SUMMIT PLAZA
by DLF · Sector 54, Gurugram
Not on our price list yet
Possession 30 Jun 2026 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 54, Gurugram6.0 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Carpet area
- about 720 sq ft
In m²
about 66.9 m², the average flat, as declared
- 2 Jul 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Jun 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings6,079 m² · 57%
- Pavements3,011 m² · 28%
- Parks and playgrounds1,634 m² · 15%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- LiftsBranded make
- FloorsCourtyard - GRIT/pigmented concrete /mosaic /pavers /stone corridors - GRIT/pigmented concrete/ mosaic/ pavers/ stone/ tiles lift lobby/ entrance lobby - stone/ tiles service area /driveway/ passages / parking area - stone/ tiles/ BARE concrete-staircase - stone/ tiles toilet - stone/ tiles
- WallsCourtyard - synthetic washable paint/ exterior grade paint corridors - synthetic washable paint/ exterior grade paint lift lobby/ entrance lobby - acrylic/SEMI acrylic paint service area / driveway /passages / parking area- OBD / staircase- acrylic/SEMI acrylic paint
- Electrical fittingsModular fittings
- Water storageOHT & UGT water tanks
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS6.0 km
- Sohna Elevated Corridor (NH-248A)7.4 km
- Dwarka ExpresswayOpen, 17 Aug 202510.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 18
- Registered, no OC or CC yet: 12
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| DLF | Same sector | — | — | 31 Dec 2025 | |
| DLF | Same sector | — | — | 31 Dec 2031 | |
| Godrej Highview | Same sector | Under construction | ₹30,000/sq ft | 16 Oct 2031 | |
| Godrej Highview | 1.4 kmto its sector’s point | New launch | ₹28,000/sq ft | 30 Sep 2032 | |
No photo of the project on file yet | Tulip Infratech | 1.4 kmto its sector’s point | Under construction | — | 17 May 2022 |
DALCORE THE FALCONNo photo on file yet | Ahir Infraspace | 1.4 kmto its sector’s point | — | — | 31 Mar 2031 |
| Godrej Highview | 1.4 kmto its sector’s point | New launch | ₹31,000/sq ft | 31 Aug 2033 | |
No photo of the project on file yet | Vipul Group | 1.4 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is SUMMIT PLAZA registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/488/220/2021/56. Ended 30 Jun 2026. The register shows it as: Registration expired.
The source ↗What is the possession timeline for SUMMIT PLAZA?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Jun 2026. Its registration runs to 30 Jun 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around SUMMIT PLAZA?From the records · Map pin and road lines, read 6 Sep 2026
SUMMIT PLAZA is in Sector 54, Gurugram; the site address declared to HARERA is Dlf City Phase V, Sector 54. In a straight line it is about 6.0 km from Delhi–Gurugram–SNB RRTS, 7.4 km from Sohna Elevated Corridor (NH-248A) and 10.3 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building SUMMIT PLAZA?From the records · HARERA, read 4 Nov 2026
SUMMIT PLAZA is a DLF project, registered by its company DLF LIMITED.
The source ↗DLF's projects and court recordThe records
What the registers hold for SUMMIT PLAZA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/488/220/2021/56: Registration expired. Ended 30 Jun 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Licence 115 OF 1995, as the developer typed it: no match in the registers searched.Declared to HARERA, read 29 Oct 2026
- Plans approved, as the developer declared: layout plan 2 Jul 2021, building plans 2 Jul 2021.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 30 Jun 2026. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 19 HARERA files, with the dates we read them
- Registration no.
- GGM/488/220/2021/56
- Registration valid till
- 30 Jun 2026
- Declared possession
- 30 Jun 2026
Declared by the promoter to HARERA
- Land area
- 2.65 (Acre) (10,724.17 sq m)
- FAR
- 2.82 proposed of 2.83 permissible
- licence
- 1. 115 of 1995 (valid upto 28/12/2024) 2. 116 of 1995 (valid upto 28/12/2024) 3. 54 of 1996 (valid upto 29/04/2024) 4. 55 of 1996 (valid upto 29/04/2024) 5. 56 of 1996 (valid upto 29/04/2024)
- Estimated project cost
- ₹252.83 crore
- Cost of land
- ₹12.09 crore
- Layout plan, declared approved (field 5a)
- 2 Jul 2021
- Building plans, declared approved
- 2 Jul 2021
- Construction to start
- 1 Sept 2021
- Completion declared for
- 30 Jun 2026
Declared inventory · 1 type
Declared inventory
- Apartment/Shops/Other Buildings · 311 units · 20,809.92 sq m carpet · 1 tower · total for 311 flats, about 66.9 m² each
Statutory approvals, as declared · 13
Statutory approvals, as declared
- I. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (9 Oct 2020)
- II. LICENSE, RENEWAL LC NO. 54,55 & 56 OF 1996 — declared: already been obtained (11 Jun 2021)
- III. ZONING APPROVAL — declared: already been obtained (12 Oct 2020)
- IV. TRANSIT ORIENTED DEVELOPMENT (TOD) APPROVAL — declared: already been obtained (14 Oct 2020)
- V. BR-III — declared: already been obtained (2 Jul 2021)
- VI. AAI NOC — declared: already been obtained (13 Apr 2020)
- VII. ENVIRONMENTAL CLEARANCE — declared: already been obtained (11 Jan 2021)
- VIII. FOREST NOC — declared: already been obtained (4 Nov 2020)
- IX. NATURAL CONSERVATION ZONE NOC — declared: already been obtained (20 Nov 2020)
- X. TREE FELLING PERMISSION — declared: already been obtained (12 Nov 2020)
- XI. CONSENT TO ESTABLISH — declared: already been obtained (18 Feb 2021)
- XII. LICENSE, RENEWAL LC NO. 115 & 116 OF 1995 — declared: already been obtained (11 Mar 2020)
- XIII. MINING — declared: applied for but yet to receive (12 Jul 2021)
On file with HARERA · 19 files
On file with HARERA (19)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
1 fileLand records
Land records
1 fileSales papers
Brochure and specifications
1 fileMoney
Accounts and finance
4 filesThe promoter’s papers
Declarations and affidavits
4 filesHARERA’s orders
HARERA’s orders
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 5 DTCP licences named on the application
The promoter declared 115 OF 1995. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 116 OF 1995. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 54 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 55 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
The promoter declared 56 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Jul 2021 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (19 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1656 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on DLF
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.