Skip to content
Under construction

Godrej Astra

by Godrej Highview · Sector 54, Gurugram

From ₹10.34 Cr

₹30,000 a sq ftof carpet area

As listed on godrejproperties.com (“INR 10.34 Cr. onwards”), read 23 Oct 2026. Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 16 Oct 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 54, Gurugram6.0 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Carpet area
274–2,030 sq ft
In m²about 25–189 m², as declared
Price, as listed
From ₹10.34 Cr
Asking rate
₹30,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
WONDER CITY BUILDCON LTD.the company that filed it, for Godrej Highview
Timeline
  1. 30 Aug 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 16 Oct 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

157homes, 274 to 2,030 sq ft of carpet area
  • Under 1,000 sq ft274–414 sq ft6
  • 1,000–1,500 sq ft1,298 sq ft2
  • 1,500–2,000 sq ft1,617–1,721 sq ft102
  • 2,000–2,500 sq ft2,002–2,030 sq ft47

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 28 rows of a single unit and 4 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11,169 m² in all, by use
  • Roads2,724 m² · 24%
  • Parks and playgrounds2,437 m² · 22%
  • Apartment buildings2,153 m² · 19%
  • Pavements1,407 m² · 13%
  • Shops and offices1,169 m² · 10%
  • Other usesas the form names them: Street, Electrical, Security672 m² · 6%
  • Electricity sub-station423 m² · 4%
  • Club house184 m² · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAs per specification. of standard make
  • KitchenFloor: vitrified tiles, wall: ceramic tiles2FT above counter and OBD paint onremaining area, ceiling: OBD paint
  • LiftsTower 1 & 2: 3 passenger lift & 1 servicelift (each)
  • FloorsVitrified tiles/ceramic tiles
  • WallsAcrylic emulsion paint/ oil bounddistemper
  • BathroomsAll provided with standard company make
  • WindowsPowder coated/painted aluminum/upvcwindows with 4MM or above thick glazingas per specifications
  • Main doorVeneer/laminated/painted flush/FIRE doorwith wooden frame

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 54, GurugramSector 54, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS6.0 km
  • Sohna Elevated Corridor (NH-248A)7.4 km
  • Dwarka ExpresswayOpen, 17 Aug 202510.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 8 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 7

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Godrej Astra registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/883/615/2024/110. Valid to 16 Oct 2031.

The source ↗
What is the possession timeline for Godrej Astra?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 16 Oct 2031. Its registration runs to 16 Oct 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Godrej Astra?From the records · Map pin and road lines, read 6 Sep 2026

Godrej Astra is in Sector 54, Gurugram; the site address declared to HARERA is Sector 54, Urban Estate, Gurugram Ii. In a straight line it is about 6.0 km from Delhi–Gurugram–SNB RRTS, 7.4 km from Sohna Elevated Corridor (NH-248A) and 10.3 km from Dwarka Expressway.

The source ↗
What does a home in Godrej Astra cost, and how does that compare nearby?From the records · godrejproperties.com, read 23 Oct 2026; Bhumiq team price list, 16 Sep 2026

The developer's website, godrejproperties.com, lists homes from ₹10.34 Cr ("INR 10.34 Cr. onwards"). The Bhumiq team's price list has ₹30,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Godrej Astra: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/883/615/2024/110: Registered. Valid to 16 Oct 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 30 Aug 2024, building plans 30 Aug 2024.Declared to HARERA, read 29 Oct 2026
The court record of Godrej Highview’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 49 HARERA files, with the dates we read them
Registration no.
GGM/883/615/2024/110
Registration valid till
16 Oct 2031
Declared possession
16 Oct 2031
Asking price (indicative)
₹30,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
2.759 (Acre) (11,165.28 sq m)
FAR
3.64 proposed of 3.65 permissible
licence
HSVP land - e-auction, GH100 at Sector 54, Urban Estate Gurugram II on free hold basis Allotment letter vide memo no. ZO002/EO018/UE029/GALOT/0000001408 dated 20.12.2023
Estimated project cost
₹883.64 crore
Cost of land
₹417.35 crore
Layout plan, declared approved (field 5a)
30 Aug 2024
Building plans, declared approved
30 Aug 2024
Construction to start
16 Oct 2024
Completion declared for
16 Oct 2031
Declared inventory · 106 types

Declared inventory — 106 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 29 units · 185.96 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 26 units · 150.27 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 152.72 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 159.67 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 20 units · 151.45 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 22 units · 150.32 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 159.92 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 18 units · 188.62 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. LETTER OF INTENT (LOI) — declared: already been obtained (12 Jul 2023)
  • II. ALLOTMENT LETTER — declared: already been obtained (20 Dec 2023)
  • III. OFFER OF POSSESSION — declared: already been obtained (20 Dec 2023)
  • IV. POSSESSION LETTER — declared: already been obtained (16 Jan 2024)
  • V. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (29 Mar 2024)
  • VI. ASSURANCE OF STORM WATER CONNECTION — declared: already been obtained (29 Mar 2024)
  • VII. ASSURANCE OF STP TREATED WATER CONNECTION FOR CONSTRUCTION PURPOSE — declared: already been obtained (29 Mar 2024)
  • VIII. ASSURANCE OF WATER SUPPLY — declared: already been obtained (3 Sept 2024)
  • IX. SANCTION OF ULTIMATE LOAD ASSURANCE — declared: already been obtained (7 May 2024)
  • X. BUILDING PLAN APPROVAL — declared: already been obtained (30 Aug 2024)
  • XI. ENVIRONMENT CLEARANCE — declared: already been obtained (14 Sept 2024)
On file with HARERA · 49 files

On file with HARERA (49)

Plans

Site plan

2 files
Site Plan Service Plan15 Sept 2024Approved Site Plan8 Sept 2024

Layout plan

1 file
Latest Layout Plan8 Sept 2024

Zoning plan

1 file
Zoning Plan8 Sept 2024

Demarcation plan

1 file
Demarcation Plan8 Sept 2024

Building plans

9 files
Tower 1 & 2 29th Floor Plan, Terrace Plan, Mumty Machine & Area Diagram15 Sept 2024Tower 1 & 2 Elevation A15 Sept 2024Tower 1 & 2 Elevation B & D15 Sept 2024

Floor plans

20 files
Basement 01 Floor Plan & Area Diagram15 Sept 2024Basement 02 Floor Plan & Area Diagram15 Sept 2024Basement 3 Floor Plan & Area Diagram15 Sept 2024

Services

Sewerage and drainage

3 files
Assurance Certificate for Storm8 Sept 2024Assurance Certificate for Sewerage Connection8 Sept 2024Assurance Certificate of STP Treated Water Connection for Construction Purpose8 Sept 2024

Water supply

1 file
Assurance Certificate for Water Supply8 Sept 2024

Electricity

1 file
Assurance Certificate from DHBVN8 Sept 2024

Approvals and clearances

DTCP licence

2 files
Letter of Intent (LOI)8 Sept 2024Licence Copy with Land Schedule8 Sept 2024

Environment clearance

1 file
Environment Clerance20 Sept 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration8 Sept 2024

Sales papers

Allotment and sale agreements

1 file
Possession Letter8 Sept 2024

Money

Accounts and finance

2 files
CA Certificate on the Application’s Figures17 Sept 2024Non-Default Certificate from a CA15 Sept 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit9 Jan 2025

Other filings

Other filings

2 files
Ground Coverage Area Diagram15 Sept 2024Offer of Possesion8 Sept 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared HSVP land - e-auction, GH100 at Sector 54, Urban Estate Gurugram II on free hold basis Allotment letter vide memo no. ZO002/EO018/UE029/GALOT/0000001408 dated 20.12.2023. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 24 Sept 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate, residential flat
₹10,780 per sq ft

Sector 54, collector rates effective 1 Apr 2026, Wazirabad tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan Service Plan15 Sept 2024Approved Site Plan8 Sept 2024

Layout plan

1 file
Latest Layout Plan8 Sept 2024

Building plans

9 files
Tower 1 & 2 29th Floor Plan, Terrace Plan, Mumty Machine & Area Diagram15 Sept 2024Tower 1 & 2 Elevation A15 Sept 2024Tower 1 & 2 Elevation B & D15 Sept 2024Tower 1 & 2 Elevation C & E15 Sept 2024Tower 1 & 2 Section Xx15 Sept 2024Tower 1 & 2 Section Yy & Zz15 Sept 2024

Floor plans

20 files
Basement 01 Floor Plan & Area Diagram15 Sept 2024Basement 02 Floor Plan & Area Diagram15 Sept 2024Basement 3 Floor Plan & Area Diagram15 Sept 2024Carpet Area of 2nd Floor Plan & Typical Floor15 Sept 2024Carpet Area of First Floor Plan15 Sept 2024Carpet Area of Ground Floor Plan15 Sept 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (49 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3079 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Godrej Highview

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

From ₹10.34 CrBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.