Under construction

Emaar Amaris

by Emaar India · Sector 62, Gurugram

₹18,000 a sq ftof carpet area

Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 30 Aug 2030 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 62, Gurugram3.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
1,053–1,839 sq ft
In m²about 98–171 m², as declared
Asking rate
₹18,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
EMAAR INDIA LIMITEDthe company that filed it, for Emaar India
Timeline
  1. 16 Oct 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Aug 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

522homes, 1,053 to 1,839 sq ft of carpet area
  • 1,000–1,500 sq ft1,053–1,460 sq ft270
  • 1,500–2,000 sq ft1,640–1,839 sq ft252

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6.1 acres in all, by use
  • Parks and playgrounds2.73 acres · 45%
  • Roads1.97 acres · 32%
  • Apartment buildings0.87 acres · 14%
  • Club house0.3 acres · 5%
  • Other usesas the form names them: Construction, Area, Area0.23 acres · 4%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningStandard make,split/VRV or equivalent system
  • KitchenStandard make, good quality
  • Kitchen appliancesStandard make
  • Lifts2/3/4 flats and lift - 3 no.S
  • WardrobesStandard make
  • FloorsTiles/wooden flooring
  • WallsAcrylic emulsion/plastic emulsion/OBD/white WASH
  • BathroomsStandard make, good quality

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 62, GurugramSector 62, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)3.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20258.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 5
  • Registered, no OC or CC yet: 14
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Emaar Amaris registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/885/617/2024/112. Valid to 30 Aug 2030.

The source ↗
What is the possession timeline for Emaar Amaris?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Aug 2030. Its registration runs to 30 Aug 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Emaar Amaris?From the records · Map pin and road lines, read 6 Sep 2026

Emaar Amaris is in Sector 62, Gurugram; the site address declared to HARERA is Sector 62, Gurugram,Haryana. In a straight line it is about 3.8 km from Sohna Elevated Corridor (NH-248A), 6.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.

The source ↗
What does a home in Emaar Amaris cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026

The Bhumiq team's price list has ₹18,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Emaar Amaris: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/885/617/2024/112: Registered. Valid to 30 Aug 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 265 OF 2007 is on the DTCP register: Licence lapsed; the register prints its validity to 1 Dec 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 16 Oct 2024, building plans 16 Oct 2024.Declared to HARERA, read 29 Oct 2026
The court record of Emaar India’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 265 OF 2007 lapsed

    Named in this project’s application. Valid to 1 Dec 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 87 HARERA files, with the dates we read them
Registration no.
GGM/885/617/2024/112
Registration valid till
30 Aug 2030
Declared possession
30 Aug 2030
Asking price (indicative)
₹18,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
6.118 (Acre) (24,758.67 sq m)
FAR
1.6 proposed of 2.49 permissible
licence
265 of 2007
Estimated project cost
₹1076.80 crore
Cost of land
₹30.29 crore
Layout plan, declared approved (field 5a)
16 Oct 2024
Building plans, declared approved
16 Oct 2024
Construction to start
1 Sept 2024
Completion declared for
30 Aug 2030
Declared inventory · 13 types

Declared inventory — 13 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 29 units · 170.05 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 30 units · 170.83 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 158 units · 152.98 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 2 units · 152.43 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 29 units · 155.1 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 197 units · 117.95 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 61 units · 117.43 sq m carpet · one flat
  • Apartment/Shops/Other Buildings · 2 units · 134.79 sq m carpet · one flat
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. APPROVAL OF BUILDING PLAN — declared: already been obtained (16 Oct 2024)
  • II. LICENSE — declared: already been obtained (2 Dec 2007)
  • III. HEIGHT CLEARANCE — declared: already been obtained (30 Jan 2022)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (18 Dec 2024)
  • V. ELECTRICITY LOAD SANCTION — declared: already been obtained (20 Mar 2023)
  • VI. ZONING PLAN — declared: already been obtained (16 Jul 2024)
  • VII. MINING PERMISSION — declared: already been obtained (20 Mar 2024)
  • VIII. PERMISSION FOR SEWERAGE CONNECTION — declared: already been obtained (11 Jul 2023)
  • IX. PERMISSION FOR STORM WATER DRAINING SYSTEM — declared: already been obtained (13 Jul 2023)
  • X. WATER SUPPLY CONNECTION — declared: already been obtained (10 Jun 2023)
  • XI. APPROVAL OF ELECTRIFICATION PLAN — declared: already been obtained (6 Apr 2022)
On file with HARERA · 87 files

On file with HARERA (87)

Plans

Site plan

4 files
Approved Site Plan20 Dec 2024Site Plan22 Nov 2024Site Plan Services Estimate22 Nov 2024Site Plan22 Nov 2024

Layout plan

1 file
Latest Layout Plan7 Nov 2024

Zoning plan

1 file
Zoning Plan7 Nov 2024

Demarcation plan

2 files
Superimposed Demarcation22 Nov 2024Demarcation Plan7 Nov 2024

Building plans

16 files
Club Terrace Plan22 Nov 2024Club Elevation and Section22 Nov 2024T2 Elevation22 Nov 2024

Floor plans

14 files
Basement Plan22 Nov 2024T3 33 & 34 Floor Plan22 Nov 2024EWS and Convenient Shoppping22 Nov 2024

Services

Sewerage and drainage

2 files
Sewarage Layout22 Nov 2024Storm Water Layout22 Nov 2024

Water supply

2 files
Domestic Water Supply22 Nov 2024Flushing & Irrigation Water Supply Layout22 Nov 2024

Electricity

1 file
Electrical Load Availability Connection22 Nov 2024

Roads

1 file
Road Marked-Site-Plan22 Nov 2024

Landscape and green areas

1 file
Green Area Plan22 Nov 2024

Service plans

2 files
Service Plan Estimate Report22 Nov 2024Service Plans on the Layout8 Nov 2024

Approvals and clearances

DTCP licence

3 files
LOI22 Nov 2024LC-IV. 14.025 Acres22 Nov 2024Licence Copy with Land Schedule22 Nov 2024

Environment clearance

1 file
Environment Clearance22 Nov 2024

Fire safety

1 file
Fire Fighting Layout22 Nov 2024

Other NOCs and clearances

3 files
Forest NOC22 Nov 2024Construction Water NOC22 Nov 2024Mining Permission22 Nov 2024

Land records

Land records

12 files
Supplementary Collaboration Agreement 122 Nov 2024Aks Shajra22 Nov 2024Jamabandi22 Nov 2024

Sales papers

Brochure and specifications

1 file
Marketing Brochure22 Nov 2024

Money

Accounts and finance

4 files
Cash Flow Statement20 Dec 2024CA Certificate on the Application’s Figures20 Dec 2024Non-Default Certificate from a CA22 Nov 2024CA Certificate for Cost Expense22 Nov 2024

Timeline and progress

Construction schedule

1 file
PERT Chart22 Nov 2024

The promoter’s papers

Declarations and affidavits

3 files
Bank Account Affidavit 42LD22 Nov 2024Bank Undertaking Amaris22 Nov 2024The Promoter’s Declaration on Affidavit7 Nov 2024

Other filings

Other filings

11 files
T4 Ff Plan22 Nov 2024BR Lll22 Nov 2024T2 32 & 33 Plan22 Nov 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

265 OF 2007 · Emaar MGF Land Ltd. · GURGAON-MANESAR

Licence valid to 1 Dec 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 8 Nov 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

265 OF 2007

DTCP’s page showed no land schedule for licence 265 OF 2007 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, residential flat
₹9,900 per sq ft

Sector 62, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Approved Site Plan20 Dec 2024Site Plan22 Nov 2024Site Plan Services Estimate22 Nov 2024Site Plan22 Nov 2024

Layout plan

1 file
Latest Layout Plan7 Nov 2024

Building plans

16 files
Club Terrace Plan22 Nov 2024Club Elevation and Section22 Nov 2024T2 Elevation22 Nov 2024EWS and Convenient Shopping Elevation22 Nov 2024T1 Section22 Nov 2024T2 Terrace Plan22 Nov 2024

Floor plans

14 files
Basement Plan22 Nov 2024T3 33 & 34 Floor Plan22 Nov 2024EWS and Convenient Shoppping22 Nov 2024T4 Typical Floor Plan22 Nov 202432 & 33 Floor Plan22 Nov 2024Basement Area Diagram22 Nov 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (87 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3180 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Emaar India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.