About this project

Key facts

Location
Sector 54, Gurugram6.0 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
5,447–9,688 sq ft
In m²about 506–900 m², as declared
Registered by
DLF LIMITEDthe company that filed it, for DLF
Timeline
  1. 12 Sep 2024Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 19 Sep 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

413homes, 5,447 to 9,688 sq ft of carpet area
  • 3,000 sq ft and above5,447–9,688 sq ft413

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 8 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside16.48 acres in all, by use
  • Roads10.07 acres · 61%
  • Apartment buildings3.23 acres · 20%
  • Parks and playgrounds2.47 acres · 15%
  • Club house0.43 acres · 3%
  • Other uses0.28 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningOutdoor unit of variable refrigerant FLOW (VRF)
  • LiftsBranded make
  • FloorsConcrete (M30-M90 as per is-456 is2185)
  • WallsBlock WORK
  • BathroomsCP fitting, WASH basin, WC
  • WindowsSame as point#13
  • Main doorMS door
  • Electrical fittingsLight fixture for balconies only

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 54, GurugramSector 54, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS6.0 km
  • Sohna Elevated Corridor (NH-248A)7.4 km
  • Dwarka ExpresswayOpen, 17 Aug 202510.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 30 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 18
  • Registered, no OC or CC yet: 12

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is THE DAHLIAS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/872/604/2024/99. Valid to 31 Dec 2031.

The source ↗
What is the possession timeline for THE DAHLIAS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2031. Its registration runs to 31 Dec 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE DAHLIAS?From the records · Map pin and road lines, read 6 Sep 2026

THE DAHLIAS is in Sector 54, Gurugram; the site address declared to HARERA is R16, Dlf 5, Sector 54 Gurugram. In a straight line it is about 6.0 km from Delhi–Gurugram–SNB RRTS, 7.4 km from Sohna Elevated Corridor (NH-248A) and 10.3 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE DAHLIAS?From the records · HARERA, read 4 Nov 2026

THE DAHLIAS is a DLF project, registered by its company DLF LIMITED.

The source ↗DLF's projects and court record

The records

What the registers hold for THE DAHLIAS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/872/604/2024/99: Registered. Valid to 31 Dec 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Licence 129 OF 1995, as the developer typed it: no match in the registers searched.Declared to HARERA, read 29 Oct 2026
  • Plans approved, as the developer declared: layout plan 12 Sep 2024, building plans 19 Sep 2024.Declared to HARERA, read 29 Oct 2026
The court record of DLF’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 113 HARERA files, with the dates we read them
Registration no.
GGM/872/604/2024/99
Registration valid till
31 Dec 2031
Declared possession
31 Dec 2031

Declared by the promoter to HARERA

Land area
16.489 (Acre) (66,728.62 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
License Approve by DTCP vide License No. 129 of 1995, 131 of 1995, 38 of 1996, 39 of 1996, 40 of 1996, 52 of 1996, 53 of 1996, 57 of 1996, 02 of 2002, 04 of 2002, 06 of 2002
Estimated project cost
₹6186.52 crore
Cost of land
₹53.09 crore
Layout plan, declared approved (field 5a)
12 Sept 2024
Building plans, declared approved
19 Sept 2024
Construction to start
20 Apr 2024
Completion declared for
31 Dec 2031
Declared inventory · 28 types

Declared inventory — 28 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 1 unit · 1,109.42 sq m carpet · 9 towers
  • Apartment/Shops/Other Buildings · 1 unit · 1,108.73 sq m carpet · 9 towers
  • Apartment/Shops/Other Buildings · 1 unit · 1,086.82 sq m carpet · 9 towers
  • Apartment/Shops/Other Buildings · 1 unit · 1,079.18 sq m carpet · 9 towers
  • Apartment/Shops/Other Buildings · 1 unit · 901.92 sq m carpet · 9 towers
  • Apartment/Shops/Other Buildings · 5 units · 900.02 sq m carpet · 9 towers
  • Apartment/Shops/Other Buildings · 3 units · 850.82 sq m carpet · 9 towers
  • Apartment/Shops/Other Buildings · 1 unit · 835.27 sq m carpet · 9 towers
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (1 Aug 2024)
  • II. AIRPORT AUTHORITY — declared: already been obtained (26 Dec 2023)
  • III. ARAVALI NOC — declared: already been obtained (15 Apr 2024)
  • IV. FOREST NOC — declared: already been obtained (18 Mar 2024)
On file with HARERA · 113 files

On file with HARERA (113)

Plans

Site plan

2 files
Approved Site Plan1 Oct 2024St-02 Site Plan Green Arera 7 11ZON1 Oct 2024

Layout plan

2 files
Phasing Plan1 Oct 2024Latest Layout Plan8 Aug 2024

Zoning plan

1 file
Zoning Plan1 Oct 2024

Demarcation plan

1 file
Demarcation Plan8 Aug 2024

Building plans

4 files
Sc-01 Section A-A (Tower-1 9 11ZON1 Oct 2024El-02 Elevation West (Towe 2 11ZON1 Oct 2024El-01 Elevation North (Tow 1 11ZON1 Oct 2024Approved Building Plans, Full Set8 Aug 2024

Floor plans

8 files
Bs-04 Floor Plan-Basement 4 4 11ZON1 Oct 2024Bs-05 Area Diagram Basement -1 5 11ZON1 Oct 2024Bs-01 Floor Plan-Basement 1 1 11ZON1 Oct 2024

Services

Service plans

2 files
SPE1 Oct 2024Service Plans on the Layout1 Oct 2024

Approvals and clearances

DTCP licence

3 files
Renewal of Licence 110-133 of 1995 Dt. 11.03.201 Oct 2024Renewal DLF5 Licenses Dt 010820241 Oct 2024Licence Copy with Land Schedule8 Aug 2024

Land records

Land records

3 files
St-01 Khasra Marked Site Plan 5 11ZON1 Oct 2024Super Imposed Khasra Plan1 Oct 2024Revenue Record Entry of Licence and Collaboration8 Aug 2024

Money

Accounts and finance

5 files
Approval for Change in Bank Account17 Sept 2026Cash Flow Statement1 Oct 2024Non-Default Certificate from a CA1 Oct 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit1 Oct 2024

HARERA’s orders

HARERA’s orders

1 file
Addendum to the Registration Certificate-Revision in Building Plans22 Jan 2026

Other filings

Other filings

80 files
El-12 5 11ZON1 Oct 2024Pl-900 8 11ZON1 Oct 2024Sc-03 11 11ZON1 Oct 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 11 DTCP licences named on the application

The promoter declared 129 OF 1995. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 131 OF 1995. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 38 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 39 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 40 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 52 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 53 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 57 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 02 OF 2002. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 04 OF 2002. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 06 OF 2002. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Aug 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Approved Site Plan1 Oct 2024St-02 Site Plan Green Arera 7 11ZON1 Oct 2024

Layout plan

2 files
Phasing Plan1 Oct 2024Latest Layout Plan8 Aug 2024

Building plans

4 files
Sc-01 Section A-A (Tower-1 9 11ZON1 Oct 2024El-02 Elevation West (Towe 2 11ZON1 Oct 2024El-01 Elevation North (Tow 1 11ZON1 Oct 2024Approved Building Plans, Full Set8 Aug 2024

Floor plans

8 files
Bs-04 Floor Plan-Basement 4 4 11ZON1 Oct 2024Bs-05 Area Diagram Basement -1 5 11ZON1 Oct 2024Bs-01 Floor Plan-Basement 1 1 11ZON1 Oct 2024Bs-03 Floor Plan-Basement 3 3 11ZON1 Oct 2024Bs-02 Floor Plan-Basement 2 2 11ZON1 Oct 2024Bs-07 Area Diagram Basement -3 7 11ZON1 Oct 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (113 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3015 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.