THE DAHLIAS
by DLF · Sector 54, Gurugram
Not on our price list yet
Possession 31 Dec 2031 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 54, Gurugram6.0 km from Delhi–Gurugram–SNB RRTS, in a straight line
- 12 Sep 2024Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 19 Sep 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 3,000 sq ft and above5,447–9,688 sq ft413
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 8 rows of a single unit, because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads10.07 acres · 61%
- Apartment buildings3.23 acres · 20%
- Parks and playgrounds2.47 acres · 15%
- Club house0.43 acres · 3%
- Other uses0.28 acres · 2%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningOutdoor unit of variable refrigerant FLOW (VRF)
- LiftsBranded make
- FloorsConcrete (M30-M90 as per is-456 is2185)
- WallsBlock WORK
- BathroomsCP fitting, WASH basin, WC
- WindowsSame as point#13
- Main doorMS door
- Electrical fittingsLight fixture for balconies only
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS6.0 km
- Sohna Elevated Corridor (NH-248A)7.4 km
- Dwarka ExpresswayOpen, 17 Aug 202510.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 18
- Registered, no OC or CC yet: 12
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| DLF | Same sector | — | — | 30 Jun 2026 | |
| DLF | Same sector | — | — | 31 Dec 2025 | |
| Godrej Highview | Same sector | Under construction | ₹30,000/sq ft | 16 Oct 2031 | |
| Godrej Highview | 1.4 kmto its sector’s point | New launch | ₹28,000/sq ft | 30 Sep 2032 | |
No photo of the project on file yet | Tulip Infratech | 1.4 kmto its sector’s point | Under construction | — | 17 May 2022 |
DALCORE THE FALCONNo photo on file yet | Ahir Infraspace | 1.4 kmto its sector’s point | — | — | 31 Mar 2031 |
| Godrej Highview | 1.4 kmto its sector’s point | New launch | ₹31,000/sq ft | 31 Aug 2033 | |
No photo of the project on file yet | Vipul Group | 1.4 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is THE DAHLIAS registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/872/604/2024/99. Valid to 31 Dec 2031.
The source ↗What is the possession timeline for THE DAHLIAS?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2031. Its registration runs to 31 Dec 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around THE DAHLIAS?From the records · Map pin and road lines, read 6 Sep 2026
THE DAHLIAS is in Sector 54, Gurugram; the site address declared to HARERA is R16, Dlf 5, Sector 54 Gurugram. In a straight line it is about 6.0 km from Delhi–Gurugram–SNB RRTS, 7.4 km from Sohna Elevated Corridor (NH-248A) and 10.3 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building THE DAHLIAS?From the records · HARERA, read 4 Nov 2026
THE DAHLIAS is a DLF project, registered by its company DLF LIMITED.
The source ↗DLF's projects and court recordThe records
What the registers hold for THE DAHLIAS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/872/604/2024/99: Registered. Valid to 31 Dec 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Licence 129 OF 1995, as the developer typed it: no match in the registers searched.Declared to HARERA, read 29 Oct 2026
- Plans approved, as the developer declared: layout plan 12 Sep 2024, building plans 19 Sep 2024.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 113 HARERA files, with the dates we read them
- Registration no.
- GGM/872/604/2024/99
- Registration valid till
- 31 Dec 2031
- Declared possession
- 31 Dec 2031
Declared by the promoter to HARERA
- Land area
- 16.489 (Acre) (66,728.62 sq m)
- FAR
- 1.75 proposed of 1.75 permissible
- licence
- License Approve by DTCP vide License No. 129 of 1995, 131 of 1995, 38 of 1996, 39 of 1996, 40 of 1996, 52 of 1996, 53 of 1996, 57 of 1996, 02 of 2002, 04 of 2002, 06 of 2002
- Estimated project cost
- ₹6186.52 crore
- Cost of land
- ₹53.09 crore
- Layout plan, declared approved (field 5a)
- 12 Sept 2024
- Building plans, declared approved
- 19 Sept 2024
- Construction to start
- 20 Apr 2024
- Completion declared for
- 31 Dec 2031
Declared inventory · 28 types
Declared inventory — 28 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 1 unit · 1,109.42 sq m carpet · 9 towers
- Apartment/Shops/Other Buildings · 1 unit · 1,108.73 sq m carpet · 9 towers
- Apartment/Shops/Other Buildings · 1 unit · 1,086.82 sq m carpet · 9 towers
- Apartment/Shops/Other Buildings · 1 unit · 1,079.18 sq m carpet · 9 towers
- Apartment/Shops/Other Buildings · 1 unit · 901.92 sq m carpet · 9 towers
- Apartment/Shops/Other Buildings · 5 units · 900.02 sq m carpet · 9 towers
- Apartment/Shops/Other Buildings · 3 units · 850.82 sq m carpet · 9 towers
- Apartment/Shops/Other Buildings · 1 unit · 835.27 sq m carpet · 9 towers
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (1 Aug 2024)
- II. AIRPORT AUTHORITY — declared: already been obtained (26 Dec 2023)
- III. ARAVALI NOC — declared: already been obtained (15 Apr 2024)
- IV. FOREST NOC — declared: already been obtained (18 Mar 2024)
On file with HARERA · 113 files
On file with HARERA (113)
Plans
Site plan
2 filesLayout plan
2 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
4 filesFloor plans
8 filesServices
Service plans
2 filesApprovals and clearances
DTCP licence
3 filesLand records
Land records
3 filesMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
80 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 11 DTCP licences named on the application
The promoter declared 129 OF 1995. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 131 OF 1995. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 38 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 39 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 40 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 52 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 53 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 57 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 02 OF 2002. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 04 OF 2002. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 06 OF 2002. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Aug 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
2 filesBuilding plans
4 filesFloor plans
8 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (113 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3015 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on DLF
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.