Skip to content

Indiabulls One09 [Phase-II]

by Citra Properties · Sector 109, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 109, Gurugram0.8 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
13 Oct 2017
Registered by
CITRA PROPERTIES LIMITEDthe company that filed it, for Citra Properties
Timeline
  1. 13 Oct 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 17 Oct 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 May 2026Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.11 acres in all, by use
  • Other usesas the form names them: Area, Storm0.341 acres · 31%
  • Pavements0.281 acres · 25%
  • Roads0.258 acres · 23%
  • Parks and playgrounds0.23 acres · 21%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningHigh side provising with DX water cooled system
  • KitchenFinished with tiles and counter stone
  • Lifts10 lifts of johnson & 8 of KONE
  • FloorsVitrified tiles
  • WallsTiles and paints
  • BathroomsJaquar make
  • WindowsPunch window with glass
  • Main doorFlush door for office space and glass door for shops

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 109, GurugramSector 109, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS5.3 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Indiabulls One09 [Phase-II] registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 298 OF 2017, registered on 13 Oct 2017. Ended 31 May 2026. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Indiabulls One09 [Phase-II]?From the records · Map pin and road lines, read 6 Sep 2026

Indiabulls One09 [Phase-II] is in Sector 109, Gurugram; the site address declared to HARERA is Sector 109, Pawala Khusrupur. In a straight line it is about 0.8 km from Dwarka Expressway, 5.3 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Indiabulls One09 [Phase-II]?From the records · HARERA, read 4 Nov 2026

Indiabulls One09 [Phase-II] is a Citra Properties project, registered by its company CITRA PROPERTIES LIMITED.

The source ↗Citra Properties's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Indiabulls One09 [Phase-II]: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 298 OF 2017: Registration expired. Ended 31 May 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 43 OF 2012 is on the DTCP register, valid to 4 May 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 17 Oct 2019, building plans 17 Oct 2019.Declared to HARERA, read 29 Oct 2026
The court record of Citra Properties’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 May 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 14 HARERA files, with the dates we read them
Registration no.
298 OF 2017
Registration date
13 Oct 2017
Registration valid till
31 May 2026

Declared by the promoter to HARERA

Land area
1.11 (Acre) (4,492.01 sq m)
FAR
1.68 proposed of 1.75 permissible
licence
43 of 2012 dated 05.05.2012
Estimated project cost
₹236.15 crore
Cost of land
₹18.45 crore
Layout plan, declared approved (field 5a)
17 Oct 2019
Building plans, declared approved
17 Oct 2019
Declared inventory · 4 types

Declared inventory

  • Type OUTDOOR KISOKS · 6 units · 102 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP · 33 units · 1,581 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type F&B · 1 unit · 67 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE · 344 units · 18,116 sq m carpet
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. ZONING PLAN APPROVAL — declared: already been obtained (7 May 2012)
  • II. BUILDING/SITE PLAN APPROVAL — declared: already been obtained (17 Oct 2019)
  • III. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (7 Jun 2016)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (6 May 2019)
  • V. LICENSE APPROVAL — declared: already been obtained (5 May 2012)
  • VI. SERVICE ESTIMATES APPROVAL — declared: already been obtained (12 Dec 2012)
  • VII. FIRE SCHEME APPROVAL (4 Dec 2012)
On file with HARERA · 14 files

On file with HARERA (14)

Plans

Site plan

1 file
Approved Site Plan8 Apr 2024

Layout plan

1 file
Latest Layout Plan8 Apr 2024

Zoning plan

1 file
Zoning Plan8 Apr 2024

Demarcation plan

1 file
Demarcation Plan8 Apr 2024

Services

Service plans

1 file
Service Plans on the Layout8 Apr 2024

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded27 Jul 2026

DTCP licence

1 file
Licence Copy with Land Schedule8 Apr 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration8 Apr 2024

Money

Accounts and finance

3 files
Cash Flow Statement8 Apr 2024CA Certificate on the Application’s Figures8 Apr 2024Non-Default Certificate from a CA8 Apr 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit8 Apr 2024

Other filings

Other filings

2 files
Project Continuation- RC/REP/HARERA/GGM/298 of 2017/ 7(3)/2022/6 Dated 22.01.202524 Jan 2025Project Continuation- RC/REP/HARERA/GGM/298 of 2017/ 7(3)/2022/6 Dated 30.08.20221 Dec 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

43 OF 2012 · Citra Properties Ltd. · GURGAON-MANESAR

Licence valid to 4 May 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Apr 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

43 OF 2012: 7 parcels, 5.9 acres in all, in Parwala khusrupur (hadbast 54), tehsil Kadipur.

The licence register prints the same licensed area, 5.9 acres.

  • 11//158 kanal
  • 11//68 kanal
  • 12//118 kanal
  • 12//19min7 kanal 13 marla
Show the other 3 parcels
  • 12//207 kanal 10 marla
  • 12//201 marla
  • 12//218 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Parwala khusrupur (hadbast 54), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 11//15.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,52,000 per sq yd

Sector 109, collector rates effective 1 Apr 2026, Kadipur tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan8 Apr 2024

Layout plan

1 file
Latest Layout Plan8 Apr 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (14 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2888 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Citra Properties

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.