THE GROVE
by DLF · Sector 54, Gurugram
Not on our price list yet
Possession 31 Dec 2025 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 54, Gurugram6.0 km from Delhi–Gurugram–SNB RRTS, in a straight line
- 20 Nov 2020Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 29 Nov 2021Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,357–1,490 sq ft144
- 1,500–2,000 sq ft1,504–1,988 sq ft72
- 2,000–2,500 sq ft2,168–2,358 sq ft68
- 2,500–3,000 sq ft2,527 sq ft4
- 3,000 sq ft and above3,093 sq ft4
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings5.307 acres · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningVRV system
- Kitchen appliancesModular kitchen with hob, chimney, oven, microwave, dishwasher, refrigerator, washing machine (at balcony)
- LiftsBranded make
- WardrobesModular wardrobes
- FloorsTile/stone/marble/granite
- WallsEmulsion paint/ wall covering/ marble lift jambs
- WindowsSingle/double glass unit with glass in UPVC / AL / MS frames & shutters
- Main doorPainted/laminated/polished flush door/ SKIN door
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS6.0 km
- Sohna Elevated Corridor (NH-248A)7.4 km
- Dwarka ExpresswayOpen, 17 Aug 202510.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 18
- Registered, no OC or CC yet: 12
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| DLF | Same sector | — | — | 30 Jun 2026 | |
| DLF | Same sector | — | — | 31 Dec 2031 | |
| Godrej Highview | Same sector | Under construction | ₹30,000/sq ft | 16 Oct 2031 | |
| Godrej Highview | 1.4 kmto its sector’s point | New launch | ₹28,000/sq ft | 30 Sep 2032 | |
No photo of the project on file yet | Tulip Infratech | 1.4 kmto its sector’s point | Under construction | — | 17 May 2022 |
DALCORE THE FALCONNo photo on file yet | Ahir Infraspace | 1.4 kmto its sector’s point | — | — | 31 Mar 2031 |
| Godrej Highview | 1.4 kmto its sector’s point | New launch | ₹31,000/sq ft | 31 Aug 2033 | |
No photo of the project on file yet | Vipul Group | 1.4 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is THE GROVE registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/538/270/2022/13. Ended 31 Dec 2025. The register shows it as: Registration expired.
The source ↗What is the possession timeline for THE GROVE?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2025. Its registration runs to 31 Dec 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around THE GROVE?From the records · Map pin and road lines, read 6 Sep 2026
THE GROVE is in Sector 54, Gurugram; the site address declared to HARERA is Dlf 5, Sector 54. In a straight line it is about 6.0 km from Delhi–Gurugram–SNB RRTS, 7.4 km from Sohna Elevated Corridor (NH-248A) and 10.3 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building THE GROVE?From the records · HARERA, read 4 Nov 2026
THE GROVE is a DLF project, registered by its company DLF LIMITED.
The source ↗DLF's projects and court recordThe records
What the registers hold for THE GROVE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/538/270/2022/13: Registration expired. Ended 31 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: layout plan 20 Nov 2020, building plans 29 Nov 2021.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 31 Dec 2025. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 39 HARERA files, with the dates we read them
- Registration no.
- GGM/538/270/2022/13
- Registration valid till
- 31 Dec 2025
- Declared possession
- 31 Dec 2025
Declared by the promoter to HARERA
- Land area
- 5.3073 (Acre) (21,477.88 sq m)
- FAR
- 2.49 proposed of 2.49 permissible
- licence
- Since the development of the Independent Floors is being undertaken on Plot basis, in a licensed Colony, all the conditions of Policy of Independent Floors in State of Haryana as amended from time to time are applicable and are complied with. Services and allied external infrastructure have been laid out for the entire licensed area of residential plotted colony i.e. DLF 5 (earlier known as DLF City Phase V), in which the plots fall.
- Estimated project cost
- ₹696.50 crore
- Cost of land
- ₹223.04 crore
- Layout plan, declared approved (field 5a)
- 20 Nov 2020
- Building plans, declared approved
- 29 Nov 2021
- Construction to start
- 1 Mar 2022
- Completion declared for
- 31 Dec 2025
Declared inventory · 30 types
Declared inventory — 30 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 4 units · 126.101 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 138.467 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 12 units · 128.246 sq m carpet · 3 towers · one flat
- Apartment/Shops/Other Buildings · 20 units · 128.286 sq m carpet · 5 towers · one flat
- Apartment/Shops/Other Buildings · 8 units · 128.295 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 8 units · 128.34 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 4 units · 128.375 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 84 units · 128.463 sq m carpet · 21 towers · one flat
Statutory approvals, as declared · 3
Statutory approvals, as declared
- I. ZONING — declared: already been obtained (26 Oct 2016)
- II. LAYOUT PLAN — declared: already been obtained (20 Nov 2020)
- III. BR-III — declared: already been obtained (28 Nov 2021)
On file with HARERA · 39 files
On file with HARERA (39)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
17 filesServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
9 filesDTCP licence
1 fileLand records
Land records
3 filesMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared Since the development of the Independent Floors is being undertaken on Plot basis, in a licensed Colony, all the conditions of Policy of Independent Floors in State of Haryana as amended from time to time are applicable and are complied with. Services and allied external infrastructure have been laid out for the entire licensed area of residential plotted colony i.e. DLF 5 (earlier known as DLF City Phase V), in which the plots fall.. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Dec 2021 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
17 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (39 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1739 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on DLF
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

