025Ground Floor Plan Gf-121 Nov 2025Tower C & D 8th Floor Plan & Area Diagram T-521 Nov 2025Tower C & D Toilet Detail Td-121 Nov 2025Tower C & D Typical Floor Plan & Area Diagram T-321 Nov 2025Tower C & D Refuge Floor Plan & Area Diagram T-421 Nov 2025Tower C & D 3rd Floor Plan & Area Diagram T-221 Nov 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (66 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3779 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Conscient Infrsatructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.